ZXSDR Series Base Station

Configuration

Contents

Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
LMT Configuration
Data Synchronization

Configuration Process
E1 transmission

FE transmission
Start
Creating managed
element at SDR site.
Configuring physical
data at SDR site.
Configuring radio
resource at SDR site.

Start

Configure OMCR
Data

Configure OMCB
Data

configuring
Ethernet, global
port number, IP,
SCTP, and
OMCB

Configure LMT
Transmission Parameter

Synchronize data
to foreground

Configure OMCR
Data

Configure OMCB
Data

Synchronize data
to foreground
Perform data
synchronization
after link setup

End

Support remote
link setup

End

Foreground-background link setup conditions


Transmission network is ok.
Configure relevant interface parameters for SDR site in
OMCR.

Create the managed element at SDR site in OMCB.


Configure the transmission parameters in LMT.

Configuration Process
Configuration Process By Using LMT

Start

Configure OMCR
Data

Create manage element


in OMCB

Configure LMT Data

Online Upload
data at background
Perform online
upload data
after link setup

End

Contents

Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
LMT Configuration
Data Synchronization

SDR Operation and Maintenance


Networking
Networking While Using Ethernet Bearing at Abis

Networking While Using E1/T1 Bearing at Abis

In the above topology, there is no RPU portion. In fact, the portion of route processing in iBSC is performed by RPU.

Networking Instance

Items

Configuration Information

Mask

IP address of network interface for


OMCB at iBSC

139.1.1.254

255.255.255.0

OMCB server IP configured by


iBSC

139.1.1.200

255.255.255.0

IP Abis virtual address of iBSC

118.18.1.1

255.255.255.255

OMCB channel address

118.18.1.1

255.255.255.255

IP address of network interface for


SDR site at iBSC

118.18.X.254*

255.255.255.0

*In the instance, X=2, indicating GSM site id is 2.

IP address configured by SDR site

118.18.X.100

255.255.255.0

Contents

Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
LMT Configuration
Data Synchronization

Configuring BSC Function


OMCB IP

IPABIS and OMCB channel IP

For E1 transmission, both addresses are same. For FE


transmission, two addresses are different if using VLAN, and you
shall set two virtual addresses. If you do not use VLAN, both
addresses are same too.

Configuring Abis Interface Board (E1 Abis)


1 DTB board PCM information
while iBSC connects SDR site
by using IP OVER E1 mode,
select Multi frame.

Create the EUIP board

Configuring Abis Interface Board (FE Abis)


Configure IPBB interface board

*While using FE mode at Abis, it is not required to configure DTB board and EUIP
board for the resource shelf at Abis , and you shall configure IPBB interface board for
the resource shelf at Abis

Configuring OMCB Interface Board


Configure IPBB interface board

The IPBBs for OMCB access and SDR access can use the different network ports on a board,
but these two network ports shall be configured in different network segments.

Configuring IP Abis Interface (Virtual Address)


1

Create RPU board function type

2 Set the parameters for IP ABIS

Configuring Access Interface for OMCB


1

Create IPBB board function type

2 Set the parameters for IPBB

Configuring Access Interface for SDR (E1


1 Create EUIP Interface for E1 Access
Abis)

Create IP Over E1 Configuration

Create PPP Configuration

Configuring Access Interface for SDR (FE


Abis)
1 Create IPBB board function type
2 Set the parameters for IPBB

Configuring Logic SDR Site


1

Configure a Logic Site

Configure a Rack

You can only create


B8200 while configuring
SDR site.

