PREAMBLE BRIDGES
For any bridge project is divided mainly in three parts :
Prefeasibility Report
Feasibility Report / Preliminary Project Report
Detailed Project Report
Prefeasibility Report :
Project preparation work start with the identification of the project This
phase is known as Prefeasibility. Which includes
Possible location
Nature of crossing
Traffic dispersal system for different alternatives
The Reconnaissance visit to the area of the intended bridge site is sufficient
at this stage.
PREAMBLE BRIDGES
Feasibility Report :
Feasibility stage preliminary surveys, data collections and investigations
are carried out.
Alternative sites are investigated
Preliminary design & rough cost estimate are made for various alternatives
Recommended alignment including
Span arrangement
Total length
Land acquisition
Traffic studies
Viability of Approaches
Preliminary cost estimate
Economic & financial viability
Time schedule for all activities
If require then 3 D images , 3 D Models etc.
PREAMBLE BRIDGES
DETAILED PROJECT REPORT:
The third stage is known as detailed project report.
In this stage detailed surveys & investigations are carried out on approved
alignment
Detailed GAD can worked out
Detailed design & good for execution drawings for all component :
Substructure, superstructure, pavement design, Miscellaneous
Detailed Bill of quantities & specifications
Tender papers : General condition of contract, Prequalification document &
fiancial bid & Tender drawings
PREAMBLE
Raiya road is one of the major city road , which connects city center
and west zone residential area . Broad gauge railway line passes through
city which crosses Raiya road near old cancer hospital .
Everyday more than six train passes , which requires shutting down
of the road by at least 12 times. it is very inconvenient to all the
commuters.
Looking at these reasons, RMC has decided to construct either
Railway Over Bridge( ROB) or Railway Under Bridge( RUB) in lieu of level
crossing.
RMC has awarded Consultancy services for preparation of Railway
Under Bridge (RuB) / Railway Over Bridge ( RoB) in lieu of railway crossing
at Raiya Road Railway Crossing , to us - M/s DELF Consulting
PRESENT SENERIO AT LC NO 6
Rajkot Ahmedabad Broad gauge line is crossing the busy
Raiya Road.
Along the Raiya Road , there are some prominent locations on
both side of the track. It is seen that Rajkot Airport is located at about
2-3 kms from this railway crossing on left side. The Madav Rao
Sindhiya Cricket stadium is located about 1 km on right side of the
Railway crossing. Kishanpara Junction is located about 200m on
right side of the Railway crossing. Kishanpara Chauk is a iconic
place of Rajkot City. Other residential & commercial complexes are
also located on both side of railway track.
Due to this heavy traffic movement is observed on Raiya Road.
During train movement the crossing is closed and there is stoppage
of vehicular traffic, resulting in to
Traffic Conjunction
Loss of Time
Air Pollution
More Fuel Consumptions
Maintenance of Pavement
Roads parallel to track exists & shall be continued
LOCATION
The existing railway and road network & junction layout as seen from the
Google image are shown below.
MADHAV RAO
SINDHIYA
CRICKECT
STADIUM
L.C. NO. 6
KISHANPAR
A
JUNCTION
LC NO 6 AT RAIYA
ROAD
ROAD TO KISHANPARA
JUNCTION
KISHANPARA
JUNCTIONZ
PROPOSAL
Looking to this situation, RMC has considered to develop a crossing
structure which can provide uninterrupted traffic movement.
For this ROB/RUB is the obvious proposition. For which we have
prepared this feasibility study.
In this regards Geo tech investigation & Topographical survey at
this location has been carried out. The project specific requirements
have been discussed with RMC officials to understand their views..
After study of geo tech reports and topography survey we have
prepared various alternatives of ROB & RUB with following
consideration.
KEY PLAN
KEY PLAN
Description Structure
Direction on
Kishanpara
Side
Right
Land
Acquired
in
Left
Sqmt
Cancer Hospital
188.00
435.00
78.06
82.00
9.18
R
73.65
10.65
R
Total
55.00
931.54
PARAMETERS TO BE CONSIDERED
FOR ROB
Alternative
Description
Alternative 1
Alternative 2
Alternative 3
Alternative 4
Alternative 5
Layout with vent-way for Race Course road traffic & ROB
ending on ancillary road beyond point 0
SIDE VIEW
ALTERNATIVES OF ROB
ALTERNATIVE 1 OF ROB WITHOUT CIRCLE SHIFTING & LAND
ACQUISTION
Features of Alternative 1 :
Without any raising option, Gradient1in 16 which is too steep . If we
increase gradient up to 1 in 22, than raising comes to 2.68mt & 3.12m if
ALTERNATIVE 2 OF ROB
Features of Alternative 2:
At Kishanpara side raising with gradient of 1 in 20 to 1in 25,
varies between 0.623mt to 2.423mt respectively.
At kishanpara side distance from approach endpoint & circle
is less than required for traffic movement due to extension of 20m.
