Objective
To design a highway which capable of
accommodating a maximum of traffic volume of
average daily traffic (ADT) of 10,175 vehicles so
that a rise in socio-economy of Samarahan can
be achieved
Project Detail
Proposed road will start from point C
(N5158000, E2075500) to point F (N5158500,
E2078000) in the map
Rolling terrain
Design standard,R5.
Road category is highway
Partial control of access
Road Design
Proposed Elevation
30.00
25.00
Existing
Level
20.00
Proposed
level
15.00
10.00
5.00
0
500
1000
1500
Chainage
2000
2500
3000
Total area of
embankment is
128844m
30000
20000
10000
0
0
500
1000
1500
-10000
-20000
-30000
-40000
Chainage
2000
2500
Total different is
35413m
Horizontal Alignment
First curve
Minimum radius (m)
Second curve
242.08
650
300
397
165
Central angle ()
35
23
Stopping sight
distance, SSD (m)
211
120
Superelevation
Vertical Alignment
Stopping sight distance (SSD) = 160m
Length of curve for sagging = 180m
Length of curve for crest = 120m
Slope grade = 1.9%
Full Vertical Alingment
20
Elevation
18
Proposed elevation
Full curve
16
14
700
800
900
1000
1100
Chainage
1200
1300
1400
24
Elevation
22
Proposed elevation
Full curve
20
18
1850
1950
2050
2150
2250
Chainage
2350
2450
2550
Value
Comment
= 2.58 million
ESALDES
69.3 million
Traffic category T5
Characteristic sub
grade modulus
value
134.65 Mpa
Sub-grade category
SG3,
Option 1 :
Full depth asphalt
pavement with
unmodified penetration
70/100.
Advantages :
- Cost
- Durability
- Sources available
- Maintenance
- Long life span
Bridge
Location of bridge : chainage 1+850 to 1+870
Length = 20m
Beam bridge
Cost effective, easy to manufacture
Can resist bending and twisting
Drainage
Types of drainage design:
1. Traversable Ditch with Concrete Lining
2. Symmetrical or V-shaped Ditch
Symmetrical or V-shaped
Ditch
Drainage Maintenance
Cutlassing or cleaning off the ditch regularly to avoid
them from silting up and sending water back to the road.
Provide vegetation to reduce soil erosion at the side
slope of the V-shaped ditch.
Conclusion
Route length is 2.615km with one bridge.
Road standard of R5 with design speed of
85km/hour.
Design consideration is following the standard
Embankment volume > Excavation volume
Therefore, volume of soil needed to fill in for
project purposed is 35413m.
Hopefully can improved the quality of road in
Sarawak by performing good design, better
option for road pavement, effective bridge and
drainage system design.