Escolar Documentos
Profissional Documentos
Cultura Documentos
2. Importance of
Heater System
Importance of Heating System
Heating System is
Laboratory inside The North Pole Chamber (Hand-rail Heat Tracing Test)
Laboratory
The North Pole Chamber Laboratory (Walk Way Heat Tracing Test)
5. ANTI ICING
Heated Walkways for
Ship
Decks
Vessel Damage Examples
4 Cable Installation
Manufacturing Procedure of Heated Walkways
Material Supply and
5
Bending, Support Hole Work
6 Insulation after
measuring Case Size
Completed products
8
(Check Plate and Sus Case
combined)
Installation Procedure of Heated Walkways
1 PAD Welding
4 Final Painting
3 Beed Work
Seatand J/B Installation
3 Move it on to the installation spot 4 After tying with Bolt Pad, lock it with Nut
Application Examples of Heated Walkway
Deck
Installation at the
lower part of deck
If installing Cable on handrail as Inside Type, the function of Anti-Icing does not
work at the temperature of 20C and at the wind speed of 5m/s.
Application Examples of Handrail Heating Equipment
(Aluminum Type)
Composition of Handrail Heating Equipment
(Aluminum Type)
1 2 3