Introductio
n
What

is Distributed Generation (DG)?

Generate

energy power based on site


consumption

Apply

concept independency avoid loss in cost,


difficulty and inefficiency

Direct

to user

Example

:- PV, Mini Hydro, Biomass, Biogas,


Municipal solid waste, Wind and Geothermal

Supply

10MW or less

Introductio
n
Hybrid

Renewable Energy System

(HRES)
Combination
Example:-

of different energy system

solar and diesel generator

Research Background

First wind farm in Malaysia Pulau Terumbu LayangLayang, Sabah

First solar/wind turbine hybrid system Pulau


Perhentian, Terengganu

Solar/diesel hybrid system - Kalabakan, Sabah

Problem Statement

Problem?

Is enough power generation to fulfil the power demand?

Can hybrid renewable generation reliable to supply load profile?

Is selected area give a best choosing of renewable energy for


make hybrid generation system?

Objective?

To gain feasibility study of HRES for island electrification

To design and modelling HRES for island area

To simulate the design in low cost operation

To aim the best hybrid configuration at accepted level of


electrification

Literature Review of Papers/Journals


Title

1. A significant scheme of distributed


generation system using wind-solardiesel applying in island (Jie Shu,
Xianyong Zhang, YuLiang Shen)

Conclusion

2. Modelling and Cost Analysis of Hybrid


Energy System for St. Martin Island
Using HOMER
(Nasif Mahmud, Asif Hassan, Md
Shamiur Rahman)

The wind energy is chosen to be the


priority and the solar energy is the
supplement.
This hybrid power supply system
greatly reduces the cost of electricity.
Harmless to the environment and
provides the power support for the
tourist industry and economic
development of the sea island.
The whole system runs effectively
Amount of non-renewable energy
sources is decreasing day by day.
Not feasible to use only diesel as a
source of energy generation
nowadays.
Hybrid energy generation system
can be feasible and optimized
solution.
PV-diesel-wind-battery hybrid
generation system was found most
feasible and optimized.

1. Title

Conclusion

3. Optimal Planning of Off-Grid Solar


Wind-Tidal Hybrid Energy System for
Sandwip Island of Bangladesh
(Nishat Anjum Khan, Amit Kumar Sikder,
Shammya Shananda Saha)

In the coastal area alternate energy


sources are needed to meet up the
demand.
Renewable energy resources like
solar, wind, tidal etc. can be a
potential solution.
A hybrid power system including
solar, wind and tidal energy is
feasible and cost effective.
The proposed system includes diesel
generator which increases the
reliability of the system.
According to the simulation results
the projected hybrid system is
economically feasible as
decentralized or grid interactive
system.
Proposed system can be an effective
solution of energy crisis in the
Sandwip island of Bangladesh.

Methodology

Demand
Assessm
ent

Using accurate load from the label


of the power rating on the
appliances to compute the power
rating
Multiply the calculated rate and
expected number of hours per day
and sum it all up

Resourc
e
Assesme
nt

Can be done by calculating


resources using meteorological
data available solar and wind

Fulfilled by
Hybrid
Renewable
Energy
System.

Combining one or more


renewable energy sources with
conventional energy source.
Decided to use generator
HRES.

Simulation

Optimization and design the


HRES model in HOMER (Hybrid
Optimization of Multiple Energy
Resources) software.

Selected location & Load Profile

Redang Island, Terengganu

Daily Load Profile


Daily Load Profile
2000000
1800000
1600000
1400000
1200000
1000000
800000
600000
400000
200000
0

10

11

12

13

Daily Load Profile

14

15

16

17

18

19

20

21

22

23

24

Conclusion
For

final year project 2 I need to:

Calculate

and finalize all the component (rating


and type of the solar panel, wind turbine,
inverter, and storage from the expected load
demand)

To

make sure need to be use to implement in the


HOMER Software is ready