Contents
Dam Ring
Armour Ring
Louver Ring
Grinding Table
Rollers
Separators
Maintenance
Performance Improvement
Parameters
Ball Mill
Vertical Mill
Crushing
Smaller Impact by
Steel Balls/Rubbing
By Compression/
Impact Force
Drying
Larger Drying
Capacity
Material Circulation
Rejected material +
Fines are fed back
Energy Consumption
High
Low
Operation Cost
100%
80%
Operations
Grinding
Raw materials
Cement
Drying
Removal of water
Separation
Coarse solids
Fine particles
Working Process
Working Process
Material
Material & Gas
Gas
Components
Inlet chute
Mill Table
Dam ring
Armour ring
Louver ring
Grinding table
Rollers
Roller wheels
Rocker Arm
Hydraulic cylinder
Separator
Cage rotor
Reject cone
Scrapers
Outlet duct
Motor
External Circulation
Dam Ring
Vital part
Material (bed) thickness
Retention Time
Air/gas flow pattern around mill table
Mill capacity, fineness, vibration, power, etc.
Armour Ring
Protection of
Armour Ring
Mill Body
Mill Body
Dam Ring
Separator Performance
Tabl
e
Related with the Dam Ring
Air Flow
Configuration (Inclination)
Low Angle
( < 50 )
High Angle
( > 70 )
Air Flow
into the
table
Unnecess
ary
Circulatio
n
Uniform flow
of fine
particles
Efficient
Separation
Louver Ring
Swirling air
in mill body
Reduce
separator
rotor driving
power
Longer time
for drying
material
Grinding Table
Transmits the entire force and mill power
Depends on
Little Vibration,
Efficient Grinding
Rollers
Large, tapering rotating
cylinders
Large linking elements
required between
hydraulic cylinder and
roller arm
Hydraulics critical
Grinding Concept
Vertical roller mill
Grinding force = Roller weight +
(pressure) Force
Roller rolls
freely with
table
Material
bed
Feed
Table moves with
material
drive
Max Particle size in feed: 5-8 % of roller
Feed size:
diameter
f (Roller )
Separator
Reject cone
Cage rotor
Separator
FR
Air
External Circulations
fresh feed
bucket elevator
louvre ring
scraper
collecting conveyor
Maintenance
Vibration
T/H
Rollers partly
worn peak
efficiency
Vibration worsens
TIME
Rollers need to be replaced.
Grinding efficiency worsens as you lose
roller shape.
Mombasa / June
2009
Performance
Improvement
Continuous control of the
air flow measurement
(annubar vs exhaust fan
efficiency)
Water injection
peripheral:
clogging on-line
detection.
Water injection
on table
inconclusive
Dam ring: height
regularly controlled. To
adapt to table profile
Periodic control
of nitrogen
pressure
False air
reduction