CE-407 Project Planning,

Management & Engg. Economics,


02 Credit Hours
Spring 2015
Lecture 01
Introduction and Definitions
by Faisal Rehman
Department of Civil Engineering, UETP
1

Summary

Construction Project

Project Cycle and Project Life Cycle

Project vs Operational Work vs Stretegic Planning vs Program vs


Portfolio vs Sub Project

Interpersonal Skills

Project Environment

Project Stake Holder

Project Constraints

Project Management

Project Management Office (PMO)

Role of Project Manager and Engineer

What is Construction Project

Construction Project is a job of creating services


or building infrastructure that has a beginning
and an end (time), specified outcome ( scope) at
stated level of quality (performance), and a
budget (cost).
A project is temporary.

A project is unique.

A project is the result of a multi-task job that performs


something specific (i.e. a goal). It is thus progressively
elaborated.

Project Cycle

Problem Identification

Also refered to as the concept stage or need


stage where the project is just a thought
Someone realizes that there is a problem in
search of a solution
or
An opportunity that the organization can take
advantage of.
5

Definition

In this stage, a person or group of people accurately describes


the problem (or, more positively, the challenge or opportunity)
that the project is attempting to solve.
The definition stage is more often neglected, which helps explain
why some projects fail.
The challenge of definition stage is to take the time to thoroughly
describe the problem, beginning with nave question: What is the
problem were trying to solve?
Define the problem and its solution from the customers point of
view.
6

Project Design

Define the project objectives

Finalize the project scope

Identify project activities

Break each activity into logical components

Assign resources and

Create estimates for time and costs

Go/no go stage

Outcome is project budget and timeline

Decides the success of the project

Development

You expand the resources according to the


project plan to complete the activities specified in
the project design.
Quality assurance and communication skills are
vital.

Implementation

Field testing and measurement.

Product is modified or re-engineered.

Evaluation

Review of a project.
Reports and personal experience with the
project.
Indentify areas to improve.

10

Project Life Cycle


Project life cycles generally define:

What technical work to do in each phase (for example, in which


phase should the architects work be performed?)
When the deliverables are to be generated in each phase and
how each deliverable is reviewed, verified, and validated.
Who is involved in each phase (for example, concurrent
engineering requires that the implementers be involved with
requirements and design)
How to control and approve each phase.
11

Project Life Cycle

Project life cycle descriptions can be very general or very


detailed. Highly detailed descriptions of life cycles can include
forms, charts, and checklists to provide structure and control.
Most project life cycles share a number of common
characteristics:
Phases are generally sequential and are usually defined by some
form of technical information transfer or technical component
handoff.
Cost and staffing levels are low at the start, peak during the
intermediate phases, and drop rapidly as the project draws to a
conclusion.
12

Project Life Cycle

13

Project Life Cycle

14

Project Life Cycle

15

Project, Project Life Cycle and Product

16

Project Stake Holders

17

Project vs Operational Work

They share many of the following characteristics:

Performed by people
Constrained by limited resources
Planned, executed, and controlled.

Projects and operations differ primarily in that


operations are ongoing and repetitive, while
projects are temporary and unique.

18

Project vs Operational Work

The objectives of projects and operations are fundamentally


different. The purpose of a project is to attain its objective and
then terminate.
Conversely, the objective of an ongoing operation is to sustain
the business. Projects are different because the project
concludes when its specific objectives have been attained, while
operations adopt a new set of objectives and the work continues.
Projects are undertaken at all levels of the organization and they
can involve a single person or many thousands. Their duration
ranges from a few weeks to several years.
Projects can involve one or many organizational units, such as
joint ventures and partnerships.

19

Project vs Operational Work


Examples of projects include, but are not limited
to:

Developing a new product or service

Effecting a change in structure, staffing, or style of an organization

Designing a new transportation vehicle

Developing or acquiring a new or modified information system

Constructing a building or facility

Building a water system for a community

Running a campaign for political office

Implementing a new business procedure or process

Responding to a contract solicitation.

