Contract Summary - Gaya, Nawada &


Jehanabad
1.
NewGKC-APL
PSS
M/s
JV, Hyderabad, NIT # 196
Mayabigha and Majhwe, Nawada
Land Made Available on 17-12-2014 - Boundary wall work started at both PSS.
Dakhshini Jehanabad
Boundary wall Completed. 33KV foundation work of equipment is completed and
11KV equipment foundation is also completed except BPI foundation. Control
room brick work with roof casting completed . Remaining works like fixing of
doors & window, plaster work, electrification etc. to be done.
2. R & M work 39 Nos Work of R&M in progress at all PSS . All PTRs augmented
so for (Total 05 Nos.). 52 nos. 33 KV VCB erected out of total 72 (71%) and 127nos.
11KV VCB erected out 131(97%). During last month 1 nos. 33KV VCB erected.
3. New 33 KV Line 48 CKm 51 Rail pole erected out of 999 (5%). Stringing not
started. 04 pole erected during last month. Matching materials are available.

4.

New 11 KV line 176.38 CKm - 84 rail poles out of total 2304(3%) & 315 PSC poles
erected out of 1546 (18%). During last month only 20 nos. PSC Poles & zero rail pole
erected. Stringing not started yet. Progress is extremely slow.

5. Key Take Home: Except erection of 05 nos. 33KV VCB & 04 no AB switch under R&M
work and 4 nos. Rail Poles under 33KV line work and 19 Rail Pole & 40 nos. PSC poles
erected under 11KV New line no other progress seen. Despite commitment given by
contractor no initiative in New Line work.

SBPDCL Special Plan (BRGF) Phase - 1 (Achievements)


S. No. NIT

Name of Agency

M/s GKC-APL Joint


Venture,

196

203 M/s Supreme & Co. Pvt.


Ltd,

204

205

206 M/s East India Udyog


Limited,

207

R & M work ( in %)
overall
R&M
Erectio work
Supply
n
(%)

New 33 KV line( in %)

New 11 KV line( in %)

overall
new 33
kv line
Supply Erection work (%) Supply

overall
11 kv
line work Overall
%
Erection
(%)

73.92%

84.24%

69.92%

2.00%

35.96%

57.07%

5.00%

31.04%

50.30%

48.00% 29.00%

38.50%

58.00%

7.00%

32.50%

36.00%

3.00%

19.50%

30.17%

100.00% 87.45%

93.73%

90.46%

10.16%

50.31%

82.99%

41.32%

62.16%

68.73%

97.73% 78.33%

88.03%

92.18%

11.19%

51.69%

100.00%

41.55%

70.78%

70.16%

71.39

88.80%

24.30%

56.55

61.26%

16.59%

38.92

54.923

100.00% 61.62%

80.81%

72.62%

2.00%

37.31%

82.13%

27.78%

54.96%

57.69%

208 M/s Technofab-Gammon 100.00% 49.05%


Joint Venture,

74.53%

100.00%

7.17%

53.59%

100.00%

13.10%

56.55%

61.55%

M/s. Vijai Electricals


Limited

M/s Bajaj Electricals


Limited,

M/s Bajaj Electricals


Limited,

94.55%

78.65%

64.13%

Payment Status of Special Plan(BRGF) Projects Phase-I (Gaya, Nawada & Jehanabad)

Name of
Sl.
Agency
No.
(work
awarded to)

LOA
Agreemen
Date
t Date

Award Cost
(In Cr.)

Mobilization
Advance
Released
(In
Cr.)

Expenditure
(In Cr.)

Suppl Erecti
Suppl Erecti
Suppl Erec Sub
Total
Total
y
on
y
on
y
tion Total

M/s GKC09-12- 07/01/20 67.0 18.1


APL JV,
85.2 6.71 1.81 8.52 27.560.00 36.08
2013
14
2
8
Hyderabad

Summary of Progress of Work of NIT 196


Gaya Jehanabad & Nawada District
Sl NO

Details of Work

Unit

Supply Portion
Mar-15

Frozen.
%
of
work
Quantity Cumulative
Achieved complete
Target
d

Nos
Nos

3
3

Nos

Nos

h
i
j

Construction of Control Rooms


10 MVA Power Transformer
33 KV VCB with Control Panel
11 KV VCB with Control Panel
33 KV & 11 KV Current
Transformer
33 KV & 11 KV Potential
Transformer
33 KV AB switch
11 KV AB switch