Configuring Logic SDR Site


1

Configure a Cell

2 Configure TRX

Contents

Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
LMT Configuration
Data Synchronization

Modifying Server Profiles


Modify deploy-030womcb.properties with omc User

Modify FTP Related Profile with omc User


the default port
number is 21

Configuring Basic SDR Data


Create SDR Managed Element

Keeping consistent
with the GSM base
station id

Create Base Station Config Set

Configuring Base Station Equipment


Create base station equipment resource
1 Resource
2 Configure physical rack BBU
management
Keeping consistent
with the GSM base
station id

3 Configure physical rack RRU

Configuring Base Station Equipment


Resource
5 Configure the rack topology
4 Configure the antenna

Configuring Transmission Resource (E1


1 Configure the E1/T1 cable
3 Configure PPP configuration
Abis)
For the SDR site
connected to BSC by
star link, select BSC;
for the SDR site
connected to parent
SDR site by chain link,
select BTS

2 Configure the HDLC

Configuring Transmission Resource (E1


Global port
4
6 SCTP
Abis)
IP Abis
RPU

IP property

For E1
transmission,
it is not
required. After
link setup
between
foreground
and
background,
automatically
set it.

7 OMCB connection
the IP
address
of
OMCB
channel

Configuring Transmission Resource (FE


3 Configure the IP property
Abis)
1 Configure the Ethernet
Select
IPbone for
direct station
and select
BTS for
cascading
station

2 Configure the global port

Configuring Transmission Resource (FE


Abis) 4 SCTP
5 OMCB connection

*While using FE at Abis, you need use LMT to configure transmission parameters (consistent with the configuration data on OMCB).
After link setup between foreground and background, you can synchronize the OMCB configuration data with foreground.

Configuring Radio Resource


1 Create base station radio resource
management

2 Configure the central frequency point

Configuring Radio Resource


3 Configure the sector parameters

5 Configure the GSM carrier

4 Configure the GSM RU parameters

Contents

Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
SDR LMT Introduction
Data Synchronization

Overview
Local LMT configuration is same as the configuration done by OMCB. On field, you
also can use all data configured by LMT,create the SDR managed element for this
site on OMCB, to set up a link between foreground and background, so the SDR
site data is reversely constructed at background.

LMT Directory

EOMS: The special software version of EOMS and EFMS can be loaded or
activated at the site by using LoadTool.
EOMS_EFMS: the copy version of operation, maintenance, and fault
management.
JRE: the installer of Java running environment.
LMTSetup.exe: DMS and PMS installer file.
readme.txt: the readme file for installer.

LMT Connects SDR

CC ETH1
If there are CC boards
on slot 1 and 2, you shall
view the MS indicator
after powering on.

Slot No.1 (CC-1) IP: 192.X.1.16


Slot No.2 (CC-2) IP: 192.X.2.16

*X is the environment ID, used to differentiate the different


SDR sites within a network. The default environment ID is
254.

The procedure of configuring the base


Items
Data Type
Steps
Configuration
station
1

BS configuration

Configure
ground resource

Configure
transmission
resource

Configure radio

Step 1.1

Configure basic parameters for the base station

Step 1.2

Configure B8200 board and R8860 rack and board

Step 1.3

Configure clock reference source

Step 2.1

Configure environment monitoring

Step 2.2

Configure TMA controller

Step 2.3

Configure serial port

Step 2.4

Configure topology

Step 2.5

Set dyr contact

Step 3.1

Configure FE parameters(using IP transmission at


Abis)*

Step 3.2

Configure E1/T1 connection(using E1/T1 transmission


at Abis)

Step 3.3

Configure HDLC path parameter(using E1/T1


transmissionat Abis)

Step 3.4

Configure PPP parameters (using E1/T1 transmission


at Abis)*

Step 3.5

Configure global port parameters*

Step 3.6

Configure IP parameters*

Step 3.7

Configure SCTP parameters*

Step 3.8

Configure 0MCB parameters*

Step 4.1

Configure the RF central frequency

*Configure it
on FE
transmission
for link setup
between
foreground
and
background.

Contents

Configuration Process
Background and Preparation
OMCR Configuration
OMCB Configuration
SDR LMT Introduction
Data Synchronization

Data Synchronization
After link setup at foreground and
background, the small green icon
in front of the site managed
element becomes connected
state

Online Uploading Data

If all configuration actions have been done by LMT at SDR site and the network transmission is proper, the
link is set up between foreground and background. After link setup, you can upload the existing data at
foreground into background.