PWD
Alignment Details
Part I
39.89 km
Part II
46.40 km
Part
III
51.20 km
Part
IV
32.24 km
Acquisition Proposed
Ring road length
169.73km
Construction cost
Total cost
Approx. estimates
Acquisition is proposed for 38.38km length 300m width,
121.12km length 100m width and 10.44km length 45 to 60m.
Acquisition cost - Rs. 2374 crores.
Construction cost Rs. 6065 crores.
For the stretch of 38.38km road length acquisition is proposed for
300m width and the width balance after that required for road
i.e. 200m will be developed with additional FSI of 1.0 over and
above existing 1.0 FSI to make the project financially viable.
State Govt. to approve the project on a PPP model without toll
alongwith concession of extra FSI.
Length
in m
Flyovers
Road
Length
in m
Railway
length
in m
Majo
r
bridg
es
lengt
h in
m
Mino
r
bridg
es
lengt
h in
m
Viadu
cts
bridg
es
lengt
h in
m
Under pass
length
Elevat
ed
road
Land Acquisition
100 m
width
area in
hectare
s
300m
width
road
area in
hectares
11
12
13
14
2750
355
132
3490
242.6
695.8
425
255.00
39.89
650
300
490
450
1260
Part II Chimboliphata to
Nighoje to Sangurde,
Shelarwadi, NH4, Shirgaon,
Chandkhed, Rihe,
Ghotawde, Pirangut.
46.400
160
200
850
300
630
51.200
1850
1520
300
3070
90
2928
32.240
500
150
150
2250
980
8050
1200
203.00
55.70
45.00
169.940
3160
650
1200
5320
2960
11628
7440
1281.4
1116.8
2860
10
Tunnel
s
length
in m
120
120
650