Presentation Template
Sample Content
General Introduction
General Layout of PBU
Shop Drawings
Manufacturing Process
Delivery and Storage
On-Site Installation
Homeowners User Manual
Maintenance and Renovation
Annual Production Capacity
Additional Info
Shop Drawings
Shop drawings showing typical details of
PBU
Typical details of interfacing between PBU
wall panel to PBU floor slab
Typical details of interfacing between PBU
wall panel to wall panel
Typical details of interfacing between PBU
wall panel to structural floor slab or corbel
Connection details of sanitary wares and/or
other fittings to PBU wall/floor
Shop Drawings
Method of window installation
Typical details of interfacing between
PBU wall panel and external wall (at
window openings)
Design Considerations
Are there specific design
considerations made to cater for
drainage of water leakages?
Does the PBU system utilise single
slab or double slab system? Please
provide details of the supporting
beam/corbel where necessary
Manufacturing Process
Step-by-step description (flowchart with
illustrative photos where possible) on
the manufacturing process, including:
Water-proofing details (e.g. ??? mm upturn)
QC test details & schedule (e.g. when to
conduct each watertightness test at what
section of the PBU, static loading test on
sanitary wares etc)
On-Site Installation
Installation method statement (can provide
a pictorial summary in the slides, and
separately provide the full method
statement as a PDF supporting document)
Structural details and calculations on the
lifting support (same as above)
Protective measures taken to prevent
damages/theft after PBU is installed on-site
On-Site Installation
Please clarify if site workers can complete
the installation of pipe connections, gas
water heater/electric storage heater
without entering the PBU?
Maintenance/Renovation
Method statement on
maintenance/renovation works, including
How to carry out tile replacement works
How to carry out pipe repair/replacement
works if there is chokage (especially for
embedded pipes)
What is the minimum space requirement
between the false ceiling and underside of
top slab to allow for maintenance work
and/or install water heater drum?
Additional Info
Provision for training of
Installers/Renovators (for new
systems uncommon in the local
industry)
Any other relevant supporting info