Você está na página 1de 23

Presentation of

Energy Conservation
in
Govt. Buildings
of
Maharashtra State.
Energy Saving

Energy Saved is Energy Generated.


Saving of Energy is the need of the day.
Government is one of the major consumer of
Energy.
The Govt. has to lead others by taking
effective steps to save the energy
Energy Saving

278 million units of energy per annum are


consumed by Maharashtra State Government
Office Buildings
This is equal to 105 MW Generation during
working hours under the assumption of 10
hours /day, 22 days /month, 12 months /year.
One unit saved is TWO units generated.
Annually Rs.111 crores are spent by the
Government on energy bill .
Energy Saving

Energy Efficient Lamps and Equipments can


save energy bill up to 30 %.
100/60/40 watts bulbs can be replaced by
CFL lamps of 22/11/9 watts having power
factor more than 0.9.
40/36W Fluo. fittings can be replaced by
28W E+/T5 fluo. fittings or their chokes
by electronic chokes.
Four pillars of successful
Energy Management
Four pillars of successful
Energy Management : Key
Elements
Successful energy management programme needs the total
support of senior management.

The other important requirements are


A well-charted strategy plan.

An effective monitoring system.

Adequate technical ability for analyzing and implementing energy


saving options.

In any organization, which does not already possess an energy


efficient ethics, good communication downwards from senior
officials will be vital first step.

Active participation & planning for the energy management


Ways of Energy

Conservation
Awareness
Replacement of conventional fittings with E+ fluo. fittings
Replacement of conventional pumps with submersible
pumps/energy efficient pumps
Replacement of old water coolers with energy efficient
water coolers
Replacement of GLS lamps with CFL lamps
Incorporating timers for passage lights
Incorporating digi guards for ACs
Incorporating DPSD for compound & street lights
Ways of Energy
Conservation
Replacement of electric water heaters with solar water

heaters
Replacement of water coolers with heat pumps
Replacement of resistance type regulators with electronic
regulators
Replacement of conventional chokes with electronic chokes
Incorporating VFDs for hydro pneumatic systems, pumps &
central AC plants
Incorporating 3VF drives for lifts
Smart Card (SIM) based Power Controller
Energy Saving at Vidhan
Bhavan
Sr.
No
Year Use of fitting /
Equipment
Nos. Capital
cost
Date
of
Saving Simple
in bill paybac
. (Rs. commi k
(Rs.
Lacs) s- period
Lacs)
ioning (yrs)
1 2001- VFD for water pump 6 8.17 12/01 2.97 2.8
02 Nos.
2 2001- Power factor 350 13.8 12/01 5.49 2.5
02 correction capacitor KVAR
panel
3 2001- E+ 28 W tube fitting 1493 12.02 2/02 5.37 2.2
02 in place of 40 W
fitting
4 2001- Using reflector for 1493 3.22 2/02 1.79 1.8
02 4 X 2 X 20 W

An expenditure of Rs. 40.43 lacs has accrued


5 2001- New reflector with 1493
saving
3.22
of Rs.2/02
17.41 lacs per annum.
1.79 1.8
02 one tube in place of
Energy Saving at Mantralaya
Sr. Year Equipment Quantit Cost of Units Saving Simple
No. Used y installatio save in pay back
(Nos.) n d energy Years-
Rs.Lakhs bill Months
Rs(Lakh
s)
1 2001- Capacitor 180 3.66 2.67
02 panel KVAR 10 months
2 2002- 120 3.47 4.28
03 KVAR
3 2002- E+fluo. 1238 10.78 7293 3.65 2 -11
03 Tubes 3
4 2003- E+fluo. 2705 21.77 1593 7.97 2-8
04 Tubes 57
5 2003- Capacitor 50 - 1.58
04 panel KVAR
6 expenditure
An 2004- E+fluo.
of 3572
Rs. 79.05 lacs accrued 27.77 2032
saving of Rs. 10.16
36.45 lacs in four 2 -8
05 Tubes 46
years ( 5% increase in load).
Energy Efficient Equipments used
in New Govt. Building works
E+
during 2001-2005
Electro
Electronic
CFLStreet
Solar
Solar
Solar
Name of CFL Lamp (Nos.) nic DPSD (Nos.) Light
Sr. No . Fitting Regulator (Nos.) Street water
Circle choke
(Nos.) (Nos.) Light heate
9 Watt 11 Watt 2x11W 1x18 W 2x26W (Nos.) 125W 250W 11W 18W r
1 Mumbai 10436 269 1003 350 48 1128 1353 123 535 20 0 10 0 2

2 Pune 3127 0 1410 0 641 0 150 233 0 63 526 123 0 0

3 Aurangabad 1397 0 598 0 255 0 43 62 169 0 46 0 6 2

4 Nagpur 2310 0 331 526 16 262 52 52 30 2 264 0 0 0

Total 17270 269 3342 876 960 1390 1598 470 734 85 836 133 6 4

By this Demand Side, 822 KW is saved.


