Estndares y normas de seguridad

Estndares internacionales
OSHA, NFPA, NEC, etc

Leyes peruanas
D.S. 055-2010 EM
Ley 29783
Mine Safety and
Health
Administration
(MSHA)
Catalog of Training
Products for the Mining
Industry

U.S. Department of
Labor

National Mine Health


and Safety Academy
NFPA 70 E
ounding of Systems and Circuits
f 1kV and over (High Voltage) NFPA
National
250.188. Grounding of Systems
Supplying Portable or Mobile Fire
Equipment. Systems supplying
portable or mobile high-voltage
equipment, other than substations
Protection
installed on a temporary basis, shall
comply with (a) through (f). Associatio
n
(a) Portable or Mobile Equipment.
Portable or mobile high-voltage
equipment shall be supplied from a
system having its neutral grounded
through an impedance. Where a
delta-connected high-voltage system
is used to supply portable or mobile
equipment, a system neutral shall be
Construction in Mining
Regulations and Standards

El acceso deber presentar


una pendiente transversal
adecuada (peralte) de tal
modo que asegure un
adecuado drenaje y que se
evite el arrastre de
sedimentos.
Los accesos y plataformas de
descarga deben contar con
una berma para evitar que las
llantas de los volquetes se
impregnen de topsoil
Confined Spaces
Regulations and Standards
En aquellos casos en que el
Espacio Confinado tenga
acceso vertical, en el exterior,
inmediatamente sobre el
acceso, se deber montar un
trpode, el que estar
enganchado a las lneas
retrctiles mediante un
mecanismo que permita el
rescate de los trabajadores.
Cada empresa debe contar con
una brigada de respuesta a
emergencia, entrenada,
calificada y autorizada con
capacidad para ingresar a un
espacio confinado a realizar
maniobras de rescate. Esta
brigada debe contar con
equipos de respiracin
Prctica de interpretacin
Mecnica de rocas
Ciencia terica y aplicada
al comportamiento
mecnico de rocas y de
macizos rocosos. Estudia
la respuesta de las rocas a
las fuerzas de su entorno.
Es parte de la
geomecnica que tambin
incluye la mecnica de
suelos.
En el caso de la minera,
se usa para realizar
minado, perforacin,
tneles, tiros de mina,
tajos abiertos, etc.
Shear Strength Filled
of Filled Discontinuities
The discussion presented in the
Discontinuities previous sections has dealt with the
shear strength of discontinuities in
which rock wall contact occurs over
the entire length of the surface under
consideration. This shear strength
can be reduced drastically when part
or all of the surface is not in intimate
contact, but covered by soft filling
material such as clay gouge. For
planar surfaces, such as bedding
planes in sedimentary rock, a thin
clay coating will result in a significant
shear strength reduction. For a rough
or undulating joint, the filling
thickness
http:// has to be greater than the
amplitude of the undulations before
www.scielo.org.co/scielo.php?pid=S0124-81702
009000100004&script=sci_arttext
the shear strength is reduced to that
Consideration of Excavation
Sequence
Staged Excavation Support
Figure 1 shows a situation in
which the support design is
based upon the largest possible
wedges which can occur in the
roof and walls of the
excavation. These wedges can
sometimes form in rock masses
with very persistent
discontinuity surfaces such as
bedding planes in layered
sedimentary rocks. In many
metamorphic or igneous rocks,
the discontinuity surfaces are
Figure 1a: staged excavation and not continuous and the size of
support sequence for a large cavern - the wedges that can form is
top heading limited by the persistence of
these surfaces.
A general view of the cavern
Support for excavation is given in Figure 6.
This photograph was taken

Power when the bulk of the cavern had


been completed and only a few
benches in the bottom of the
Cavern cavern remained to be
excavated. The enlarged top of
the cavern is to accommodate
the overhanging crane that is
supported on columns from the
cavern floor. An alternative
design for this cavern would
have been to support the crane
on concrete beams anchored to
the walls as is commonly done
in good quality rock.
Discussion of Support Design
and Costs
apart from rockbolts installed to
control isolated structurally
controlled blocks and wedges in
the roof and sidewalls and some
Figure 6: a view of the 25 m span Rio Grande
areas of closely jointed rock
power cavern during excavation of the lower
benches which were shotcreted, the
Application of
Air Decks in In blasting with air decks, repeated
oscillation of shock waves within the
Production air gap increases the time over which
it acts on the surrounding rock mass
Blasting to by a factor at between 2 and 5. The
Improve ultimate effect lies in increasing the
crack network in the surrounding
Fragmentation rock and reducing the burden
and Economics movement. Trials of air deck blasting
in the structurally unfavourable
of an Open Pit footwall side of an open pit
Mine manganese mine has resulted in
substantial improvements in
fragmentation and blast economics.
Better fragmentation resulted in
improved shovel loading efficiency
by 5060%. Secondary blasting was
almost eliminated. Use of ANFO
explosive with this technique
reduced explosive cost by 31.6%.
Other benefits included reductions in
overbreak, throw and ground
Prctica de interpretacin
Operaciones: informes de mina

