Você está na página 1de 30

De-Icing & Anti-Icing

2. Importance of
Heater System
Importance of Heating System
Heating System is

The arctic circle, where the human


kinds accessibility has been getting
higher and higher, is the rich
repository of economic interests for
buried resources such as petroleum,
gas, etc and also for marine
transportation that leads to rapid
growing of the corresponding
businesses. Resource competition is
also fierce among major oil
companies.

Vessels running to ice-bound area


should prepare resolutions for freezing
of ship, which is not often considered
for general vessels.

It is extremely a small part, but an


essential part for crews safety and
equipment utilization. Therefore, it is
expected in the future that there
would be much more cases of applying
Heating System.
4. Laboratory
Laboratory

The North Pole Chamber


Minimum Temperature : -50M
Maximum Wind Strength : 15 m/s

NGC-30 CONTROL PANEL adjusts


temperature and situation of laboratory.
Laboratory

Hand-rail Heating Test Scene in a


Hand-rail Heating Test Scene in a state of Min. -40
state of Min. -20 Wind 10m/s

Test Scene in a state of


Min. -20 with various wind
conditions

Hand-rail Heating Test Scene in a


state of Min. -30 Wind 10m/s

Laboratory inside The North Pole Chamber (Hand-rail Heat Tracing Test)
Laboratory

H/T Walkway Test Scene in a


state of Min. -20 Wind 10m/s

H/T Walkway Test Scene on the table in a


state of Min. -20 Wind 10m/s

H/T Walkway Test Scene in a state of


Min. -30 Wind 10m/s

The North Pole Chamber Laboratory (Walk Way Heat Tracing Test)
5. ANTI ICING
Heated Walkways for
Ship
Decks
Vessel Damage Examples

Most of the exterior of the vessel is frozen after arctic voyage.

Prompt ice removal is necessary for crews safety.

Unnecessary expenditures, which are needed for manpower of crews,


equipment, removal time, etc, incurs to remove ice.
Heated Walkways for Ship Decks
Heated Walkways for Ship Decks
Manufacturing Procedure of Heated Walkways

1 Material Supply and


Bending Work

2 Welding Work of Bending and


Support, Bracket, etc

3 Painting Work(3 Coating)

4 Cable Installation
Manufacturing Procedure of Heated Walkways
Material Supply and
5
Bending, Support Hole Work

6 Insulation after
measuring Case Size

7 Insulation and Case


alignment work

Completed products
8
(Check Plate and Sus Case
combined)
Installation Procedure of Heated Walkways

1 PAD Welding

2 Stud Bolt Welding

4 Final Painting

3 Beed Work
Seatand J/B Installation

Slant Board Installation


Installation Procedure of Heated Walkways

1 Erect on the Deck 1 Apply Zig tools

3 Move it on to the installation spot 4 After tying with Bolt Pad, lock it with Nut
Application Examples of Heated Walkway

Protection Cover Application

Protection Cover Application

Protection Cover Application


Installation Procedure of Heated Walkways
The Lower Part of Heated Walkway for Ship Deck
The Lower Part of Heated Walkway for Ship Deck

Deck

Lower part of deck

Installation at the
lower part of deck

After installation at the lower part of deck


Heating Equipment for
Handrails
Vessel Damage Examples

Ice can be easily generated


by snow and wave on the
handrail which is exposed
outside.

For crews safety, it must


be eliminated primarily.
Installation of Handrail Heating Equipment (Inside Type)

Consult that Nipple and Coupling can be reflected in the prestage.


Installation of Handrail Heating Equipment (Inside Type)
Installation of Handrail Heating Equipment (Inside Type)
Vulnerability of Handrail Heating Equipment
(Inside Type)

If installing Cable on handrail as Inside Type, the function of Anti-Icing does not
work at the temperature of 20C and at the wind speed of 5m/s.
Application Examples of Handrail Heating Equipment
(Aluminum Type)
Composition of Handrail Heating Equipment
(Aluminum Type)

1 2 3