R&M of existing Power Sub Stations

Nos

5 MVA to 10 MVA

Nos

33 KV VCB

Nos

11 KV VCB

Nos

33 KV AB switch
11 KV AB switch
Civil Works for Control rooms and
Boundary Walls

New PSS

Soil testing & Contour Survey


Construction of Boundry Walls

b
c
d
e
f
g

a
b
c
d
e
f

Erection Portion
Mar-15
% of work
Cumulativ
Achieved complete
e Target
d

0.00%

3
6
12
24

6
12
24

2
-

0.00%
0.00%
33.33%
0.00%
0.00%

3
3
6
12
24

36+72

36+72

36+72

9+9
30
51
39

9+9
30
51

20

9+9
30
51

85

85

85

Nos
Nos

133
50
146

133
50
146

133
47
115

Nos

29

29

Nos
Nos
Nos
Nos
Nos
Nos
Nos

0.00%
0.00%
66.67%
0.00%

100.00
%
100.00
%
100.00
%
94.00%
78.77%
0.00%

72

131
50
146

29

100%

100%

0
0
0
0

0%
0%
0%
0%

0%

0%

0
0

0%
0%

100%

51

71%

127

97%

28
54

56%
37%

24

83%

Supply Portion
Sl NO

Details of Work

New 33 KV Line

Unit

Frozen.
Quantity

Mar-15

48

13 Meter Rail Pole

Nos

999

999

ACSR Wolf Conductor

Kms

33 KV V Cross arm with matching


materials

Nos

33 KV Pin Insulators

Nos

33 KV Disc/Post Insulators

Nos

Stone Base Plate

Nos

f
4

New 11 KV Line

13 Meter Rail Pole

170.07 170.07

% of work
Cumulativ
Achieved complete
e Target
d

0%

999

47

5%

170.07

0%

846

0%

2859

0%

642

0%

999

47

5%

0%

373

37.34%

114.0

67.03%

846

846

244

2859

2859

1,915

642

642

642

999

807

999
176.3
CKms
8

Mar-15

% of work
Cumulative
Achieved complete
Target
d

CKms

Erection Portion

28.84%
66.98%
100.00
%
80.78%

1480 64.24%
27.94%
432

2304

65

3%

1546

279

18%

621.8

0%

3096

0%

3.61%

2856

0%

9,000

85.08%

10578

0%

1,912

49.66%

3850

344

9%

CKms

2304

2304

400 Kg PSC pole

Nos

1546

1546

ACSR Dog Conductor

Nos

621.8

621.8

415

11 KV V Cross arm with matching


Kms
materials

3096

3096

760

11 KV Disc & Post Insulators

Nos

2856

2856

103

11 KV Pin Insulators

Nos

10578

10578

Stone Base Plate

Nos

3850

3850

66.74%
24.55%

Detailed Work Gaya District


Mar-15
Sl NO

Details of Work

Unit

Frozen.
Supply
Erection
Quantity Cumulative Cumulative Cumulative Cumulative
Target
Achivement
Target
Achivement

R&M of PSS

Nos

16

10

5 MVA to 10 MVA

Nos

3.15MVA to 5MVA

Nos

33 KV VCB

Nos

29

29

29

29

25

11 KV VCB

Nos

65

65

29

65

59

33 KV AB switch

Nos

43

43

37

43

18

11 KV AB switch

Nos

62

62

62

62

13

New Line (11 KV)

CKms

20.3

19.7

13 Meter Rail Pole

Nos

179

179

170

179

400 Kg PSC pole

Nos

161.5

161.5

132

161.5

61

ACSR Dog Conductor

Kms

62.7

62.7

31

62.7

11 KV V Cross arm with


matching materials

Nos

345.0

345.0

253

345.0

11 KV Disc & Post


Insulators

Nos

4140.0

4140.0

4140.0

11 KV Pin Insulators

Nos

1156.0

1156.0

1026

1156.0

Stone Base Plate

Nos

340.0

340.0

340.0

340.0

61

As per Approved Bar Chart/Pert Network

District: Nawada
Mar-15
Sl NO

1
a
b
c
d
e
f
g
h
2
a
b
c
c
d
e
3
a
b
c
d
e
f
4
a
b
c
d
e
f
g

Details of Work

New PSS

Soil testing & Contour Survey


Construction of Boundry Walls
Construction of Control Rooms
10 MVA Power Transformer
33 KV VCB
11 KV VCB
33 KV AB switch
11 KV AB switch
R&M of PSS
5 MVA to 10 MVA
3.15MVA to 5MVA
33 KV VCB
11 KV VCB
33 KV AB switch
11 KV AB switch
New 33 KV Line
13 Meter Rail Pole
ACSR Wolf Conductor
33 KV V Cross arm with matching
materials
33 KV Pin Insulators
33 KV Disc/Post Insulators
Stone Base Plate
New 11 KV Line
13 Meter Rail Pole
400 Kg PSC pole
ACSR Dog Conductor
11 KV V Cross arm with matching
materials
11 KV Disc & Post Insulators
11 KV Pin Insulators
Stone Base Plate