As per IRC standard minimum size of Roundabout of 15mt is
required, and we are able to provide only 12mt, which is slightly less
looking to the availability of present lane width.
Total land acquisition is 1019 sqmt and additional land
available is 435 sqmt.
To improve road width land acquisition at Sardarbhavan &
AG office necessary. Kishanpara circle to be shifted.
ALTERNATIVE 3 OF ROB
Features of Alternative 4
Some portion of prominent garden is lost in road & junction development.
Identity of Kishanpara junction is lost.
Land acquisition is excessive.
Features of Alternative 5
Some portion of prominent garden is lost in road & junction
development.
Vent way along race course road made available.
Junction development at end towards Jilla Panchyat Road
Alt 1
COST OF JN
COST OF
DEVELOPMENT TOTAL COST
BRIDGE +
SLOPE
+SERVICE ROAD
APPROACHES
IN CR
IN CR
IN CR
1 in 16
15.25
Nil
15.25
Land
aquired
area in
sqmt
Land
Available
in sqmt
Nil
Nil
1in 20
15.50
4.50
20.00
NIl
Nil
1in 22
15.75
5.50
21.25
Nil
Nil
1in 20
15.80
2.50
18.30
1019
435
1in 22
16.00
5.50
21.50
1019
435
1 in 23
16.00
6.00
22.00
1019
435
1 in 24
16.25
7.25
23.50
1019
435
1 in 25
16.25
8.75
25.00
1019
435
Alt 3
1 in 23
17.00
4.00
21.00
2204
300
Alt 4
1 in 25
18.00
6.50
24.50
7497
2665
Alt 5
1 in 23
20.25
5.50
25.75
3970
Alt 2
Description
ALT 1
ALT 2
ALT 3
Gradient of 1 in 23
Not possible
Possible with
raising of only
0.41mt
( Which is
negligible)
Area to be Raised
6707 m2
980m2
Available length
between ROBs
Approach end &
Kishanpara Circle
Same as
Existing - 40mt
20 mt
25 mt
Lane width
Same as
Existing
More than 3
lanes in each
direction
Diameter of
Kishanpara Circle
17mt
12mt
17mt
Traffic movement
Same as
existing
Near to existing
Better than
existing
Land acquisition
1019
2204
Land availability
435
300
ALTERNATIVE 3R OF ROB
AFTER DEVELOPMENT
Regular Traffic
Jilla Panchayat Traffic
Mahila College Road Traffic
ROB (Raiya Road)Traffic
Race Course Traffic
*Critical Situation
PRESENT TRAFFIC
SCENERIO
5500
20000
8000
10000
1:25
1:30
13000
SERVICE ROAD
12000
11000
8000
5500
500
1500
9500
CARRIAGEWAY
1500
9500
CARRIAGEWAY
SERVICE ROAD
500
ALTERNATIVES OF RUB
Based on parameter considered of RUB,
alternatives are prepared as mentioned below :
SR No
Alternatives
various
possible
Description
Alternative 1
&
land
Alternative 2
Alternative 3
ALTERNATIVES OF RUB
ALTERNATIVE 1 OF RUB - WITHOUT LAND ACQUISITION &
CIRCLE SHIFTING
Features of Alternative 1 :
For RUB Gradient to avoid any lowering, the gradient comes to 1in
22, which is too steep for upward movement of Heavy Commercial
Vehicle , Multi Axle Vehicles and even for chhakada .
Features of Alternative 3 :
For this option we extended RUB by 20mt with 1.00mt lowering the
surrounding junction area.
19mt circle shifting from existing center to new center of circle towards
Sardar Vallabhbhai Patel Memorial Building.
Total land acquisition is 1019 sqmt and available land is 435 sqmt.
Alt 1
Alt 2
Alt 3
SLOPE
COST OF RUB +
APPROACHES
1 in 22
1in 25
1 in 25
13.50
13.75
14.00
COST OF JN
DEVELOPMENT
+SERVICE ROAD
2.00
3.00
2.75
TOTAL COST
15.50
16.75
16.75
Land
aquired
area in
sqmt
Land
Available
in sqmt
Nil
Nil
1019
Nil
Nil
435
SUMMARY OF COST FOR ALTERNATIVES OF RUB WITH INCREASE WIDTH (11 MT CARRIAGE WAY
WIDTH)
Alt 1
Alt 2
Alt 3
SLOPE
COST OF RUB +
APPROACHES
1 in 22
1in 25
1 in 25
15.25
15. 50
15. 75
COST OF JN
DEVELOPMENT
+SERVICE ROAD
2.00
3.50
3.25
TOTAL COST
17. 25
19.00
19.00
Land
aquired
area in
sqmt
Land
Available
in sqmt
Nil
Nil
1019
Nil
Nil
435
9.5 mt
ROB
RUB
ROB
RUB
4.