Radio Network
Optimization Work Flow
ISSUE 4.0

www.huawei.com

RNP Staff Training Dept.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Objectives
After this course, you will
Know about the Radio Network
Optimization Work Flow
Master the key point in the flow
Make the radio network planning be
more standard and controllable

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

RNP&O Service
There are four phases during network lifecycle: Pre-Bidding, Bidding,

Implementation, Maintenance
The RNP&O services are present throughout the network lifecycle, divided

by four parts: Scheme Traction, Radio Network Planning (including Nominal


Planning, Site Selection, Detail Planning), Radio Networking Optimization
(including Initial Tuning, Network Performance Improvement), On-going

PreBiddin
g

Scheme Traction

Biddin
g

Implementati
on

Nominal planning

RNP&RNO

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Maintenan
ce

On-going

Page 4

Initial Tuning Procedure


Equipment
Installation

Acceptance Test

Software
Debugging

RNP Service

Parameters
Checking

RNP participate

Single Site
Verification
Test and
Analysis (DT)
RF Trouble
Shooting
Test for Comparison
(for swap)
Initial Tuning Report

Maintenance

Engineering Implementation

Key Points
How to find the solution for engineering quality problems and push it
The Initial Tuning must be finished before the network come to commercial use
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 5

Initial Tuning Procedure


Single Site Verification
To check whether the actual engineering parameters and RF parameters
are consistent with the planning result, and whether the service function, as
well as the coverage ability and the antenna installation, is normal or not.

Attention

The PM should launch a spot-check to the sites by


5%.
Alarm data and cells status should be collected
before the drive test.
ENGINEERING It is necessary to check whether the software version
PARAMETERSisTABLE
suited or not.
XXX SITE VERIFICATION TABLE
Hardware and its installation issues
Data configuration
SINGLE SITE VERIFICATION REPORT
Antennas issues
Alarm messages

Testing instruments

Input

ENGINEERING PARAMETERS TABLE


PROBLEMS TRACING TABLE

Key Point:
How to find the solution for engineering quality problems and push it

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

NPI Network Performance Improvement


Initial Tuning

Acceptance Test
Customers Complaint Resolve

RF Optimization
Interference test and analysis
Neighbor cell planning
RF parameters optimization
VIP user analysis
KPI analysis
Network performance monitoring
Network performance
acceptance test

Implementation

Maintenance

Key points
The manners and contents of Acceptance test: test by cluster, test the whole network
It is different between network performance acceptance test and equipment acceptance test. The performance
acceptance test is to check whether the KPI meet the requirement mentioned in the contract.
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

NPI Network Performance Improvement


RF Optimization

To adjust the engineering parameters and system parameters, to


meet the coverage requirement and control the interference

Attentions:
Simulative test with load should be taken
for trial network
Follow the RF and engineering parameters
Engineering parameters tuning scheme
optimization work flow
The optimization
the region Parameter table
along
ENGINEERING PARAMETER
Engineering
TABLE methods
border should be consulted to each other.
Drive Test Data
should be tracing table
The neighbor cell list settingProblems
Alarm data/Cells status
parameters
DT
and traffic statistic comparison
Traffic statistic data considered during engineering
adjusting.
Coverage target range
after optimization
All the adjusting should report
be informed to the
Hardware and parameters
related persons.
configuration

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 8

NPI Network Performance Improvement


Interference Analysis

The interference is exist during all phases of the optimization process. There
are two sorts of the interference, system internal and external.

DT result
Traffic statistic report
Attentions
Network engineering The
parameters
solution responsibility of external
and topographical map interference should be due to the
User complaint and equipment
customers. And the local Radio
alarm data
Committee should take part in the
The antenna configuration
interference clearance if necessary.
The other related information
NETWORK INTERFERENCE
about the customer
Import
ANALYSIS REPORT
Spectrum resource
Instrument
The references

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 9

NPI Network Performance Improvement


Neighbor cell optimization

Set the suitable neighbor cell list and handover parameters, to ensure
the smooth handover of the network.

Attentions:
The unloaded drive test
should be performed during
Network engineering parameters
and topographical map neighbor cell optimization
The drive test route should be
The drive test result
bidirectional.

The neighbor list table, the


handover parameters
The signaling tracing data
The traffic statistic data
The references

import

The optimization documents


Network adjusting application
DT and traffic statistic
comparison report after adjusting

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 10

NPI Network Performance Improvement


RF parameters optimization

Adjust the RF parameters, to improve the network performance and


KPI
The traffic statistic data
The drive test result
Attentions:
The signaling tracing data
Theand
parameters
adjusting procedure for
The local landform
the
running network.
environment
The key technologies should be taken more
Network engineering parameters
RF parameters adjusting scheme and
attention to
and topographical map
the application form
The users distribution
Import
DT and traffic statistic comparison report
The references
after adjusting
Key points:
The adjusting application should be review by the TS team
The network KPI and coverage should be monitored after adjusting

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 11

NPI Network Performance Improvement


VIP guarantee

Guarantee the VIP communication, and get their approbation

to the network performance

Attentions:
The VIP guarantee relates to the
VIP users information
customers satisfaction to the
Marketing information
optimization work, and even relates
Testing instruments
to the marketing development.
VIP communication quality
estimation
VIP users communication quality
guarantee scheme
VIP user issues resolve report

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 12

NPI Network Performance Improvement

Network Performance Monitoring


The network performance will meet the requirement of acceptance after the
optimization. But before the official acceptance test, continuous monitoring should
be taken to ensure the prosperous acceptance.

Attentions
For swap or expansion project, the network
performance before and after the implementation
should be included in the optimization report.
The optimization
scheme
To have a self-check to confirm if the performance
meet the acceptance requirement, and take the
Daily network performance
corresponding solution procedure according to the
monitoring measure
self-check result.

The network information, including


KPI, traffic statistic, parameters
configuration

Daily network monitoring form


Network pre-alarm analysis report
Daily optimization report

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 13

NPI Network Performance Improvement

Customer Acceptance
After getting across the self-check, apply the acceptance to the customer, and
Attentions:
prove that the network performance
meet the requirement of the acceptance
The
test principles
should
be confirmed with the
through
theacceptance
traffic statistic,
CQT and
DT result.

customers before the official test.


It should take the acceptance test separately by clusters for largescale network.
Acceptance application report
It should be divided into importance and common areas for the test
Equipment areas.
commissioning report
Engineering installation
acceptance
reportbe consulted with the customers.
The test route
and spot should
RF optimization
The report
test instruments
Acceptance test
performance
index be taken into consideration before test.
Various
accidents should
Acceptance methods
Know about the acceptance test personnel, and know about their
concern
points.
Test instrument
preparation
Never give the indiscreet promises during the acceptance test.
The references
The network performance acceptance is different from the equipment
RF OPTIMIZATION REPORT
installation acceptance.

Export

HUAWEI TECHNOLOGIES CO., LTD.

ACCEPTANCE REPORT

Huawei Confidential

Page 14

RNP&O work flow and the key points

RNP
RNP

Network
NetworkPreliminary
PreliminaryPlanning
Planning

Site
SiteSelection
Selection

Detail
DetailPlanning
Planning

RNO
RNO

Radio
RadioNetwork
NetworkInitial
InitialTuning
Tuning

Network
NetworkPerformance
Performance

Improvement
Improvement

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 15

Thank you
www.huawei.com