DONG-YANG

VIETNAM FACTORY
PROPOSAL CONSTRUCTION PLAN

DONG YANG VIETNAM


FACTORY
28th August 2014
5 MONTHS FAST TRACT METHOD
SEOGWOO CONSTRUCTION PROPOSAL

DONG YANG VIETNAM


fatory 3
Our History

1994 Established with the name of DONGBANG Construction Co.,Ltd. 2002 Established 100% Foreign owned
1995 Separated to SEOGWOO Engineering & Construction Co.,Ltd capital Company in Vietnam SEOGWOO Construction Co.,Ltd.
Address: 102 Chungwoo Bldg, 584 Samsung-dong, Kangnam-ku, Seoul, Address: 10th Fl., 14 Langha Str., Badinh, Hanoi, Vietnam
of Korea Tel: 84-4-3772 3860~1 Fax: 84-4-3772 3862
Tel: 82-2-344 1904 Fax: 82-2-3443 5313 Email: seogwoo@vnn.vn
Email: seogwooenc@seogwoo.co.kr homepage: http://www.seogwoo.com
homepage : http://www.seogwoo.com 2004 Established Branch in Hochiminh city, Vietnam
1999 Established Representative Office in Hanoi, Vietnam Address: G1, 29 huynh van Banh Str., ward 17, Phu nhuan Dist.
Hochiminh City
Address: Suite 405, 4th Fl., 133 Thai ha Str., hanoi, vietnam
2005 Established YS Architects & Engineering Co., Ltd. (Vietnam)
Tel.: 84-4-537 0378 Fax: 84-4-537 1434
Address: 10th Fl., 14 Lang ha Str., Badinh, Hanoi, Vietnam
Email: jsbseogwoo@fpt.vn
Tel: 84-4-3772 4213 Fax: 84-4-3772 4214
2000 Established Branch Office in Kuala Lumpur, Malaysia
Email: ysae@hn.vnn.vn
Address: No. 65-2, Jalan Thambypillai, Brickfields, 50740, Kuala
Lumpur, Malaysia homepage: http://www.seogwoo.com
Tel: 603-2260 4226 Fax: 603-2260 5226 2012 Established Branch in Yangon city, Myanmar
2001 Established Branch Office in Dubai, UAE Address: No.483, 9th Fl., Aye Yeik Thar Condo, Aye Yeik Thar (2) St.,
New University Avenue, Bahan Township, Yangon
Address: Plot B-21, Od metha, PO Box 31548, Dubai, UAE
Tel: +95.942118 1343, 942118 1344 / +95.9 43196553
Tel: 97-14-324 0482 Fax: 97-14-324 2234
E-mail: seogwoo1904@gmail.com / seogwoo1904@yahoo.co.kr

DONG YANG VIETNAM


fatory 4
CONTENTS
I. Construction overview

II. Master plan

III. Temporary work plan

IV. Construction Method Statement

V. Quality Control plan

VI. Safety & Environment management plan

VII. The List of Import Materials


DONG YANG VIETNAM
fatory 5
I. Construction overview
1. Introduction

Name of Project DONG-YANG VIETNAM FACTORY

Site location TRANG DUE IZ, AN DUONG DIS., HAI PHONG CITY., VIET NAM

Project owner DONG-YANG E&P VIETNAM


Construction
5 months
duration
Site
67,000
Area
Building
15,200
Summary Area
Gross
Floor 24,200.2
Area

Steel Structure; Roof, External, Internal wall Glass


Main Materials Factory
wool panel; Epoxy Floor,

Others Bike Shed, Fly-over Bridge, Electric House, Pump room

DONG YANG VIETNAM


fatory 6
I. Construction overview
2. Site Location

95,5
k m

TRA
NG
DUE

DONG YANG VIETNAM


fatory 7
I. Construction overview
3. Organization Chart

Project Manager

Site Manager

Administrative , Quantity Surveyor Quality Control Equipment & Safety


Contract
Section Section Material Section Section
Control Section

Construction Group 1 Construction Group 2

Main Work . Civil Work, Fence & Other


Work

CIVIL
CIVILWORK
WORK CONCRETE
CONCRETE WORK
WORK STEEL
STEEL WORK
WORK FINISH
FINISH WORK
WORK M&E
M&E
TEAM
TEAM TEAM
TEAM TEAM
TEAM TEAM
TEAM TEAM
TEAM

DONG YANG VIETNAM


fatory 8
II. Master plan
1. Manpower and Machine Mobilization Plan

DONG YANG VIETNAM


fatory 9
II. Master plan
2. Master Schedule

DONG YANG VIETNAM


fatory 10
III. Temporary work plan
1. Temporary work plan

300
Road Width

Car Washing

Water supply

Electric Panel

Temporary EGI Fence

DONG YANG VIETNAM


fatory 11
III. Temporary work plan
2. Detail Temporary Fence

DONG YANG VIETNAM


fatory 12
III. Temporary work plan
3. Detail Car washing

Before leaving the Construction site, trucks shall be cleaned using water hoses to remove soils and mud.

