Internal Use (Only)

Dec. 31 2006

CNE040613040006 HUAWEI BSC6000

Software
Commissioning
www.huawei.com

ISSUE 1.0
GSM BSS Training Team

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

This presentation describes the preparations


and process for commissioning of the
HUAWEI BSC6000. It also describes the
verification of data services for the Abis
interface, Ater interface, A interface, and Pb
interface.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Reference

HUAWEI BSC6000 Base Station


Controller Software Installation Guide
HUAWEI BSC6000 Base Station
Controller Commissioning Guide

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

After learning the course, you can familiarize


yourself with
BSC6000 commissioning preparations
BSC6000 commissioning process
Data verification methods for BSC interfaces
BSC6000 service verification

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Chapter 1 Overview of Commissioning


Chapter 2 Commissioning of Interface
Chapter 3 Service Verification

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Typical Networking
The following figure shows a typical networking structure for the BSC6000:

LMT

Alarm box

LAN Switch

M2000

LMT
GBAM
BSC6000

MS

Abis

Um
BTS

MSC

PCU

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Overview of Commissioning for BSC6000


Keep the following installation disks ready before the commissioning
OMU software installation disk of the correct version
LMT software installation disk of the correct version
Keep the following License file ready
The License file that matches the office configuration has been requested
by Huawei technical support engineers
Keep configuration data ready
According to the HUAWEI BSC6000 Base Station Controller Data
Configuration Guide, keep the following data ready and correct:
Board data
Abis/Ater/A/Pb interface data
Other related commissioning data

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Overview of Commissioning for BSC6000


Preparations for equipment
A minimum of one BTS is connected to the BSC6000. The
commissioning of the BTS is completed and the BTS can provide the
basic functions.
A minimum of one MSC is connected to the BSC6000. The
commissioning of the MSC is completed and the MSC can provide the
basic functions.
A minimum of one PCU is connected to the BSC6000. The
commissioning of the PCU is completed and the PCU can provide basic
PS functions.
Three single-mode MSs and one dual-mode MS used for testing are
ready and subscribed in the HLR.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Chapter 1 Overview of Commissioning


Chapter 2 Commissioning of Interface
Chapter 3 Service Verification

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Process of System Commissioning


The commissioning process for the BSC6000 is as follows according
to priority:
Load the BSC host software
Load the BTS software
Verify the Abis interface
Verify the Ater interface
Verify the A interface
Verify the Pb interface
Connect the BSC6000 to the M2000
Refer to the presentation HUAWEI BSC6000 Software Management
for steps of loading BSC host software and BTS software.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Loading BSC Host Software


Ensure the following condition before
loading the BSC host software:

Download software

The BSC host software (all files in


\BSC6000\bscswm\area1\software)

Check GBAM version area

exists under the directory of LMT


Load software

Installation
Directory\Common\SWM\Software.
The process of loading the BSC host
software is shown on the right.

Activate software

Query board software

Query board information

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Loading BTS Software


Ensure the following conditions before
Download BTS software

loading the BTS software:


The BTS software exists in the related

Configure BTS software

directory of the LMT.


The BSC and the BTS are correctly
connected and the operation and

Load BTS software

maintenance unit (OMU) of the BTS is


Query BTS properties

operational.
The process of loading the BTS software
is shown on the right.

Activate BTS software

Query board information

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Commissioning for BSC


The commissioning for the BSC comprises the following operations
without precedence:
Perform active/standby switchover
Query the License
Process alarms

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Performing Active/Standby Switchover


Purpose
To check whether the switchover function of active and standby boards is operational.
Procedure
Choose the menu BSC Maintenance > Maintain Device > Switch Over BSC Board .
Perform active/standby switchover tests for all boards that work in active/standby mode.
Perform active/standby switchover once again to restore the status of the active and
standby boards.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Querying License
Purpose
To check whether the feature services based on the License file are valid.
Procedure
Choose the menu BSC Maintenance > Maintain License > Query License and
click Query in the Query License window.
The query results are displayed in the list.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Processing Alarms
Purpose
To complete the processing of real-time alarms before the interface commissioning.
Procedure
Choose Alarm Maintenance> Browse Alarm to query real-time alarms.
Process each alarm according to the alarm processing steps in Online Help.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Abis Interface


Ensure the following conditions before
verifying the Abis interface:

Verify physical link

The BSC commissioning is passed.


