Ring Road Proposal

PWD

Pune Ring Road


To avoid traffic congestion in the city it is
necessary to have a ring road for Pune.
Decision taken in the meeting conducted by
Honble Chief Minister on 12/06/2007.
Pune and Pimpri Chinchwad Municipal
Corporation to make necessary provision in their
Development Plan.
PWD to implement the project on BOT basis.

Ring road alignment

Survey of following stretches of ring road


undertaken.

Part I Theurphata NH9, Kesnand, Wagholi,


Bhavdi,Tulapur, Alandi, Kelgaon, Chimbli, NH50.

Part II NH50, Chimbli Moi, Nighoje, Sangurde, Shelarwadi,


Chandkhed, Pachne, Pimploli, Rihe, Ghotawde,
Pirangutphat.

Part III Pirangut, Bhugaon, Chandni Chowk, Ambegaon,


Katraj.

Part IV Ambegaon, Katraj, Mangdewadi, Wadachiwadi,


Holkarwadi, Wadkinaka, Ramdara, Theurphata, NH9

Proposed Ring road - Map

Detail survey of Part I , II and IV


completed.
Presentation was made on 19.04.2008.
As Part III and IV are very close to the city
limits considering rapid growth of city
Revised Alignment based on toposheets
and google earth images for Part III & IV
is considered.

Alignment Details
Part I

Theurphata NH9, Kesnand, Wagholi,


Bhavdi,Tulapur, Alandi, Kelgaon,
Chimbli, NH50.

39.89 km

Part II

Chimboli phata to Nighoje to Sangurde,


Shelarwadi, Shirgaon, Chandkhed,
Pimploli, rihe, Ghotawde, Pirangutphat.

46.40 km

Part
III

Pirangut, Urwade, Mutha Bahuli,


Sangrun, Nigde, Khamgaon, Ghera
Sinhgad, Kalyan, Kondanpur,
Shriramnagar

51.20 km

Part
IV

NH4 , Gogalwadi, Patharwadi, Bhivri,


Kanifnath, New Mula Mutha canal,
Theurphata, NH9

32.24 km

After the alignment of Part III & IV is finalised


detail survey work will be undertaken.

Acquisition Proposed
Ring road length

169.73km

Land Acquisition cost

Rs. 2374.00 crores

Construction cost
Total cost

Rs. 6065.00 crores


Rs. 8439.00 crores.

Satelite townships in 38.38km stretch in balance


width of 200m (expected area 8,25,93,760 sq.ft)
by giving FSI of 1.0 + additional 1.0 = 2.0 the
expected revenue Rs. 9228.00 crores.

Approx. estimates
Acquisition is proposed for 38.38km length 300m width,
121.12km length 100m width and 10.44km length 45 to 60m.
Acquisition cost - Rs. 2374 crores.
Construction cost Rs. 6065 crores.
For the stretch of 38.38km road length acquisition is proposed for
300m width and the width balance after that required for road
i.e. 200m will be developed with additional FSI of 1.0 over and
above existing 1.0 FSI to make the project financially viable.
State Govt. to approve the project on a PPP model without toll
alongwith concession of extra FSI.

Details of Ring road


Name of the Road

Length
in m

Flyovers
Road
Length
in m

Railway
length
in m

Majo
r
bridg
es
lengt
h in
m

Mino
r
bridg
es
lengt
h in
m

Viadu
cts
bridg
es
lengt
h in
m

Under pass
length

Elevat
ed
road

Land Acquisition
100 m
width
area in
hectare
s

300m
width
road
area in
hectares

11

12

13

14

2750

355

132

3490

242.6

695.8

425

255.00

Part I Theurphata, NH9,


Kesnand, Wagholi, Bhavdi,
Tulapur, Alandi, Kelgaon,
Chimbli, NH50

39.89

650

300

490

450

1260

Part II Chimboliphata to
Nighoje to Sangurde,
Shelarwadi, NH4, Shirgaon,
Chandkhed, Rihe,
Ghotawde, Pirangut.

46.400

160

200

850

300

630

Part III Pirangut, Urwade,


Mutha Bahuli, Sangrun,
Nigde, Khamgaon, Ghera
Sinhgad, Kalyan,
Kondanpur, Shriramnagar.

51.200

1850

1520

300

3070

90

2928

Part IV NH4, Gogalwadi,


Patharwadi, Bhivri,
Kanifnath, New Mula
Mutha canal, Theurphata,
NH9

32.240

500

150

150

2250

980

8050

1200

203.00
55.70

45.00

169.940

3160

650

1200

5320

2960

11628

7440

1281.4

1116.8

2860

10

Tunnel
s
length
in m

120

120

650