20

Strategic Planning

Strategic planning is an organization's process of defining its


strategy, or direction, and making decisions on allocating its
resources to pursue this strategy.
It may also extend to control mechanisms for guiding the
implementation of the strategy.
Strategic planning became prominent in corporations during the
1960s and remains an important aspect of strategic
management.
It is executed by strategic planners or strategists, who involve
many parties and research sources in their analysis of the
organization and its relationship to the environment in which it
competes

21

Strategic Planning

Strategy has many definitions, but generally involves setting


goals, determining actions to achieve the goals, and mobilizing
resources to execute the actions.
A strategy describes how the ends (goals) will be achieved by the
means (resources).
The senior leadership of an organization is generally tasked with
determining strategy. Strategy can be planned (intended) or can
be observed as a pattern of activity (emergent) as the
organization adapts to its environment or competes.

22

Strategic Planning

Strategy includes processes of formulation and


implementation; strategic planning helps
coordinate both.
However, strategic planning is analytical in
nature (i.e., it involves "finding the dots");
strategy formation itself involves synthesis (i.e.,
"connecting the dots") via strategic thinking.
As such, strategic planning occurs around the
strategy formation activity.

23

Projects vs Strategic Planning

Projects are a means of organizing activities that


cannot be addressed within the organizations
normal operational limits.
Projects are, therefore, often utilized as a
means of achieving an organizations
strategic plan, whether the project team is
employed by the organization or is a contracted
service provider.
24

Project vs Program

A program is a group of related projects


managed in a coordinated way to obtain benefits
and control not available from managing them
individually .
Programs may include elements of related work
outside of the scope of the discrete projects in
the program. For example: ????

25

Project vs Portfolio

A portfolio is a collection of projects or programs and other work


that are grouped together to facilitate effective management of
that work to meet strategic business objectives.
The projects or programs in the portfolio may not necessarily be
interdependent or directly related.
Funding and support can be assigned on the basis of risk/reward
categories, specific lines of business, or general types of
projects, such as infrastructure and internal process
improvement.

26

Project vs Sub Projects

Projects are frequently divided into more


manageable components or subprojects,
although the individual subprojects can be
referred to as projects and managed as such.
Subprojects are often contracted to an external
enterprise or to another functional unit in the
performing organization.

27

Interpersonal Skills
The management of interpersonal relationships includes:

Effective communication: The exchange of information

Influencing the organization: The ability to get things done

Leadership: Developing a vision and strategy, and motivating people


to achieve that vision and strategy
Motivation: Energizing people to achieve high levels of performance
and to overcome barriers to change
Negotiation and conflict management: Conferring with others to
come to terms with them or to reach an agreement
Problem solving: The combination of problem definition, alternatives
28
identification and analysis, and decision-making.

Project Environment

There are social, economic, and environmental


context for a Project.
They have intended and unintended positive
and/or negative impacts.
The project team should consider the project in
its cultural, social, international, political, and
physical environmental contexts.
29

Project Environment

Cultural and social environment: The team needs to understand how the project
affects people and how people affect the project.

International and political environment: Some team members may need to be


familiar with applicable international, national, regional, and local laws and customs, as
well as the political climate that could affect the project.

This may require an understanding of aspects of the economic, demographic,


educational, ethical, ethnic, religious, and other characteristics of the people whom
the project affects or who may have an interest in the project.

Other international factors to consider are time-zone differences, national and


regional holidays, travel requirements for face-to-face meetings, and the logistics of
teleconferencing.

Physical environment: If the project will affect its physical surroundings, some team
members should be knowledgeable about the local ecology and physical geography
that could affect the project or be affected by the project.
30

Project Stake Holders

Project manager. The person responsible for managing the project.

Customer/user.

The person or organization that will use the projects product.

There may be multiple layers of customers.

For example, the customers for a new pharmaceutical product can include the
doctors who prescribe it, the patients who take it and the insurers who pay for it.

