Management CAPM
IN2026
Module 3
Project Time
Management
Content Module 3
3. Project Time Management
Concepts Definitions
Project Time Management includes the processes
required to ensure timely completion of the project.
Its major processes are:
Activity Definitionidentifying the specific activities that
must be performed to produce the various project
deliverables.
Activity Sequencingidentifying and documenting
interactivity dependencies.
Activity Duration Estimatingestimating the number
of work periods which will be needed to complete
individual activities.
Schedule Developmentanalyzing activity sequences,
activity durations, and resource requirements to create the
project schedule.
Schedule Controlcontrolling changes to the project
iv. Constraints.
v.
Assumptions.
Decomposition.
In some application areas, the WBS and the activity list are
developed concurrently.
ii. Templates.
In addition, the activity list for a WBS element from the current
Activity List.
These updates are often called refinements and are most likely
when the project involves new or unproven technology.
Activity List.
While these effects are often apparent in the activity list, the
product description should generally be reviewed to ensure
accuracy.
They should be used with care (and fully documented) since they
may limit later scheduling options.
External dependencies.
vi. Constraints.
vii. Assumptions.
Activity List.
ii. Constraints.
iii. Assumptions.
iv. Resource Requirements
While these effects are often apparent in the activity list, the
product description should generally be reviewed to ensure
accuracy.
Resource Capabilities.
Project files
Expert Judgement.
For example:
The final schedule for the same project, however, must identify
which specific consultants will be available..
Calendars
vi. Constraints
Mathematical Analysis.
The resulting dates are not the schedule, but rather indicate the
time periods within which the activity should be scheduled given
resource limits and other known constraints.
iii. Simulation
iv. Resource Leveling Heuristics
Project Schedule.
For example:
Schedule updates.
References
http://www.pmi.org/
http://www.projectmanagementdocs.com/
http://www.pmdocuments.com /
http://www.brighthubpm.com/monitoring-projects/103492-project-control-techniques-and-tips /
http://www.projectsmart.co.uk/earned-value-management.php
http://www.izenbridge.com /
http://www.pmi.org/Business-Solutions/OPM3-Case-Study-Library.aspx
https://www.ashgate.com/pdf/SamplePages/Essentials_of_Project_Management_3rd_Intro.pdf
http://www.mypmps.net/en/mypmps/knowledgeareas/scope/scope-definition.html
https://brainmass.com/file/225952/Khan.pdf
http://www.softwareresearch.net/fileadmin/src/docs/teaching/SS06/PM/PMBOK6.pdf