AND RESPONSE
Learning Objectives
Scope
Recognising an emergency
Emergency management
Emergency planning
Emergency planning
Emergency mitigation and resources
Procedures
Incident control and facilities
Training & exercises
What Is An Emergency
Accident unexpected event which cause
damage @ harm. Happens by chance
Emergencyan unforeseen combination
of circumstances @ the resulting state
that calls for immediate action
Disastera sudden calamitous event
bringing great damage, loss @
destruction
Levels Of Emergencies
Depends on severity of the incident and capability of
the organisation
Level 1
If within the capabilities of the organisation
Level 2
If external assistance is required: mutual aid,
district or other agencies. MKN Arahan 20 may
apply.
Level 3
State or National Disaster. MKN Arahan 20 takes
over.
1.Starvation methods
1. Separating
fuel
2. Closing
the supply
valve
3.Stopping
fuel supply
2.Smothering methods
1. Blocking
oxygen
2.Use foam
/CO2
3.CO2
replace
oxygen
3.Cooling methods
1.Lowering
the heat
2.Water
absorbs heat
3.Cools the
fuel
Fire protection
method
General requirements
The employer shall be responsible for
development of a fire protection program to be
followed throughout all phases of the construction
and demolition work, and shall provide for the fire
fighting equipment as specified in this subpart.
As fire hazards occur , there shall be no delay in
providing the necessary equipment.
Water supply
A temporary or permanent water supply,
of sufficient volume , duration ,and
pressure , required to properly operate the
fire fighting equipment shall be made
available as soon as combustible
materials.
3. Standpipes
In all structures in which standpipes are
required , or where standpipes exist in structure
being altered , they shall be brought up as soon
as applicable laws permit, and shall be
maintained as construction progresses in such a
manner that they are always ready for fire
protection use
Fire cut-off
4. Fire walls and exit stairways , required
for the completed buildings, shall be
given construction priority. Fire doors ,
with automatic closing devices ,shall be
hung on openings as soon as
practicable.
summary