PIPING DRAWINGS SUPPLY DETAILED INFORMATION TO ENABLE A PLANT TO BE BUILT. INFORMATION ON THE UNDERGROUND FACILITIES ALSO FORM PART OF THE REQUIREMENTS. THE KEY PLAN IS HOWEVER GENERATED FROM THE SITE PLAN SITE PLAN CONTD. THE TRUE NORTH (GEOGRAPHIC) AND PLANT NORTH AND THEIR ANGULAR SEPARATION.
PIPING DRAWINGS SUPPLY DETAILED INFORMATION TO ENABLE A PLANT TO BE BUILT. INFORMATION ON THE UNDERGROUND FACILITIES ALSO FORM PART OF THE REQUIREMENTS. THE KEY PLAN IS HOWEVER GENERATED FROM THE SITE PLAN SITE PLAN CONTD. THE TRUE NORTH (GEOGRAPHIC) AND PLANT NORTH AND THEIR ANGULAR SEPARATION.
Direitos autorais:
Attribution Non-Commercial (BY-NC)
Formatos disponíveis
Baixe no formato PPT, PDF, TXT ou leia online no Scribd
PIPING DRAWINGS SUPPLY DETAILED INFORMATION TO ENABLE A PLANT TO BE BUILT. INFORMATION ON THE UNDERGROUND FACILITIES ALSO FORM PART OF THE REQUIREMENTS. THE KEY PLAN IS HOWEVER GENERATED FROM THE SITE PLAN SITE PLAN CONTD. THE TRUE NORTH (GEOGRAPHIC) AND PLANT NORTH AND THEIR ANGULAR SEPARATION.
Direitos autorais:
Attribution Non-Commercial (BY-NC)
Formatos disponíveis
Baixe no formato PPT, PDF, TXT ou leia online no Scribd
DETAILED INFORMATION TO ENABLE A PLANT TO BE BUILT. INFORMATION ON THE UNDERGROUND FACILITIES ALSO FORM PART OF THE REQUIREMENTS. PRIOR TO PIPING DRAWINGS,THE SITE PLAN AND EQUIPMENT ARRANGEMENT DRAWINGS ARE PREPARED AND FROM THESE TWO DRAWINGS THE PLOT PLAN IS DERIVED. c c THESE THREE DRAWINGS ARE USED AS THE BASIS FOR DEVELOPING THE PIPING DRAWINGS (PIPING GENERAL ARRANGEMENT AND ISOMETRIC DRAWING).THE KEY PLAN IS HOWEVER GENERATED FROM THE SITE PLAN àc
THIS IS A DRAWING WHICH SHOWS THE WHOLE SITE INCLUDING BOUNDARIES,ROADS,RAILROAD SPURS,PAVEMENT,BUILDINGS,PROCESS PLANT AREA,LARGE STRUCTURES,STORAGE AREAS,EFFLUENT PONDS,WASTE DISPOSAL,SHIPPING AND LOADING AREAS. àc
THE TRUE NORTH (GEOGRAPHIC ) AND PLANT NORTH AND THEIR ANGULAR SEPARATION SHOWN. ƋSEE FIG 1 BELOW ÷c
àc
KEY PLAN IS PRODUCED BY DIVIDING THE AREA OF THE SITE INTO SMALLER AREAS IDENTIFIED BY KEY LETTERS (SEE FIG.2 BELOW).A SMALL SIMPLIFIED INSET OF THE KEY PLAN IS ADDED TO PIPING AND OTHER DRAWINGS FOR REFERENCE PURPOSE. ÷c
÷c
àc à c
c
TO ACHIEVE OPTIMAL DESIGN THAT SATISFY PROCESS REQUIREMENT,THE PIPING GROUP USUALLY MAKES SEVERAL VIABLE EQUIPMENT ARRANGEMENT.PRELIMNARY PIPING STUDY IS HOWEVER REQUIRED TO ESTABLISH EQUIPMENT COORDINATE. c
c
METHOD THIS IS ACHIEVED BY CUTTING A SCALED OUTLINE OF THE EQUIPMENT FROM STIFF PAPER WICH CAN BE MOVED AROUND ON THE AREA INVOLVED.(SEE FIG 4) ÷c
c
c
WHEN THE EQUIPMENT LAYOUT IS APPROVED ,THEY ARE DEVELOPED INTO `PLOT PLANS` BY THE ADDITION OF DIMENSIONS AND COORDINATES TO LOCATE ALL MAJOR ITEMS OF EQUIPMENT .(SEE FIG.5 BELOW) ÷c
àcàc
c à PLANT NORTH AND TRUE NORTH THE GEOGRAPHIC REFERENCE POINT , , IS ALWAYS AN OFFICIALLY ESTABLISHED ONE.THE PLANT NORTH IS ESTABLISHED PARALLEL TO STRUCTURAL STEEL WORK.THE DIRECTION CLOSEST TO THE TRUE NORTH IS CHOSEN FOR THE
COORDINATES ARE USED TO LOCATE TANKS,VESSELS,MAJOR EQUIPMENT AND STRUCTURAL STEEL. (SEE FIG 6 BELOW)