The physical transmission between the

Verify management plane link

BSC and the BTS is connected.


The commissioning for the BTS used for

Verify user plane channel

testing the Abis interface is completed


and the BTS is in cell to be set up
state.
The process of verifying the Abis
interface is shown on the right.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Process alarms

Verifying Physical Link


Purpose
To check whether the physical link of the Abis interface is operational when E1/T1
bears the Abis interface.
Procedure
Choose the menu BSC Maintenance > Maintain Transmission and Signaling >
Query Interface Board Port State .
The link information is displayed in the following figure:

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Management Plane Link


Purpose
To check whether the management plane link (OML) between the BSC and the BTS
is operational.
Procedure

Choose the menu BSC Maintenance > Maintain Transmission and Signaling
> Maintain LAPD Link.

Query the OML of the related BTS.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Purpose
To check whether the control plane link (RSL) between the BSC and the BTS is
operational.
Procedure

Choose the menu BSC Maintenance > Maintain Transmission and Signaling
> Maintain LAPD Link..

Query the RSL of the related BTS.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying User Plane Channel


Purpose
To check whether the user plane
channel between the BSC and the BTS
is operational.
Procedure
Choose the menu BSC Maintenance
> Maintain User Resource > Query
Abis Interface Timeslot State. to view
the following information.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Ater Interface


Ensure the following conditions
before verifying the Ater interface for

Verify physical link

the remote GTCS:

GTCS remote configuration

The BSC commissioning is passed.


The physical transmission between

GTCS local
configuration

the GMPS/GEPS and the GTCS is


connected.

Verify control
plane link

The process of verifying the Ater


interface is shown on the right.

HUAWEI TECHNOLOGIES Co., Ltd.

Verify management
plane link

Verify user plane


channel

Verify user
plane channel

Process alarms

Process alarms

HUAWEI Confidential

Verifying Physical Link


Purpose
To check whether the physical link of the Ater interface is operational when E1/T1
bears the Ater interface (GTCS is locally configured).
Procedure
Search the subrack, slot, and port information for the Ater link to be verified.
For example, Ater connection channel 0 corresponds to BM subrack 0, BM slot
16, BM port 0, TC subrack 3, TC slot 16, and TC port 0.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Physical Link


Procedure
Choose the menu BSC
Maintenance > Maintain
Transmission and Signaling
> Query Interface Board
Port State .
If the status of port 1 in slot
14 of subrack 0 and the
status of port 1 in slot 14 of
subrack 5 are normal, the
Ater connection channel 0 is
operational.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying User Plane Channel


Purpose
To check whether the user plane channel of the Ater interface is operational when
E1/T1 bears the Ater interface (GTCS is locally configured).
Procedure
Choose the menu BSC Maintenance > Maintain User Resource > Query Ater
Interface Timeslot State .
Type parameters in the query interface to query the timeslot status.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Management Plane Link


Purpose
To check whether the
management plane link of the Ater
interface is operational when the
GTCS is locally configured.
Procedure
Choose the menu BSC
Maintenance > Maintain
Transmission and Signaling >
Query Ater OML State .

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying A Interface
Ensure the following conditions before verifying
the A interface:
The BSC commissioning is passed.

Verify physical link

The physical transmission between the BSC and


the MSC is connected.

Verify control plane link

The MSC is operational.


