SUBGRADE
PREPARATIONS
By: Erwin Jay Deyto
B.S. C.E./4th yr.
SUBGRADE
THIS
SUBGRADE PREPARATION
THIS
MATERIAL REQUIREMENTS
CONSTRUCTION REQUIREMENTS
Prior
30mm
SUBGRADE IN ROCK
EXCAVATION
SURFACE
IRREGULARITIES
UNDER THE SUBGRADE LEVEL
REMAINING AFTER TRIMMING
OF THE ROCK EXCAVATION
SHALL BE LEVELED BY PLACING
SPECIFIED MATERIAL AND
COMPACTED.
SUBGRADE ON EMBANKMENT
AFTER
SUBGRADE ON EXISTING
PAVEMENT
PROTECTION OF COMPLETED
WORK
METHOD OF MEASUREMENT
1.
2.
BASIS OF PAYMENT
PAY ITEM NUMBER
DESCRIPTION
105(1)
SUBGRADE PREPARATION
(COMMON MATERIAL)
SQUARE METER
105(2)
SUBGRADE PREPARATION
(EXISTING PAVEMENT)
SQUARE METER
105(3)
SUBGRADE PREPARATION
(UNSUITABLE MATERIAL)
SQUARE METER