Objectives
Contents
1.
2.
3.
4.
5.
6.
7.
Antennas
RTN 300
Front view
Electrostatic
discharge
Name plate
Radiation
High temperature
Warning labels
Rear view
Ground screw
GE port
Combo port
P&E port
Position pin
Hybrid Coupler
Split mounting bracket
Main fixture
Pin slot
Conversion
bracket
Standby fixture
Side view
Top view
Front view
Antenna port
Main tributary port
Copyright 2014 Huawei Technologies Co., Ltd. All rights reserved.
Page15
Cables
Flexible waveguide
PGND cable
Base of grounding
clip
OT
terminal
DC power cable
Positiv
e
Negativ
e
Cable
connector
Brown: 0 V
power ground
cable
Cable
sheath
Cables (Cont.)
SFP20 male
connector
View
A
XPIC cable
8-core P&E cable
Connect
or
Main
label
Main
label
View
B
P&E
label label
MGMT
P&E
label
View
A
View
RJ45B
connector
View
A
View
RJ45 C
connector
Cables (Cont.)
Waterproof socket for outdoor fibers
Outdoor cable
LC/PC
connector
RJ45
connector
Multimeter
port
View
B
Main
label
View
B
Copyright 2014 Huawei Technologies Co., Ltd. All rights reserved.
Page18
PI auxiliary
mounting
bracket
Ground
screw
Side view
Mounting
ears
Mounting ear for installation in cabinets or
on wall
Contents
1.
2.
3.
4.
5.
6.
7.
Preparation
Document
XX Network Plan
XX Engineering Design
XX Equipment Room Layout Plan
OptiX RTN 300 Radio Transmission System Installa
tion Guide
Preparation (Cont.)
Tools
Category
Description
Commo Measurin
n
g
tools
Drilling
Fixing
Bench
Hoisting
Auxiliary
Special tools
Instruments
Preparation (Cont.)
Preparation (Cont.)
Contents
1.
2.
3.
4.
5.
6.
7.
Pole Installation
Antenna Assembly
side strut
Please pay
attention to
cable
fixation
Contents
OptiX RTN 300 System Hardware Structure
Installation Preparation
Antenna Installation
RTN 300/Hybrid Coupler and Related Cable Installatio
n
5. PI and Related Cable Installation
6. Loading NE data and installation checking
7. Link Commissioning
1.
2.
3.
4.
Contents
4. RTN 300/Hybrid Coupler and Related Cable Installation
4.1 Installing RTN 300
4.2 Installing hybrid coupler
4.3 Installing the cables of RTN 300
Vertical
polarization
direction
(default)
Horizontal
polarization
direction
The arrow
points to
the H mark
Horizontal
polarizatio
n direction
Copyright 2014 Huawei Technologies Co., Ltd. All rights reserved.
Page42
Screwing-stop surface
Installation surface
Vertical
polarizer
Horizontal
polarizer
Copyright 2014 Huawei Technologies Co., Ltd. All rights reserved.
Page44
Apply vaseline
to the O ring
. Do not
apply vaseline
on the end
face of the
antenna port.
Check whether
the elastomer
is fixed.
Ensure this
side is up.
Install and lay out the DC power cable of the RTN 300.
Contents
1.
2.
3.
4.
5.
6.
7.
Step
1
Step
2
Install PI cables
P&E
MGMT
Connected
Wire clip to the P&E
port of RTN
380
Connected to the
NMS
Page59
Drilling
positions
Drill 8 holes to a
depth of 52 to 60 mm.
Mounting holes
Nut
Small flat
washer
Big flat
washer
Step2
Step3
PGND
cable
19-Inch Cabinet
ETSI Cabinet
Wall
Outdoor Cabinet
With DC
Contents
1.
2.
3.
4.
5.
6.
7.
Loading NE Data
Check the PI
Contents
1.
2.
3.
4.
5.
6.
7.
Procedure
1. Start the laptop and log i
n to the operating syste
m.
2. Set the IP address of the
laptop.
3. Connect the site to the W
eb LCT in an appropriate
way according to the con
figurations of each site.
Procedure
1. On the desktop, double-click the Start Web LCT icon.
The system displays the USER LOGIN window of the Web LCT.
Password:
Changeme_123
Copyright 2014 Huawei Technologies Co., Ltd. All rights reserved.
Page87
Procedure
Procedure (Cont.)
Synchronizing NE Time
Changing NE Attribute
Summary
Antenna installation
RTN 300 and related cables installation
PI and related cables installation
Loading the data and installation checking
Link commissioning
Thank you