Unit

Supply

Frozen. Quantity

Erection

Cumulative Target

Cumulative Achivement

Cumulative Target

Cumulative Achivement

Nos
Nos

Nos

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
CKms
Nos
Kms

4
8
16
20
34
13
2
18
44
10
35
40.5
770
125.145

4
8
16
20
34
13
2
18
44
10
35

770
125.145

20
17
32
10
34
492
90.0

4
8
16
20
34
13
2
18
44
10
35
47.5
770
125.145

10
31
6
27
-

Nos

729

729

729

Nos
Nos
Nos
CKms
Nos
Nos
Kms

2307
729
770
100.4
966.96
739
254

2307
729
770

1153
805
254

308
150
233

2307
729
770
82.3
1153
805
254

6
196
-

Nos

1706

1958

1958

Nos

602
5118
1706

494
5874
1958

494
5874
1958

202

Nos
Nos

District: Jehanabad
Mar-15
Sl NO

Details of Work

Unit

Supply

Frozen. Quantity
Cumulative Target

Erection

Cumulative Achivement

Cumulative Target

Cumulative Achivement

1
a

Soil testing & Contour Survey

Nos
Nos

1
1

1
1

Construction of Boundry Walls

Nos

Construction of Control Rooms

Nos

10 MVA Power Transformer

Nos

e
f
g
h
2
a
b
c
c
d
e
3
a
b

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
CKms
Nos
Kms

2
4
8
10
17
10
3
3
25
58
3
49

143
23

2
3
0
25
36
0
49
0
143
23

1
2
4
8
10
17
10
3
3
25
58
3
49

143
23

3
2
16
37
7

51
-

Nos

135

135

135

135

33 KV VCB
11 KV VCB
33 KV AB switch
11 KV AB switch
R&M of PSS
5 MVA to 10 MVA
3.15MVA to 5MVA
33 KV VCB
11 KV VCB
33 KV AB switch
11 KV AB switch
New 33 KV Line
13 Meter Rail Pole
ACSR Wolf Conductor
33 KV V Cross arm with matching
materials
33 KV Pin Insulators

1
2
4
8
10
17
10
3
3
25
58
3
49
7.5
143
23

Nos

33 KV Disc/Post Insulators

f
4
a
b
c

Stone Base Plate


New Line (11 KV)
13 Meter Rail Pole
400 Kg PSC pole
ACSR Dog Conductor
11 KV V Cross arm with matching
materials

Nos
CKms
Nos
Nos
Kms

427
135
143
56.0
469
486
173

427
135
143

469
486
173

427
135
143
0
469
486
120

427
135
143
74
469
486
173

51
78
96
-

Nos

952

952

253

952

672
3024
955

672
3024
955

100
3024
637

672
3024
955

174

New PSS

Nos

11 KV Disc & Post Insulators

Nos

11 KV Pin Insulators

Stone Base Plate

Nos
Nos

10

RENOVATION & MODERNIZATION OF


33/11 KV PSS
- Gaya
Augmentation
VCB
CR Panel
Lightning Isolator/AB
of Power
Installatio Installatio
Arresters
switch
Transformer
n
n

S. No

Name Of
PSS

3.15 To 5 To 10 33
5 MVA MVA
KV

11
KV

33
KV

11
KV

33
KV

11
KV

33
KV

Patch Work
Painting
Layin
Grave Struc
PSS g Of
Yard
l
ture
Earthin Cantr
Lighti
Fillin Painti
Bound Cantro
g
ol
ng Boundr Cantrol Cable
g
ng
11 KV
ry
l
Cable
y Wall Room Trench
Wall Room

GAYA
1

Belaganj

Tekari

Sherghati

Guraru

Gurua

No scope

Chakand

Konch

Cherki

WIP

10

Imamaga
nj

11

Paibigha

12

Dhobi

13

Dumaria

14

Amas

15

Baltarwa
Cherkiriy
a
complete
d

26

59

17

43

13

38

18

24

16
.