Saving by Awareness in J.J. Hospital Units 0.8 MU & Amount Rs. 38.53
Lakhs in three years
Saving by use of VFD in New Administrative Building -- Unit 30,000/year &
Amount Rs.1.5 Lakhs/ year
Energy Saving Proposals
submitted to Govt. for 35 bldgs.
Sr. Category Present Replaceme Capital Energy Paybac
No. attracting EC Act 2001 nt
(Quantity)
Cost
(Rs.
bill
saving /
k
period
lacs) year (yrs)
(Rs.
lacs)
1. Fluo. fitting Conventional E+(28W) 469.06 399.16 1.2
40W (53303
(76023 Nos.) Nos.)
2. Passage Conventional CFL 11 W 2.84 7.98 0.4
Lights: 40W fluo. (1896 Nos.)
fitting (1896
Nos.)
3. Water Conventional Submersibl 18.3 13.97 1.3
Pumps (61 Nos.) e
(61 Nos.)
4. Passage Without Timer With Timer 0.3 0.76 0.5
Lights: (144 Nos.) (144 Nos.)
Energy Saving Proposals
submitted to Govt. for 35 bldgs.
Sr. Category
No attracting EC Act 2001
Present Replaceme
nt
Capital
Cost
Energy
bill
Paybac
k
. (Rs. saving / period
lacs) year (yrs)
(Rs.
lacs)
6. AC units Without With 19.94 12.76 1.6
Digiguard Digiguard
(539 Nos.) (539 Nos.)
7. Compound & Without With DPSD 17.19 9.88 1.74
Flood Lights DPSD (614 Nos.)
(614 Nos.)
8. Water Heating Electric Solar 480 75.23 6.4
System (1145 Nos.) (167 Nos.)
9. Water Cooling Water Heat 90 32.39 2.7
Coolers Pumps
(425 Nos.) (9 Nos.)
Energy Saving Proposals
submitted to Govt. for 35 bldgs.
Sr. Category
No.
attracting EC Act 2001
Present Replaceme
nt
Capital
Cost
Energy
bill
Paybac
k
(Rs. saving / period
lacs) year (yrs)
(Rs.
lacs)
11. Water Pumps Without VFD With VFD 202.18 41.26 5
(41 Nos.) (41 Nos.)
12. Lifts Without 3VF With 3VF 48.94 13.84 3.5
drive drive
(19Nos.) (19Nos.)
13. Ceiling Fan Resistive Electronic 12.08 12 1
Regulators (6716 Nos.) (6716 Nos.)
Energy Saving Proposals
submitted to Govt. for 35 bldgs.
Sr. attracting EC Act 2001
Present Replace by
Capital Cost for
replacement (Rs.
Saving in
energy Bill Pay back
No. every year Period
Lacs)
(Rs. Lacs)
Heat water Pump for
Water coolers (328
14
Nos.)
Chilled water/ A.C. (151 261.76 51.6 5
Nos.)
Water coolers & L. Hot & chilled water heat
15 P. G. at New pump system ( 20.4 7.32 2.8
Council Hall 6 Nos.)
Centralised Air
Split AC Units
16 condition units
( 73 Nos)
36.54 37.49 1
(6 Nos.)
60/ 80W ceiling Energy Efficient ceiling
17
fans ( 1728 Nos.) Fans ( 1728 Nos.)
16.03 13.32 1.2

Total :: 1723.12 763.19 2.26

An expenditure of Rs.1723.12 lacs can save 17.09


Millions Energy units per annum & accrues saving of Rs.
ENERGY SAVING PROPOSAL OF OTHER GOVT. BUILDINGS (Rs. in Crores)
Solar Water
E+ fittings CFL Fittings Grand Total
Heaters
Sr.
Department Energy Saving
no. Qty Capital Qty Capital Qty Capital Capital
per year
(Nos) Cost (Nos) Cost (Ltrs) Cost Cost
(million units)
1 Home (Police) 35057 3.09 7386 0.11 0 0.00 3.20 3.01
2 Home (Jail) 7415 0.65 1653 0.02 0 0.00 0.67 0.64
3 Law & Judiciary 32288 2.84 5521 0.08 0 0.00 2.92 2.7
4 Education 46199 4.07 8907 0.13 0 0.00 4.20 3.92
5 Social Welfare 9342 0.82 2807 0.04 0 0.00 0.86 0.85
6 Revenue 34907 3.07 7496 0.11 0 0.00 3.18 3
Public Works (Non-
7 34938 3.07 12772 0.19 287750 5.80 3.26 6.52
Resi)
8 Pblic Works (Resi) 6084 0.54 1288 0.02 0 0.00 0.56 0.52
9 Other Administrative. 16759 1.47 2146 0.03 0 0.00 1.50 1.36
10 Labour Dept. 92 0.01 16 0.00 0 0.00 0.01 0.01
11 Vidhan Bhavan 855 0.08 134 0.00 0 0.00 0.08 0.07
12 Public Health 63638 5.60 11385 0.17 0 0.00 5.77 5.35
13 Finance 3974 0.35 826 0.01 0 0.00 0.36 0.34
14 Animal Husbandry 3245 0.29 638 0.01 0 0.00 0.30 0.28
15 Fisheries 861 0.08 334 0.01 0 0.00 0.09 0.08
16 Tech. Education 337 0.03 53 0.00 0 0.00 0.03 0.03
17 Dairy Deptt. 425 0.04 209 0.00 0 0.00 0.04 0.04
296416 26.10 63571 0.93 287750 5.80 27.03 28.72

