Escolar Documentos
Profissional Documentos
Cultura Documentos
INDUSTRIAL
TRAINING (SIT)
PCSB - PMO
PRESENTATIO
N OUTLINE
PRESENTATION OUTLINE
Overview of
Company
Projects
Involvement
Activities
Knowledge
Gained
Conclusion
OVERVIEW OF COMPANY
PETRONAS
OVERVIEW OF COMPANY
VISION AND MISSION
Vision Statement
To be a Leading Oil and Gas Multinational of Choice
Mission Statement
We are a business entity
Petroleum is our core business
Our primary responsibility is to develop and add value to
this national resource
Our objective is to contribute to the well-being of the
people and the nation
OVERVIEW OF COMPANY
BUSINESS, PRODUCTS & SERVICES
Upstream & Downstream Operation
Oil / Petchem
Gas / Power
Logistics / Maritime
Technology / Engineering
Properties
Education
OVERVIEW OF COMPANY
PETRONAS CORE
BUSINESS
OVERVIEW OF COMPANY
PETRONAS CARI GALI
SDN
BHD
Founded
on 11th May 1978
Domestic
PCSB
Exploratio
n&
Production
Operation
Internati
onal
OVERVIEW OF COMPANY
PCSB International
Operation
OVERVIEW OF COMPANY
PCSB Domestic
Operation
Peninsul
ar
Malaysi
a
Operati
on
Sabah (PMO)
Operati
on
(SBO)
Sarawak
Operati
on
(SKO)
PROJECTS INVOLVEMENT
DULANG
INSTRUMENT
UPGRADE FOR IO
PROJECT
FACILITIES
IMPROVEMENT
PROJECT AT
TINGGI-A
DOCUMENT
SEARCH
DISCUSSION
WITH VENDOR
DOCUMENT
SEARCH
DISCUSSION
WITH VENDOR
DOCUMENT
SEARCH
ANALYZE
P & ID
FACTORY
ACCEPTANCE
TEST FOR
COMPACT
ORIFICE
PREPARE
DATASHEET
DOCUMENT
SEARCH
PREPARE
DATASHEET
INSTRUMENT
INDEX UPDATE
FACTORY
ACCEPTANCE
TEST FOR
FLOW
CONTROL
VALVE
INSTRUMENTED
CONTROL PANEL
ONSHORE GAS
TERMINAL
SITE VISIT
WITH
INSTRUMENT
ENGINEER
LCV 2024
UPGRADE AT
PULAI A
ACTIVITIES
ACTIVITIES
Factory Acceptance Test (FAT) for
Compact
Orifice
Orifice A plate
that is used to create differential pressure to get the
reading of flow.
Compact orifice Transmitter consist of orifice plate, strainer &
Tools used during
temperature sensor
FAT
Hand
pump
HART
communicat
or
Multimet
er
Caliper
s
ACTIVITIES
1. Test for differential
pressure
Hand
pump
Compact
orifice
ACTIVITIES
2. Test for temperature
sensor
RTD - 3
wires
Connection to test
temperature sensor
ACTIVITIES
3. Checking the bore size and diameter of
the orifice
Diameter of the
orifice
Bore size
ACTIVITIES
Preparing Datasheet
Prepare datasheet for LCV 120 for Facilities
Improvement Project at Tinggi - A
Valve that need
to be replaced
KNOWLEDGE
GAINED
KNOWLEDGE GAINED
Understand
basic P&ID
Prepare datasheet
Flow,
Temperature,
Pressure, Level
CONCLUSION
Exposed to industrial real-life working experience
Gained new skills and knowledge related to the line of
study
Opportunity to strengthen communication and
management skills
THANK YOU