Sobh

No scope

compl compl compl complet complet not CompleComple


ete
ete
ete
e
e
started
te
te
compl

WIP

ete
compl compl compl complet complet Comple CompleComple
ete
ete
ete
e
e
te
te
te
compl compl compl complet complet Comple CompleComple
ete
ete
ete
e
e
te
te
te
compl compl compl complet complet Comple CompleComple
ete
ete
ete
e
e
te
te
te
compl compl compl complet complet Comple CompleComple
ete
ete
ete
e
e
te
te
te
compl complet complet Comple CompleComple
WIP
WIP
ete
e
e
te
te
te
compl
compl complet complet Comple CompleComple
WIP
ete
ete
e
e
te
te
te
compl compl compl complet complet Comple CompleComple
ete
ete
ete
e
e
te
te
te
compl compl compl complet complet Comple CompleComple
ete
ete
ete
e
e
te
te
te
compl compl

ete
ete
compl compl
complet complet Comple CompleComple

ete
ete
e
e
te
te
te
compl compl
complet complet Comple CompleComple

ete
ete
e
e
te
te
te
compl compl
complet complet Comple CompleComple

ete
ete
e
e
te
te
te

complet complet Comple CompleComple

e
e
te
te
te

11

RENOVATION & MODERNIZATION OF


33/11 KV PSS
- Nawada
S. No

Name Of
PSS

Augmentation
VCB
CR Panel
Lightning
of Power
Installatio Installatio
Arresters
Transformer
n
n

Isolator/AB
switch

3.15 To 5 To 10 33
5 MVA
MVA
KV

33
KV

11
KV

33
KV

11
KV

33
KV

11
KV

Patch Work
Painting
Layin
Grave Struct
PSS
g Of
Yard
l
ure
Earthin Cantr
Lighti
Fillin Painti
g
ol
ng Boundr Cantrol Cable Bound Cantro
g
ng
11 KV
Cable
y Wall Room Trench ry Walll Room

NAWADA

HISSUA

PAKRIBARA
WA

SIRDALLA

BADUKRA

AKBARPUR

ROHA

WARISALIG
ANJ

KAWAKOL

RAJAULI

10
11
12
13

No scope

No scope

Cherkiyar
Nardiganj
Orhanpur
Govindpu
r
Complete
d
Total
Complete
d

10

31

11

28

27

52

127

30

71

30

72

24

58

complet
e
complet
e
complet
e
complet
e
complet
e
complet
e
complet
e

complet
e
complet
e
complet
e
complet
e

compl
ete
compl
ete
compl
ete
compl
ete

WIP

WIP

compl
ete
compl
ete
compl
ete
compl
ete
compl
ete
compl
ete
compl
ete
compl
ete

compl
ete
compl
ete
compl
ete

WIP
WIP
compl
ete
compl
ete
compl
ete
WIP
compl
ete
WIP
WIP

complet
e
complet
e
complet
e
complet
e
complet
e
complet
e

complet complet comple comple


e
e
te
te
complet complet comple comple
e
e
te
te
complet complet comple comple
e
e
te
te
complet complet comple comple
e
e
te
te
complet complet comple comple
e
e
te
te
complet complet comple comple
e
e
te
te

complet complet complet comple comple


e
e
e
te
te

complet
e
complet
e
complet
e
complet
e

complet complet comple comple


e
e
te
te
complet complet comple comple
e
e
te
te
complet complet comple comple
e
e
te
te
complet complet comple comple
e
e
te
te

12

RENOVATION & MODERNIZATION OF


33/11 KV PSS
- JEHANABAD
Augmentation
VCB
CR Panel
Lightning Isolator/AB
of Power
Installati Installati
Arresters
Transformer
on
on

S. No

Name Of
PSS

3.15 To
5 MVA

5 To
10
MVA

33
KV

11
KV

33
KV

11
KV

33
KV

11
KV

Patch Work
Painting
Layi
ng
Grav Struc
PSS
Of
Yard
el ture
Earthi Cant
Light
Fillin Paint
Bound Cantr Cable Boun Cantr
ng
rol
ing
33
g
ing
11 KV
ry
ol
Trenc dry
ol
Cabl
KV
Wall Room
h
Wall Room
e
switch

