Clay
Sand
Isotropic compression
Shearing
WHY VIBROCOMPACTION?
- Improve bearing capacity.
- Reduce settlement.
- Improve shearing resistance.
Empirical design
Observation approach
Monitoring of operation
In-situ checking
Statistical evaluation
MAIN METHODS
SAND
SILT
CLAY
VIBROFLOTATION
BLASTING
PARTICULATE GROUT
CHEMICAL GROUT
COMPACTION GROUTING
PRELOADING - VERTICAL DRAINS
DYNAMIC CONSOLIDATION
STONE PILLAR
ELECTRO-OSMOSIS
PREWETTING
10
0,1
0,01
0,001
0,0001
VIBROFLOTATION
VIBRO. METHODS
VIBROCOMPACTION
in situ densification of granular soils.
VIBROREPLACEMENT
Construction of stone columns, using
water as a flushing medium.
VIBRODISPLACEMENT
Construction of stone columns, using
compressed air as a flushing medium.
Principles
Process
1 - DESCENDING STAGE - action effect
of vibrations, water jet and weight
of vibroflot - quick descent.
2 - FILLING BY APPROPRIATE MATERIAL
- usually local material
Vibroflotation
BEFOR
vibroflotation
AFTER
vibroflotation
Vibroflotation
Dubai, Palm
Island
V48 vibroprobes
operating in tandem
on The Palm
Jumeirah
Over 9 million m3 of
vibrocompaction carried out
by Vibro Foundations Ltd
Craters generated
by V48 vibroprobes
Vibroflot
130 kW
with horizontal
impact
Vibroflotation
Site application
examples
Vibroflotation
12,8 millions m3
compacted sands
Compacting of sea floor soils and fills
Vibroflotation
C. P. T. (MPa)
Depth (m)
Hong-Kong
airport Chek Lap Kok
AFTER
VF
BEFORE
VF
Vibroflotation
STONE COLUMNS
Principles
GRAVEL
Application range
SAND
SILT
CLAY
VIBROFLOTATION
STONE COLUMNS
10
0,1
0,01
0,001
0,0001
Stone columns
b) stone column
ro
s
b
v
b
1 sin
. ro 4C
1 sin
Stone columns
Penetration
The Vibroprobe
penetrates by vibration
and aid of compressed
air to the required
depth.
Installation
The stone column is
installed by adding gravel
through the separate gravel
duct alongside the
Vibroprobe.
Completion
The surface is levelled
and eventually roller
compacted.
consolidated
soil
Stone columns
Pennys Bay
dry bottom
feed rig in
operation
Detail
of vibrator
outlet
Stone columns
60 m
Stone columns
Depth (m)
AFTER
treatment
BEFORE
treatment
Stone columns
Site application
examples
Vibro-displacement
Construction of an industrial
zone in Annency (France)
Requirements :
- minimum settlement, total
and uneven
- earthquake resistance
- bearing capacity 500 kPa
Design :
Finite element (PLAXIS) analysis
Piers 0,7 m, grid 3,2 m,
16 500 m
Execution :
SOLVIBRO set
Stone columns
AFTER
treatment
Results :
- Improving rate 2 - 3
- Total settlement 4 cm
- Uneven settlement 1 cm
Stone columns
Offshore Stone
Columns
Control during
Installation
Number of compaction or
stone column.
Time started, Time finished.
Amount of backfill used (in
stone columns).
Maximum depth reached.
Remarks : For example,
details of breakdowns, with
reason and time.
Copy of the power-depth log.
Palm
Island
Example
Quality
Record
Vertical drains
Principles
Usually
realised
embankment.
with
pre-consolidation
Vertical drains
Band drains
Vertical drains
Site application
examples
Band drains
Rig production:
2 500 m/day
Vertical drains
Band drains
Vertical drains
Site application
examples
Band drains
Vertical drains
Band drains
Vertical drains