Bug holes/Pinholes
Honeycombing
Exposed Reinforcing steel / Concrete Cover
Cold joints
Irregular surface
Popouts /Bulges
Picture Good
Picture Good
Picture Good
Picture Good
Picture Good
Picture Good
Picture Bad
Picture Good
Possible Causes
Poor Concrete compaction due to ineffective vibration or
Rebar congestion.
Concrete slurry leakage along the perimeter side forms due
to:
*Loose or missing supports /fixing bolts
* Damaged Rubber gasket seal.
* Defective formwork/Mould
Inadequate concrete vibrator and negligence to vibrate
Less concrete cover and spacing between the reinforcement
Inadequate supervision and no hammering the side surface to
remove the voids/Bubbles .
Remedial Measures
Honeycombing and pin holes must be rectified immediate
after stripping of sides with approved repairing Material.
Excessive Honeycombing & loose partials must be cleaned
Vibration
Picture Bad
Picture Good
Proper Vibration will avoid the Honey Comb, Pin hole Defects
Formwork / Mould
Picture Bad
Picture Good
Proper form Work / Mould will avoid the Concrete Slurry Defects
Picture Good
Proper Covering Block will avoid the Rebar Exposed Defects and Design
Failure
Supervision or a Combination
Dimensional Deviations, Chip off & Damages
Supervision or a Combination
Dimensional & Formwork Deviations
Possible Causes
Mould of forms may not be sufficiently rigid to maintain
specified tolerance during concrete pouring
Precast elements may not have gained sufficient concrete
strength when demoulded.
Train Operators and Riggers for Safe Lifting Operation
Top surface finish of precast elements may not be properly
leveled and troweled during production which result in
different levels & surface undulation.
Remedial Measures
For minor deviation, corrective measures such as surface
grinding. Trimming/hacking and skim coat application can be
appropriately used to remedy the situation.
Strictly follow the approved Method Statement .
Stripping and Lifting strictly follow the Cube results.
Supervision or a Combination
Surface Cracks
Supervision or a Combination
Surface Cracks
Possible Causes
Lifting and Stripping of Precast units before concrete mature
Cracks may have accrued during initial lifting due to friction
between the elements and casting Mould forms.
Inadequate supervision & Improper curing method; curing
time &temperature variations leads cracks on the surface
Uncontrolled concrete mix and Negligence while pumping
concrete, such as excess water and excess floating
Inadequate handling Techniques
Insufficient lifting points; No appropriate tools & method
while lifting precast units.
Type of Cracks
A. Before Hardening:
B. After Hardening:
Early frost damage
Physical reactivity
Plastic
Chemical reactivity
Construction Movement Thermal contraction/reactivity
Structural impact/Design loads
Test Paper
1. Which will avoid the Honey Comb, Pin hole Defects ?
a. Leveling b. Vibrator c. Shuttering oil
2. Which will avoid the Concrete Slurry Defects ?
a. Proper Form Work b. Steel Work c. Cover Block
3. Which will avoid the Rebar Exposed Defects and Design Failure ?
a. Block Work b. Cover Block c. Form Work
4. What are the damages occurred due to Inadequate Supervision?
a. Dimensional deviation b. Pin hole c. Honey Comb
5. What type of crack Observed Before Hardening ?
Thank you