JEHANABAD

1
2
3

Erki
Makada
mpur
Sakurab
ad

Tehta

Kako

Ghosi

Hulasga
nj

Chauri

Jehanab
ad

10

MaKpa
Comple
ted

WIP

16

37

13

28

No
scope

No scope

1
No
scope
2

Comp Comp Comp comple comple comple compl compl


lete lete lete
te
te
te
ete
ete
Comp Comp Comp Comple Compl comple Compl Compl
lete lete lete
te
ete
te
ete
ete
Comp Comp Comp comple comple comple Compl Compl
lete lete lete
te
te
te
ete
ete
not
Comp Comple Compl comple Compl Compl
starte lete
te
ete
te
ete
ete
d
Comp Comp comple Compl comple Compl Compl
WIP
lete lete
te
ete
te
ete
ete
Comp
WIP
WIP

lete
not
Comp Comp comple Compl comple Compl Compl
starte
lete lete
te
ete
te
ete
ete
d
Comp
comple Compl comple Compl Compl
WIP
WIP
lete
te
ete
te
ete
ete
Comp
WIP

lete
Comp Comp Comp Comple Compl comple Compl Compl
lete lete lete
te
ete
te
ete
ete

13

New & R&M Works of PSS Jehanabad


District

Total No. of New PSS in scope:- 1

Sl. No.

Name of new PSS

Dakshini
Jehanabad

Capacity
(in MVA)

2x10 MVA

Availability
of land

Current work status

Land Made
available by
11.09.2014

Boundary wall of PSS


Completed & Structure
foundation, Equipment
Foundation of 33 KV upto
transformer foundation
completed 11 KV side
equipment foundation
completed except BPI
foundation .Control room
brick work with roof
casting completed .
Remaining works like
Plaster, Fixing of door &
window, electrification etc.
to be done

Total No. of Augmentation PSS in scope:- 5


Sl. No.
1
2

Name of PSS
Jehanabad PSS-01
Nos.
Erki PSS- 01 Nos.

Present Capacity
(in MVA)

Proposed
Capacity
(in MVA)

Current work status

3X 5 MVA

1X10+2X5=25

Installed (1 No.)

2 X 5 MVA

1X10+1X5=15

Installed (1 No.)

14

New & R&M Works of PSS Gaya District


Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- Nil
Sl. No.

Name of new PSS

Capacity
(in MVA)

Availability
of land

NIL

Current work status

Total No. of Augmentation PSS in scope:- 2 nos.


Sl. No.

Name of PSS

Present
Capacity
(in MVA)

Proposed
Capacity
(in MVA)

Current work status

Tekari PSS

2 X 5 MVA

1X10+1X5=15

Installed (1 No.)

Belaganj PSS

2 X 5 MVA

1X10+1X5=15

Installed (1 No.)
15

New & R&M Works of PSS Nawada


District
Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 2 nos.


Sl. No.

Name of new PSS

Majhwe

Mayabigha

Capacity
(in MVA)

Availability
Current work status
of land

2x10

Land Made
Available by
17.12.2014.

2x10

Land Made
Available by
17.12.2014.

Boundary Wall
Completed, Ms Angles
Fixing Wip, Plastering
wip, Control Room
Foundations RCC Wip,
Equipment Foundations
Pit Excavations Wp
Boundary Wall Pillers
Completed & Plinth
Beam Completed, Brick
Work wip,Control Room
Foundations RCC Wip

16

11 KV Line Progress of Gaya District

Name of Feeder

Sl.No.

Length
Length
of Line
PSC
of Line
Rail
on PSC
Pole(LO
On rail
Pole(LOA
Pole(LO
A
Pole(LOA
Quantity)
A
Quantit
Quantity)
CKm
Quantit
y)CKm
CKm
y)CKm

Particular

From

To

Rail Pole PSC PoleRail Pole

paibigha Kathar

ImamgunjImamgunj
PSS
Town

New 11 Imamgunj
Ranigunj
KV Line PSS
Belaganj

30.9

30.9

170

170

Kabirpur

Paibigha Men

Length of Line (In Proposed Qty


CKm.)
(In Nos)

Sub-Total 30.9

30.9

170

170

Pole
Pole dumped
Erection(In
at site
Nos.)

Stringing(In
Ckm)

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

68

70

3.15

54

60

3.38

57

60

WIP

4.5

77

88

27

85

112

34

10.53

9.5

200

61

179.01 161.5 190

17

33 KV Line Progress Of Nawada District

Pole
Pole
Length of Line (In Proposed
Stringing(
dumped at Erection(I
Km.)
Qty (In Nos)
In Ckm)
site
n Nos.)

Name of Feeder
Sl.No.

