VIETNAM FACTORY
PROPOSAL CONSTRUCTION PLAN
1994 Established with the name of DONGBANG Construction Co.,Ltd. 2002 Established 100% Foreign owned
1995 Separated to SEOGWOO Engineering & Construction Co.,Ltd capital Company in Vietnam SEOGWOO Construction Co.,Ltd.
Address: 102 Chungwoo Bldg, 584 Samsung-dong, Kangnam-ku, Seoul, Address: 10th Fl., 14 Langha Str., Badinh, Hanoi, Vietnam
of Korea Tel: 84-4-3772 3860~1 Fax: 84-4-3772 3862
Tel: 82-2-344 1904 Fax: 82-2-3443 5313 Email: seogwoo@vnn.vn
Email: seogwooenc@seogwoo.co.kr homepage: http://www.seogwoo.com
homepage : http://www.seogwoo.com 2004 Established Branch in Hochiminh city, Vietnam
1999 Established Representative Office in Hanoi, Vietnam Address: G1, 29 huynh van Banh Str., ward 17, Phu nhuan Dist.
Hochiminh City
Address: Suite 405, 4th Fl., 133 Thai ha Str., hanoi, vietnam
2005 Established YS Architects & Engineering Co., Ltd. (Vietnam)
Tel.: 84-4-537 0378 Fax: 84-4-537 1434
Address: 10th Fl., 14 Lang ha Str., Badinh, Hanoi, Vietnam
Email: jsbseogwoo@fpt.vn
Tel: 84-4-3772 4213 Fax: 84-4-3772 4214
2000 Established Branch Office in Kuala Lumpur, Malaysia
Email: ysae@hn.vnn.vn
Address: No. 65-2, Jalan Thambypillai, Brickfields, 50740, Kuala
Lumpur, Malaysia homepage: http://www.seogwoo.com
Tel: 603-2260 4226 Fax: 603-2260 5226 2012 Established Branch in Yangon city, Myanmar
2001 Established Branch Office in Dubai, UAE Address: No.483, 9th Fl., Aye Yeik Thar Condo, Aye Yeik Thar (2) St.,
New University Avenue, Bahan Township, Yangon
Address: Plot B-21, Od metha, PO Box 31548, Dubai, UAE
Tel: +95.942118 1343, 942118 1344 / +95.9 43196553
Tel: 97-14-324 0482 Fax: 97-14-324 2234
E-mail: seogwoo1904@gmail.com / seogwoo1904@yahoo.co.kr
Site location TRANG DUE IZ, AN DUONG DIS., HAI PHONG CITY., VIET NAM
95,5
k m
TRA
NG
DUE
Project Manager
Site Manager
CIVIL
CIVILWORK
WORK CONCRETE
CONCRETE WORK
WORK STEEL
STEEL WORK
WORK FINISH
FINISH WORK
WORK M&E
M&E
TEAM
TEAM TEAM
TEAM TEAM
TEAM TEAM
TEAM TEAM
TEAM
300
Road Width
Car Washing
Water supply
Electric Panel
Before leaving the Construction site, trucks shall be cleaned using water hoses to remove soils and mud.
Machine A Machine B
Length 26 M/hole
Robot Type
4. Setting of top pile and check 5. Welding of connection with steel plate 6. Pressing of top pile
verticality
Earth work to avoid accident or near miss during the execution of the works.
- All excavated materials that are not necessary will be disposed out from the construction site
- Determine exactly location of foundation, placing lean concrete grade make leveling under footing.
Lean Concrete -Filling soil, leveling and compact by roller for each layer 200 mm thick. At narrow areas use roller to compa
-Carry out lean concrete as per design. Do other work above the lean concrete as plan
- Re-bars to be used must be of standard size and in accordance with the design and specifications.
- Rebar fabrication is required with high precision level. To meet this requirement, we use cutting and bar
Rebar work - bending machines located at workshop and other machines at site.
-Re-bars will be fabricated at site. From positioned axis, check and adjust, install re-bar for columns
-Request for inspection prior to cast concrete.
-Set up centerline and location of columns. Use module steel form combined with timber
-Formwork is put at column base, when installation, adjust and first fix formwork at column base.
Formwork
- Determine vertical direction of column by plumb, in combination with theodolite transfer center line from
bottom upwards to check. Fix column formwork by timber or steel bracing.
Check the thickness and steel Size (specified in the approved plans and
Inspection Standards specifications and material specifications
Unloading & Stock Check equality,
and Specifications Check mill Certificate
Considering the cutting room cutting and welding shrinkage, check whether
Cutting Marking Inspection
Check cutting steel
Cutting tests
Fitting & Tack Welding Mounting assembly OK back side of the assembly member, the length and the height and
inspection dimensional inspection, the dimensions of each member
Gajeop status, check the squareness of parts
Painting & Labeling Product Seal Inspection Check seals and Labeling Products
1. Regular Quality Check Obtain designed quality by progress regular quality check
2. Line Stop System Quality checking by milestone, Continue the work after resolving problem
3. Q.C.P Team Checking and consorting by Q.C.P (Quality Control Part) Team
5. Evaluation
Improve work ability by evaluation of Sub contractor
& Sub contractor
- Qualification criteria
Qualifications
Qualifications - Terms and conditions
of
of - Purchasing procedures
Manufacturer
Manufacturer// - Purchasing conditions : cash or Local L/C
Supplier
Supplier - Delivery conditions : delivery to site, loading at factory,
unloading at site
Price
Pricemay
maybebethe
theprimary
primarydeterminant
determinantfor
foran
anoff-the-shelf
off-the-shelfitem,
item,but
butthe
thelowest
lowest
proposed
proposedprice
pricemaymaynot
notbe
bethe
thelowest
lowestcost
costififthe
theseller
sellerproves
provesunable
unabletotodeliver
deliver
the
theproduct
productininaatimely
timelymanner.
manner.
- Proposals are often separated into technical (approach) and commercial (price)
sections with each evaluated separately.
- Multiple sources may be required for critical product. The tools and the
techniques described below may be used singly or in combination.
- Select a single source who will be asked to sign a standard contract.
- Rank order all proposals to establish a negotiating sequence.
Installation external panel wall Installation internal panel wall, ceiling Finishing
Objective
Objective Organization
Organization
No Injury
project
Safety Management
Safety Working
Environment Site total safety management
system
No Injury
Resume Control
Remove Risk Factors
Incident management system
Construction Safety Culture
Improve the work method and work plan to meet the actual
conditions by repeating the
Cycle of PLAN DO CHECK IMPROVE
WORK
METHOD
Protective gloves
Whistle
Guide
Oh! It
will turn
over !
SIGHT
OK!
Close
the Check
switch carefully
DANGER
DO NOT ENTER
DANGER MEN
WORKING
Head Office
043.3787.7510 The Owner
Emergency Police
113
An Duong Hospital
An Duong,
Fire Brigade
Hai Phong
114
031.3871.539
Construction Site
Office
Water Management Agency
An Duong Police 031.3871.589
Station
031.3871.670
wWW.SEOGWOO.COM