The process of verifying the A interface is shown

Verify user plane channel

on the right.
Process alarms

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Physical Link


Purpose
To check whether the physical
link of the A interface is
operational when E1/T1 bears
the A interface.
Procedure
Step 1: In the main
interface, select the tab
BSC Information.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Physical Link


Procedure
Step 2: Click the button E1 Interface in the previous window.
The subrack NO., slot NO., and port NO. of the A interface E1 are displayed in the
following interface.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Physical Link


Procedure
Step 3: Choose the menu BSC Maintenance > Maintain Transmission and
Signaling > Query Interface Board Port State .
In the displayed interface, type the obtained subrack NO., slot NO., and port NO.
of the A interface E1.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Purpose
To check whether the control plane link of the A interface is operational.
The control plane link indicates NO.7 transmission link. It can be categorized into
MTP2 link, MTP3 link, and SCCP link.
The MTP2 is processed by the GEIUT board in the GEPS subrack. The MTP3
and SCCP are processed by the GXPUM board in the GEPS subrack.
The link status is queried in the sequence of MTP2 link, MTP3 link, and SCCP
link.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Procedure
Step 1: In the main interface, select the tab BSC information.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Procedure
Step 2: Click the button SS7 Signaling Link in the previous window.
The obtained Ater Connection Channel Index NO. is 0. The related
MTP2 is processed by CPU 0 of the GXPUM in slot 0.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Procedure
Step 3: In the main interface, select the tab BSC Information and click the button
Ater Connection Channel.
The Ater connection channel 0 is configured in the GEIUT board in slot 14 of the
GEPS subrack 0.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Procedure
Step 4: Choose the menu BSC Maintenance > Maintain Transmission and
Signaling > Query MTP2 Link State.
Type 0 in Subrack NO., 14 in Slot NO., and 0 in Link NO. and then click the
button Query.
If Link Status is Service Subscribed, the MTP2 link is operational.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Procedure
Step 5: Choose the menu BSC Maintenance > Maintain Transmission and
Signaling > Query MTP3 Link State .
Select subrack 0, slot 14, link 0, GXPUM 0, and CPU 0 and then click the button
Query.
If the link status is available, the MTP3 link is operational.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Procedure
Step 6: Choose the menu BSC Maintenance > Maintain Transmission and
Signaling > Maintain SCCP .
Type 0 in DSP Index, select Query in Operation, and click the button Query.
If both DSP Status and SCCP Status are Allowed and Congestion Status is
Normal, the DSP status of the SCCP link is normal.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Procedure
Step 7: In the tab page Subsystem Operation, type the subsystem index NO.,
select Query in Operation, and click the button Query. Query the status of
subsystems 0 to 3.
If Subsystem Status is all Normal, the SCCP link subsystem is operational. If
the MTP2, MTP3, and SCCP link status are all normal, the control plane link of
the A interface is operational.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying User Plane Channel


Purpose
To check whether the user plane
channel of the A interface is operational
when E1/T1 bears the A interface.
Procedure
Choose the menu BSC
Maintenance > Maintain User
Resource > Maintain A Interface
Circuit.
Select the GTCS subrack NO., type
the CIC number range, and click
Query.
If CIC status is Idle or Busy, the A
interface circuit channel is
operational.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Pb Interface
Ensure the following conditions before
verifying the Pb interface:

Verify physical link

The BSC commissioning is passed.


The transmission between the BSC and the

Verify control plane link

PCU is connected.
The PCU is operational.
The process of verifying the Pb interface is
shown on the right.

HUAWEI TECHNOLOGIES Co., Ltd.

Verify user plane link

Process alarms

HUAWEI Confidential

Verifying Physical Link


Purpose
To check whether the physical channel of the Pb interface is operational when E1/T1
bears the Pb interface.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Physical Link


Procedure
Choose the menu BSC Maintenance > Maintain Transmission and Signaling >
Query Interface Board Port State .
In the displayed interface, select the subrack NO., slot NO., and port NO. for the
GEIUP board connected to the PCU.
If Port Status is Normal, the Pb interface physical link is operational.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Control Plane Link