Length of Line On
rail Pole(LOA
Quantity)CKM

Particular

From

Nawada

New 33 Nawada
KV Line Grid

Rail Pole(LOA
Quantity)CKM

To

Orhanpur
New PSS

Mayabigha
New PSS

60

1140

Wagirganj
Majhwe
Grid

Sub-Total

60

1140

Rail Pole

Rail Pole

Rail Pole

Rail Pole

Rail Pole

12.5

238

240

15

285

17

13

247

235

40.5

770

492

18

11 KV Line Progress Of Nawada


districts
Name of Feeder
Sl.No.

Particular
From

From

To

To

1)Majhwe to Chetriya
2)Majhwe
Baidnathpur
New PSS to
3)Majhwe
Latawan
New PSS to
4)Majhwe
Gaundane
New PSS to Bigha
5)Majhwe
Nagma
New PSS to
6)Majhwe
Tungi
New PSS to
New 11 7) Govindpur Lakhpath
bigha
KV Line PSS to
9) Mayabigha Kadirganj
New PSS to Town
10)
Mayabigha
Pachiya
New PSS to
11)Mayabigh
Thika
a New PSS to
12)
Mayabigha
Hemja
New PSS to
13)
Daulatia
Mayabigha
Village
New PSS to
14)
Mayabigha
Aathi
New PSS to

Sub-Total

Length of Line On
rail Pole(LOA
Quantity)CKM

Rail Pole(LOA
Quantity)CKM

Rail Pole

Length of
Length of
Line on
Rail
PSC
Line On rail
PSC
Pole(LOA Pole(LOA
Pole(LOA
Pole(LOA Quantity)C Quantity)C
Quantity)CK
Quantity)C
KM
KM
M
KM

64

64

64

64

Pole
Pole
Length of Line (In Proposed
Stringing(
dumped at Erection(I
Km.)
Qty (In Nos)
In Ckm)
site
n Nos.)

1088

1088

1088

1088

Rail Pole

Rail Pole

Rail Pole

Rail Pole

Rail Pole

PSC Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

12.68

216

6.17

105

150

15

119

80

16.3

277

100

11

16.41

279

113

2.47

42

50

8.88

151

150

136

1.2

20

20

5.47

93

120

45

6.7

114

125

102

110

7.78

132

140

3.29

56

56

56.88

43.47

369

845

966.
739
96

11 196

19

33 KV & 11 KV Line Progress Of


Jehanabad districts
Name of Feeder
Sl.No.

Particular
From

33KV Line

To

Rail Pole(LOA
Quantity)CKM

15

15

1) Erki Grid Dakshin


Jahanabad
to

Sub-Total

From

Length of Line On rail


Pole(LOA
Quantity)CKM

Dakshin
Jehanabad
New PSS
Dakshin
Jehanabad
New PSS
Dakshin
Jehanabad
New PSS
Dakshin
Jehanabad
New PSS
Dakshin
11 kV Line Jehanabad
New PSS
Dakshin
Jehanabad
New PSS
Ghosi PSS
Hulasganj
PSS
Jehnabad old
PSS
Kako Pss
Makhdampur
PSS
Sakurabad
Pss

To

Length of
Line (In
Km.)

Pole
Proposed Pole dumped
Stringing(In
Erection(In
Qty (In Nos)
at site
Ckm)
Remar
Nos.)
ks

Rail Pole

Rail Pole

Rail Pole

Rail Pole

Rail Pole

285

7.5

143

200

51

285

7.5

143

200

51

Length of
Length of
PSC
Rail Pole(LOA
Line On rail Line on PSC
Pole(LOA
Rail
Quantity)CK
Pole(LOA
Pole(LOA
Quantity)C Pole
M
Quantity)CKM Quantity)CKM
KM

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Rail
Pole

PSC
Pole

Bharthua

1.50

26

35

Hajipur

4.19

71

80

Narayanpur

2.00

34

30

Nonhi

8.51

145

175

11.10

189

200

71

0.20

4.50

77

90

73

4.50

77

97

23

5.00

85

3.50

60

50

5.00

85

50

6.00

102

100

0.00

0.00

Pijora

50

50

850

850

Ranipur
Ghosi Town
Hulasganj
town
Jehanabad
Town FS
Kako town
Makhdampur
town
Sakurbad
Town
Sub- Total

50

50

850

850

27.50 28.50 469.0 486.0 525.0 387.0 78.00 96.00 0.00


0
0
0
0

20

Você também pode gostar