Configuration
Contents
Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
LMT Configuration
Data Synchronization
Configuration Process
E1 transmission
FE transmission
Start
Creating managed
element at SDR site.
Configuring physical
data at SDR site.
Configuring radio
resource at SDR site.
Start
Configure OMCR
Data
Configure OMCB
Data
configuring
Ethernet, global
port number, IP,
SCTP, and
OMCB
Configure LMT
Transmission Parameter
Synchronize data
to foreground
Configure OMCR
Data
Configure OMCB
Data
Synchronize data
to foreground
Perform data
synchronization
after link setup
End
Support remote
link setup
End
Configuration Process
Configuration Process By Using LMT
Start
Configure OMCR
Data
Online Upload
data at background
Perform online
upload data
after link setup
End
Contents
Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
LMT Configuration
Data Synchronization
In the above topology, there is no RPU portion. In fact, the portion of route processing in iBSC is performed by RPU.
Networking Instance
Items
Configuration Information
Mask
139.1.1.254
255.255.255.0
139.1.1.200
255.255.255.0
118.18.1.1
255.255.255.255
118.18.1.1
255.255.255.255
118.18.X.254*
255.255.255.0
118.18.X.100
255.255.255.0
Contents
Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
LMT Configuration
Data Synchronization
*While using FE mode at Abis, it is not required to configure DTB board and EUIP
board for the resource shelf at Abis , and you shall configure IPBB interface board for
the resource shelf at Abis
The IPBBs for OMCB access and SDR access can use the different network ports on a board,
but these two network ports shall be configured in different network segments.
Configure a Rack
Configure a Cell
2 Configure TRX
Contents
Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
LMT Configuration
Data Synchronization
Keeping consistent
with the GSM base
station id
IP property
For E1
transmission,
it is not
required. After
link setup
between
foreground
and
background,
automatically
set it.
7 OMCB connection
the IP
address
of
OMCB
channel
*While using FE at Abis, you need use LMT to configure transmission parameters (consistent with the configuration data on OMCB).
After link setup between foreground and background, you can synchronize the OMCB configuration data with foreground.
Contents
Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
SDR LMT Introduction
Data Synchronization
Overview
Local LMT configuration is same as the configuration done by OMCB. On field, you
also can use all data configured by LMT,create the SDR managed element for this
site on OMCB, to set up a link between foreground and background, so the SDR
site data is reversely constructed at background.
LMT Directory
EOMS: The special software version of EOMS and EFMS can be loaded or
activated at the site by using LoadTool.
EOMS_EFMS: the copy version of operation, maintenance, and fault
management.
JRE: the installer of Java running environment.
LMTSetup.exe: DMS and PMS installer file.
readme.txt: the readme file for installer.
CC ETH1
If there are CC boards
on slot 1 and 2, you shall
view the MS indicator
after powering on.
BS configuration
Configure
ground resource
Configure
transmission
resource
Configure radio
Step 1.1
Step 1.2
Step 1.3
Step 2.1
Step 2.2
Step 2.3
Step 2.4
Configure topology
Step 2.5
Step 3.1
Step 3.2
Step 3.3
Step 3.4
Step 3.5
Step 3.6
Configure IP parameters*
Step 3.7
Step 3.8
Step 4.1
*Configure it
on FE
transmission
for link setup
between
foreground
and
background.
Contents
Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
SDR LMT Introduction
Data Synchronization
Data Synchronization
After link setup at foreground and
background, the small green icon
in front of the site managed
element becomes connected
state
If all configuration actions have been done by LMT at SDR site and the network transmission is proper, the
link is set up between foreground and background. After link setup, you can upload the existing data at
foreground into background.