DONG YANG VIETNAM


fatory 13
IV. Construction Method Statement plan
1. Piling work plan
Zoning
Plan

Machine A Machine B

DONG YANG VIETNAM


fatory 14
IV. Construction Method Statement plan
1. Piling work plan
Piling Schedule

Pile Module PHTC D400

Concrete Grade M 250

Length 26 M/hole

Average Capacity 30 holes/day/machine

Total Quantity 343 holes

DONG YANG VIETNAM


fatory 15
IV. Construction Method Statement plan
1. Piling work plan
Piling work & Quality Management Plan

Robot Type

DONG YANG VIETNAM


fatory 16
IV. Construction Method Statement plan
1. Piling Work Plan
Piling loading test procedure

Pile head leveling LOADING TEST

Testing Machine Installation First


0~100% (9 hours)

Steel frame installation


100~0% (1.5 hours)

Counter weight installation


Secon
d
0~100% (2 hours)
Hydraulic jack installation

Main beam installation 100~200% (15 hours)

Dial gauge installation 200~0% (2.5 hours)

Loading test start Transfer to next pile

DONG YANG VIETNAM


fatory 17
IV. Construction Method Statement plan
1. Piling Work Plan
Piling work sequence (Robot type)

1. Install frame, hydraulic 2. Setting of bottom pile and


pressing machine and 3. Pressing of bottom pile
check verticality
concrete block for
counterweight.

4. Setting of top pile and check 5. Welding of connection with steel plate 6. Pressing of top pile
verticality

DONG YANG VIETNAM


fatory 18
IV. Construction Method Statement plan
2. Reinforced Concrete work
- After setting out, excavation works will be carried out by qualified workers with precautions

Earth work to avoid accident or near miss during the execution of the works.
- All excavated materials that are not necessary will be disposed out from the construction site

- Determine exactly location of foundation, placing lean concrete grade make leveling under footing.
Lean Concrete -Filling soil, leveling and compact by roller for each layer 200 mm thick. At narrow areas use roller to compa
-Carry out lean concrete as per design. Do other work above the lean concrete as plan

- Re-bars to be used must be of standard size and in accordance with the design and specifications.
- Rebar fabrication is required with high precision level. To meet this requirement, we use cutting and bar

Rebar work - bending machines located at workshop and other machines at site.
-Re-bars will be fabricated at site. From positioned axis, check and adjust, install re-bar for columns
-Request for inspection prior to cast concrete.

-Set up centerline and location of columns. Use module steel form combined with timber
-Formwork is put at column base, when installation, adjust and first fix formwork at column base.
Formwork
- Determine vertical direction of column by plumb, in combination with theodolite transfer center line from
bottom upwards to check. Fix column formwork by timber or steel bracing.

-Setting out of center lines. Install formworks as per approved drawing.


-Install rebar as per design and specification, check sizes, spacing, anchorage length and lap splices
Concrete work
-Request for inspection prior to cast concrete. Casting concrete if the inspection has satisfactory met the de
-Top surface of the concrete must be finished in accordance with the approved construction drawings.

DONG YANG VIETNAM


fatory 19
IV. Construction Method Statement plan
3. Steel structure work
Fabrication, transportation and Erection Plan

DONG YANG VIETNAM


fatory 20
IV. Construction Method Statement plan
4. Steel inspection plan
Q.C. The inspector or inspectors of the Local Client side Q.C. Institute

Check the thickness and steel Size (specified in the approved plans and
Inspection Standards specifications and material specifications
Unloading & Stock Check equality,
and Specifications Check mill Certificate

Considering the cutting room cutting and welding shrinkage, check whether
Cutting Marking Inspection
Check cutting steel
Cutting tests

Fitting & Tack Welding Mounting assembly OK back side of the assembly member, the length and the height and
inspection dimensional inspection, the dimensions of each member
Gajeop status, check the squareness of parts

Welding Weld Inspection Check welding materrials


Check welders
Weld inspection is a visual inspection and closing conditions including the
size
Grinding
And the pitch of the standard drilling, processing status check
Drilling tests
Drilling/2nd Welding The dimensions of the steel-making about the degree of verification and
Finished product inspection inspection of the product finish
By checking the finished product the finished product inspection standards
(dimensional inspection)

Painting & Labeling Product Seal Inspection Check seals and Labeling Products

Final Inspection Check Labeling, Packaging Compliance Check


Final Inspection Inspection records Packing List and product shipments to cross-check just before
management
DONG YANG VIETNAM
fatory 21
V. Quality Control Plan
1. Quality Control & Objective

DONG YANG VIETNAM


fatory 22
V. Quality Control Plan
1. Quality Control & Focus

1. Regular Quality Check Obtain designed quality by progress regular quality check

2. Line Stop System Quality checking by milestone, Continue the work after resolving problem

3. Q.C.P Team Checking and consorting by Q.C.P (Quality Control Part) Team

4. Check List Making quality check list step by step

5. Evaluation
Improve work ability by evaluation of Sub contractor
& Sub contractor

DONG YANG VIETNAM


fatory 23
V. Quality Control Plan
1. Quality Control/ Work Breakdown
System

DONG YANG VIETNAM


fatory 24
V. Quality Control Plan
1. Quality Control/ Work Breakdown
System Procurement Plan
Procurement Plan
- Specifications and quantities to be purchased
Purchasing
Purchasing - Purchase specifications including inspection standard,
Item
ItemList
List packaging method, delivery and handling directions

- Time material needed at the site.