Lenguaje
vernacular
Fractura
gramatical
Faltas ortogrficas
Necesidad de
extensa
traduccin
intralingstica
Mina subterrnea:
Los trabajos se retomaron a
informe de los 17 m. en la chimenea
4070 hacia el ala E, ya que
operaciones- la chimenea que se prepar
desarrollo para anteriormente para poder
interceptar la estructura
extraccin de recin muestra resultados.
Para la extraccin se
mineral prepara la cmara 4055 y
la chimenea 4055 en la
Galera 425E, la cual est
dirigida hacia el punto
intermedio del tajo.
Tambin se dejaron pilares
de material estril para el
control de la caja techo, y
sostenimiento con cuadros
cojos, posteriormente se
rellena con material estril
Mina
OBSERVACIONES DE
SOSTENIMIENTO: subterrnea:
Falta personal de rehabilitacin de
labores, para que trabajen con el informe de
cambio de cuadros en varias zonas
y niveles de la mina tales como: operaciones-
El nivel 11 en la galera 360 hay
varios cuadros ya colapsaron por trabajos de
el tiempo de exposicin.
El nivel 10 en la galera 320 W y E, sostenimiento
requiere el cambio de varios
cuadros y recuperacin de rieles.
El nivel 14A tambin requiere de
reforzamiento de cuadros por la
presin de las cajas ya han
producido estallido de los puntales.
El inclinado principal, falta concluir
el sostenimiento y reforzado de los
cuadros que por el tiempo de
exposicin ya requieren ser
cambiados
Water treatment report
Management quarterly meeting
Conclusiones de reporte de
operaciones mina
a) Se requiere la compra de una maquina SHOTCRETE. (Concreto Lanzado) para el
Sostenimiento en Labores de la rampa, El shotcrete posee ventajas enormes y
permite eliminar el peligro de cada de rocas, lanzando el concreto a control
remoto y a la vez permite la Fortificacin del macizo rocoso.

b) La adquisicin de una bomba de mayor capacidad para el bombeo en la rampa.

c) Se solicita personal obrero para recuperacin de material y rehabilitacin de las


labores del (nivel 10, nivel 11 y nivel 12) que estn crticas por el colapso de los
cuadros de madera de forma urgente.
d) Sealizacin de todas las labores mina las zonas de escape, el cableado, zonas
de bombeo, ventilacin y refugios; En superficie zonas de parqueo, velocidades
mximas y mnimas para la circulacin de los vehculos livianos y pesados.
e) Adecuar un sistema de sirena/ timbrado o semforo para el trnsito en la
rampa torre ya que por el movimiento de la maquinaria pesada es un riesgo
inminente para la ocurrencia de un accidente.
f) La instalacin de un nuevo pulmn en la zona cercana a la ventana 9 para el
mejoramiento del flujo del aire comprimido.
g) El reforzamiento con cuadros de madera en el polvorn principal de explosivos.
h) Mejorar el sistema de ventilacin con la adquisicin de ventiladores de mayor
capacidad (extractor).
Prctica de interpretacin

Falta hipervinculo
Procesos: Metalurgia en
procesos

Concentrado de minerales:
Concentracin: chancado, molienda, flotacin,
espesamiento y filtrado (secado)
Lixiviacin: chancado, molienda, pads de lixiviacin
(cianuro o cido sulfrico), pozas de lixiviacin, SX
Funcionamiento de un
The pregnant leach
solution (PLS) is clarified espesador de lodos
during the autoclave
discharge thickening
process. Flocculant is
added to the ACD thickener
[anim_thickener.swf] to
accelerate solids settling.
An ACD slurry containing
less liquid content exits the
ACD thickener as
underflow, and clarified PLS
exits the thickener as
overflow. The ACD
underflow slurry advances
to the autoclave discharge
filtration system, and the
clarified PLS is transferred
to the solvent extraction
area for processing. PLS fed
to the solvent extraction
Queque de filtracin de
espesador
The filter cake is
discharged from
the ACD filter to
the ACD filter
repulp tank in
the alkaline
leach and
residue
thickening area.
The filter cake is
residue
repulpedthickening
in the area to dissolve most of the molybdenum
values
alkalineinleach
the solids. The filtered solution from the alkaline leach
and residue thickening area is pumped to the PLS mix tank in the
solvent extraction area, where it joins the ACD thickener overflow
solution. The filter cake produced by the alkaline leach and
residue thickening area is discharged as tailings
Extractos relacionados con procesos
metalrgicos

The operation of the


Pneumapress filter occurs in
automated cycles.

Prevent entry into sewers or


streams as this product may
be harmful to aquatic life.

A physician should see all


cases other than minor
exposures to small areas of
the skin.
When the diaphragm is stroked away from the pump head, the
discharge valve is pulled closed, and the suction valve opens.