Purpose
To check whether the control plane link of the Pb interface is operational.
Procedure
Choose the menu BSC Maintenance > Maintain Transmission and Signaling >
Maintain LAPD Link .
Select PBSL under LAPD Link Range, select PCU from Candidate NE, and click
the Query button.
If PBSL link status is normal, the control plane link of the Pb interface is operational.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying User Plane Channel


Purpose
To check whether the user plane channel of the Pb interface is operational when
E1/T1 bears the Pb interface.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying User Plane Channel


Procedure
Choose the menuBSC Maintenance > Maintain User Resource > Maintain Pb
Interface Circuit .
In the displayed interface, select Pb interface position, and select the subrack NO.,
PCU NO., and CIC number range.
If CIC status is Not Installed, Idle, or Busy, the user plane channel of the Pb
interface is operational.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Chapter 1 Overview of Commissioning


Chapter 2 Commissioning of Interface
Chapter 3 Service Verification

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Verifying Services
Ensure the following conditions before verifying services:
The BSC commissioning is passed.
The commissioning for the Abis, Ater, A, and Pb interfaces is passed.
The test MS is functional and already subscribed in the HLR.
Verification services comprise
Dialing test for basic services
Dialing test for feature services

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Dialing Test for Basic Services


Purpose
To check whether the BSC6000 can provide basic services.
The basic services can be categorized into speech services, packet
services, and O&M management services.
Before verifying the basic services, start the related interface message
tracking on the LMT.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Dialing Test for Basic Services


Basic
Service

Speech
service

Procedure of Dialing Test

Expected Result

Use a test MS to dial a fixed-line phone for


50 times, and use the fixed-line phone to
dial the test MS for 50 times.

The call proceeding success ratio is


more than 90%.
Speech is clear and no evident
noise exists.

Use a test MS to dial another MS for 50


times.

The call proceeding success ratio is


more than 90%.
Speech is clear and no evident
noise exists.

Use a test MS to send fax to the fax


machine, and use the fax machine to send
a fax to the MS.

The fax file is sent and received


correctly.

Use a test MS to test GPRS or EDGE


service functions.

The data rate is consistent with the


test data rate obtained in the lab.

While services are running, perform


active/standby switchover 5 times for the
boards GXPU, GSCU, GTNU, GPUC,
GEIU, and GGCU.

The switchover success ratio is


more than 90%. The running
services are not affected.

Data service

O&M
management

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Dialing Test for Feature Service


Purpose
To check whether the BSC6000 can provide License feature services.
Feature services vary according to offices. This presentation describes
inter-system handover service, location service, and AMR service.
Before verifying the feature services, start the related interface message
tracking on the LMT.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Dialing Test for Feature Service


Feature
Service

Procedure of Dialing Test

Intersystem
handover
service

Handover a dual-mode MS
from the GSM network to the
UMTS network for 50 times.
Handover the dual-mode MS
from the UMTS network to the
GSM network for 50 times.

The call proceeding success


ratio is more than 90%.
Speech is clear and no
evident noise exists.

Location
service

Use a test MS to initiate a call.


Locate the MS while the
connection is in hold.

The MS position meets the


precision requirements.

AMR
service

Use a test MS to dial a fixedline phone for 50 times. Select


the speech version at AMR.

The call proceeding success


ratio is more than 90%.
Speech is clear and no
evident noise exists.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Requirement

Connecting BSC6000 to M2000


Perform the following operations on the Telnet terminal of the
BSC6000:
Run the route command to query the configured route information.
The information about the route to the M2000 is displayed. The route
information is configured on the GBAM server.
If route information exists, the operation is completed.
If route information does not exist, run the route command.
Set Destination Network Address to M2000 Server IP Address, set
Destination Address Mask to M2000 Server IP Address Mask, and set
Forward Routing Address to Router IP Address.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

This presentation describes the following


information about the HUAWEI BSC6000:
Commissioning preparations and
precautions
System commissioning process
Verification methods of interface data
Service verification methods and steps

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Internal Use (Only)

Dec. 31 2006

Thank You