Purchasing
Purchasing - Time ordered and manufacturing time needed.
Schedule
Scheduleand
and - Time for the preparation of the contract.
Delivery
DeliveryDate
Date - Time needed for installation and inspection of material.

- Qualification criteria
Qualifications
Qualifications - Terms and conditions
of
of - Purchasing procedures
Manufacturer
Manufacturer// - Purchasing conditions : cash or Local L/C
Supplier
Supplier - Delivery conditions : delivery to site, loading at factory,
unloading at site

Site Quality control Cycle Source


Source selection
selection

Price
Pricemay
maybebethe
theprimary
primarydeterminant
determinantfor
foran
anoff-the-shelf
off-the-shelfitem,
item,but
butthe
thelowest
lowest
proposed
proposedprice
pricemaymaynot
notbe
bethe
thelowest
lowestcost
costififthe
theseller
sellerproves
provesunable
unabletotodeliver
deliver
the
theproduct
productininaatimely
timelymanner.
manner.

- Proposals are often separated into technical (approach) and commercial (price)
sections with each evaluated separately.
- Multiple sources may be required for critical product. The tools and the
techniques described below may be used singly or in combination.
- Select a single source who will be asked to sign a standard contract.
- Rank order all proposals to establish a negotiating sequence.

On major procurement items, this process may be iterated. A short list of


qualified sellers will be selected based on a preliminary proposal, and then a
more detailed evaluation will be conducted based on a more detailed and
comprehensive proposal.

DONG YANG VIETNAM Quality control Planning


fatory 25
V. Quality Control Plan
2. Construction Factory & Office pictures

Soil excavation Surveying Test

Structure foundation Steel Structure

DONG YANG VIETNAM


fatory 26
V. Quality Control Plan
2. Construction Factory & Office pictures

Steel Structure Finishing slab ground Installation roof with EPS


sandwich panel

Installation external panel wall Installation internal panel wall, ceiling Finishing

DONG YANG VIETNAM


fatory 27
V. Quality Control Plan
3. Construction Fence Picture

Fabrication steel fence Masonry wall brick fence

Installation steel fence Finishing fence

DONG YANG VIETNAM


fatory 28
V. Quality Control Plan
4. Construction Road & Drainage System Picture

Excavation road Construction Drainage System

DONG YANG VIETNAM


fatory 29
VI. Safety & Environment Management Plan
1. Safety Plan

Objective
Objective Organization
Organization

Objective Safety Education


Safety management Beginner Education

Safety fist Worker Safety Education

Construction Safety Safety Inspection


Organization Regular Inspection

No Injury
project

Safety Management
Safety Working
Environment Site total safety management
system
No Injury
Resume Control
Remove Risk Factors
Incident management system
Construction Safety Culture

DONG YANG VIETNAM


fatory 30
VI. Safety & Environment Management Plan
1. Safety Plan

Improve the work method and work plan to meet the actual
conditions by repeating the
Cycle of PLAN DO CHECK IMPROVE

DONG YANG VIETNAM


fatory 31
VI. Safety & Environment Management Plan
(3) Coordination with related trades
1. Safety Plan and related contractors

WORK
METHOD

Things the foreman


should do

Protective gloves

Wear a protective mask safety goggles


Safety shoes

Always wear the directed protective devices:

-Secure your own safety during work

DONG YANG VIETNAM


fatory 32
VI. Safety & Environment Management Plan
1. Safety Plan

Be careful not to turn over


Maintain a
clearance of
2m or more

Whistle

Guide

Be careful when swinging a load to the side.


Do not leave the operators seat while a load is suspended .
Never try to life a load which is too big

Oh! It
will turn
over !

DONG YANG VIETNAM


fatory 33
VI. Safety & Environment Management Plan
1. Safety Plan
Do not move an electrical appliance by
pulling on the electrical cord
CAUTION !! Protective
High Voltage sheath
Line Overhead

SIGHT

OK!
Close
the Check
switch carefully

DANGER
DO NOT ENTER

DANGER MEN
WORKING

DONG YANG E&P


VIETNAM 34
VI. Safety & Environment Management Plan
2. Emergency Communication Network

Head Office
043.3787.7510 The Owner
Emergency Police
113

An Duong Hospital
An Duong,
Fire Brigade
Hai Phong
114
031.3871.539
Construction Site
Office
Water Management Agency
An Duong Police 031.3871.589
Station
031.3871.670

Accident/Incident Emergency Case


Power Management Agency
031.2251.002

DONG YANG E&P


VIETNAM 35
VII. The List of Import Materials

DONG YANG E&P


VIETNAM 36
THANK YOU!!