In some application areas, customer and user are synonymous,

while in others, customer refers to the entity acquiring the projects product

and users are those who will directly utilize the projects product.

Performing organization. The enterprise whose employees are most directly nvolved
in doing the work of the project.
Project team members. The group that is performing the work of the project.

31

Project Stake Holders

Project management team: The members of the project team


who are directly involved in project management activities.
Sponsor: The person or group that provides the financial
resources, in cash or in kind, for the project.
Influencers: People or groups that are not directly related to the
acquisition or use of the projects product, but due to an
individuals position in the customer organization or performing
organization, can influence, positively or negatively, the course of
the project.
PMO: If it exists in the performing organization, the PMO can be
a stakeholder if it has direct or indirect responsibility for the
32
outcome of theproject.

Project Stake Holders

In addition to these key stakeholders, there are many different names


and categories of project stakeholders, including internal and external,
owners and investors, sellers and contractors, team members and their
families, government agencies and media outlets, individual citizens,
temporary or permanent lobbying organizations, and society-at-large.
The naming or grouping of stakeholders is primarily an aid to identifying
which individuals and organizations view themselves as stakeholders.
Stakeholder roles and responsibilities can overlap, such as when an
engineering firm provides financing for a plant that it is designing.
Project managers must manage stakeholder expectations, which can
be difficult because stakeholders often have very different or conflicting
objectives.
33

Project Parameters/Constraints
Time

Scope

Performance

and cost..

these are related to each other

So C = f(P,T,S)

At any point, you can control only three of the four parameters
because when one of the project parameters changes, at least
one of the other parameter must change in response.
Controling these constraints is called project management.
Efficient use of resources to complete a project as designed, on
time, at the desired level of performance, and within budget.

34

Project Management

Project management is a set of principles, practices, and


techniques applied to lead project teams and control project
schedule, cost, and performance risks to result in delighted
customers.
The Project Management Institute has identified nine topic areas
to define the scope of project management knowledge as follows:
integration, scope, time, cost, quality, human resources,
communications, risk, and procurement.
Within each of these topic areas, there is a set of principles,
practices, and techniques to help you manage project risks and
capture opportunities for success.
35

Project Management

Efficient use of resources to complete a project as


designed, on time, at the desired level of performance,
and within budget.
Scope creep: Unplanned changes in project scope
Experienced project managers have a formal process of
reviewing and approving changes to the project.
The process is communicated to everyone involved with
the project to stave off creep.
36

Project Management Office

A project management office (PMO) is an


organizational unit to centralize and coordinate
the management of projects under its domain.
Features???

37

Role of Project Manager


Networking.

Strong Communication and Interpersonal Skills.

Reading Shop Drawing.

Monitoring and Implementing Project Plan

Identifying problems and risks by reading key


indicators that delay the project and solving it.

Avoiding Scope Creep.

38

Role of Engineer Regarding Project Management


Reading Project Plan and Shop Drawing.

Implementing it.

Reporting Problems.

39

Scope of Construction Project Planning


in Pakistan

The main advantage of construction project


planning is that it is job of leadership in
construction industry. One develops a good link
with experts of his field.
Followings are the area of research in
Construction Project management in Pakistan:
Research on Delay and Cost increase of
Project.
Labour Safety and it's laws on Construction
Site.
40

Assignments

Create BOQ with cost estimation and detailed items


including detailed electric work for final finished and
furnished single classroom of a school building.

What is Kaizen Rule and what are methods in it.

Explain 5 Whys with examples.

Describe BIM.

Describe FIDIC

Describe B/C ratio and IRR

41

Reference
Project Management Book of Knowledge - PMBOK

Mastering Project 2000, Gini Courter and Annette


Marquis-ISBN 81-7656-244-0 (First Chapter)

https://en.wikipedia.org/wiki/Strategic_planning

http://www.hyperthot.com/project.htm

http://en.wikipedia.org/wiki/Project_management

http://www.suite101.com/course.cfm/17517/seminar

http://www.netmba.com/

http://www.gezabottlik.com/usc_courses.html

42