Escolar Documentos
Profissional Documentos
Cultura Documentos
Management
Jens Schneberg
Solution Architect MRO/M&E
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 1 Jens Schoeneberg (E2)
Content
SAP Solution
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 2 Jens Schoeneberg (E2)
Content
SAP Solution
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 3 Jens Schoeneberg (E2)
What is a Rotable?
Repairable Part
Serialized
Long Life Cycle
Expensive Components
Big / Complex Components
Life Limit Controlled
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 4 Jens Schoeneberg (E2)
Stock
Procurement
Scrapping
Serviceable
Unserviceable
In-house Repair
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 5 Jens Schoeneberg (E2)
Subcontracting
Part(s)
Part(s)
Warehouse
Replacement
part(s)
Part(s)
Closed-loop scenario
Technical
object
Part(s)
Repair
process
Part(s)
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 6 Jens Schoeneberg (E2)
Repair
process
In-house
Subcontracting
Inventory
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 7 Jens Schoeneberg (E2)
Business
related
Aviation
Authority
related
Content
SAP Solution
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 8 Jens Schoeneberg (E2)
As-Maintained Configuration
Functional
location
Technical
objects
Equipment/
Serial
number
Assembly
Material
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 9 Jens Schoeneberg (E2)
Material E-2002
Serial data
Stock information
Serial number history
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 10 Jens Schoeneberg (E2)
Removal of part
Shipment of part
Workshop /
Subcontractor
Warehouse
Replacement part
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 11 Jens Schoeneberg (E2)
Counter
Flight Hours
Take-offs/Landings
Counter
Reading
Flight hours 2351
Counter
Reading
Landings 511
Input Sources:
- Manually via R/3
- Intranet/Internet
- PM-PCS Interface
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 12 Jens Schoeneberg (E2)
Aeroplane counter
20 Take-offs/landings
20/02.
30 Take-offs/landings
12.02.
350 Take-offs/landings
20.02.
360 Take-offs/landings
Difference of 10
take-offs/landings
carried forward
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 13 Jens Schoeneberg (E2)
Rotable Exchange
Update on
Flight Hours
Life
Contolled
Rotable
Rotable
Maintenance
Plan R/3
Pump P111
Aircraft Configuration
P111
1 4 5 3 Hours
Automatic
creation
PM/CS
PM/CS
Order
Order
Discrepancy
found
Manual
creation
PM/CS
Notification
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 14 Jens Schoeneberg (E2)
Trigger/Initiate
Rotable
Exchange
01. 0
n
o
i
t
lla
Insta
Rem
oval
20.
3.98
Usage list
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 15 Jens Schoeneberg (E2)
09.9
Purchasing
Ser No.-1
New
Subcontractor
Ser No.-1
New
Ser. No. 1
Unserviceable
Shipping
In-house
Ser No. 1
Ser. No. 1
Ser No. 1
Serviceable
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 16 Jens Schoeneberg (E2)
Receipt
Material
with valuation type A
(condition-based
valuation)
Valuation type
NEW
$ 3,000.00
Valuation type
SERVICE
$ 2,200.00
Valuation type
UNSERVICE
$ 1,280.00
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 17 Jens Schoeneberg (E2)
Removal of part
Shipment of part
In-house
Workshop
Warehouse
Replacement part
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 18 Jens Schoeneberg (E2)
Refurbishment Order
Goods issue
with movement
type 261
Stock
Plant 0001
SLoc 0002
UNSERVICE
53, 81, 27
UNSERVICE
Plant:0001
SLoc: 0002
SERVICE
Plant: 0001
SLoc: 0001
Goods receipt
with movement
type 101
SERVICE
Stock
Plant 0001
SLoc 0001
EnjoySAP - Refurbishment
Automatic change of valuation type during goods movement
Stock
Stock
Material
P-2001
Serial number 53
UNSERVICE
Stock
Stock
SERVICE
Plant
1000
Storage location
0002
Batch
UNSERVICE
Material
P-2001
Serial number 53
Plant
1000
Storage location
0001
Batch
SERVICE
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 20 Jens Schoeneberg (E2)
Goods
Goods
issue
issue
Object list:
- Serial number 1
- Serial number 2
- Serial number 3
Subcontracting Process
Removal of part
Shipment of part
Subcontractor
Warehouse
Replacement part
(2) Subcontracting
process
New with
IS A&D 4.6
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 21 Jens Schoeneberg (E2)
MRO Provider
Subcontractor
+
Purchase Order
10 L
xxxxxxxxxxxx
xxxxxxxxxx
xxxxxxxxxx
xxxxxxxxx
xxxxxxxxxxxx
xxxxxxxxxx
xxxxxxxxxxxxx
xxxxxxxxx
Warehouse
Purchase order
Subcontracting
DISC
1pc
BLADE 2pc
SC inventory monitor
DISC
BLADE
(1) Create SD
delivery
(2) Post goods
issue for P/O
SC vendor SUBC1
SC = Subcontracting
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 23 Jens Schoeneberg (E2)
Vendor
stock
Goods Receipt
SC vendor
Comp.: DISC
Goods receipt
of rotable
Purch. Order
history
Warehouse
SC = Subcontracting
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 24 Jens Schoeneberg (E2)
Goods Receipt
Consumption of
parts from
SC vendor stock
Goods receipt of
servicable parts
Part number change
Serial Number change
Valuation change
Material number of rotable changes (due to upgrade), but serial number remains the
same
SC = Subcontracting
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 25 Jens Schoeneberg (E2)
Warranty Assignment
Tail G-BIKA
Valid from 5.1.1998
Master warranty
Description
Warranty services
Warranty counter
Measuring point:
Flight hours
Cycles
Assignment
Tail C-678
Valid from 12.10.1998
Measuring point:
Flight hours
Cycles
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 26 Jens Schoeneberg (E2)
Content
SAP Solution
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 27 Jens Schoeneberg (E2)
Removal of part
Supported functions
Goods receipt/issue
Change of ownership
Change of parts condition
Valuation change
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 28 Jens Schoeneberg (E2)
Warehouse
Replacement part
Level 1
Level 2
Level 3
No of Aircraft
No of Locations
Budget
Costs (have to be
calculated)
Service Level
....
Repair Float
required
Repair Float
required
per location
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 29 Jens Schoeneberg (E2)
Optimal Stock
per location
* Depends on client funding
Planning System
R/3
APO
Maintenance plan
Forecast
DP
Historical data
PM/CS order
Detailed Planning
SNP
Inventory
Refurbishment order
P.O. subcontracting
Fullfillment Planning
PP/DS
Reliability Monitoring in BW
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 31 Jens Schoeneberg (E2)