An expenditure of Rs. 27.03 crores accrues saving of Rs. 12.92 crores per annum & 28.72 million units .
ENERGY SAVING PROPOSAL OF OTHER GOVT. BUILDINGS (Rs. in Crores)
Solar Street Solar Water
E+ fittings CFL Fittings Grand Total
Light Fittings Heaters
Sr.
Department Energy Saving
no. Qty Capital Qty Capital Qty Capital Qty Capital Capital
per year
(Nos) Cost (Nos) Cost (Nos) Cost (Ltrs) Cost Cost
(million units)
1 Home (Police) 35057 3.09 7386 0.11 4424 10.35 0 0.00 13.55 4.15
2 Home (Jail) 7415 0.65 1653 0.02 776 1.82 0 0.00 2.49 0.84
3 Law & Judiciary 32288 2.84 5521 0.08 1952 4.57 0 0.00 7.49 3.2
4 Education 46199 4.07 8907 0.13 2992 7.00 0 0.00 11.20 4.69
5 Social Welfare 9342 0.82 2807 0.04 1590 3.72 0 0.00 4.58 1.26
6 Revenue 34907 3.07 7496 0.11 2937 6.87 0 0.00 10.05 3.76
Public Works (Non-
7 34938 3.07 12772 0.19 3942 9.22 287750 5.80 18.28 7.54
Resi)
8 Public Works (Non-Resi) 6084 0.54 1288 0.02 1118 2.62 0 0.00 3.18 0.81
9 Other Administrative. 16759 1.47 2146 0.03 477 1.12 0 0.00 2.62 1.48
10 Labour Dept. 92 0.01 16 0.00 0 0.00 0 0.00 0.01 0.01
11 Vidhan Bhavan 855 0.08 134 0.00 72 0.17 0 0.00 0.25 0.09
12 Public Health 63638 5.60 11385 0.17 3822 8.94 0 0.00 14.71 6.33
13 Finance 3974 0.35 826 0.01 470 1.10 0 0.00 1.46 0.46
14 Animal Husbundary 3245 0.29 638 0.01 513 1.20 0 0.00 1.50 0.41
15 Fisheries 861 0.08 334 0.01 195 0.46 0 0.00 0.55 0.13
16 Tech. Education 337 0.03 53 0.00 35 0.08 0 0.00 0.11 0.04
17 Dairy Deptt. 425 0.04 209 0.00 203 0.48 0 0.00 0.52 0.1
296416 26.10 63571 0.93 25518 59.72 287750 5.80 92.55 35.3

An expenditure of Rs. 92.55 crores accrues saving of Rs. 15.89 crores per annum & 35.3 million units .
Energy Saving in Important
Govt.Bldgs : 2004-2005 (Rs. In
Consumption in
Saving Energy Bill Energy Saving
Lacs)
Name of the units
Building
2003-04 2004-05 (units) % 2003-04 2004-05 Rs. %

Mantralaya 4037085 3959960 77125 1.91% 260.58 229.94 30.64 11.76%

Navin Vidhan
1325600 1225000 100600 7.59% 90.27 74.04 16.23 17.98%
Bhavan
Mumbai High
681996 675855 6141 0.90% 46.87 41.27 5.6 11.95%
Court

Manora 2346520 2294500 52020 2.22% 159.59 157.17 2.42 1.52%

J J Hospital 1570770 1561000 9770 0.62% 60.62 52.47 8.15 13.44%

Total 9961971 9716315 245656 2.47% 617.93 554.89 63.04 10.20%


Energy Saving of Electrical
Wing Offices of PWD
Annual Energy Saving of Electrical Wing

Sr. Month & units Differnce


Month & Year Units
No. Year Consumed
Units Percentage
1 2 3 5 6 8 9
1 Mar-04 22125 Mar-05 17063 5062 22.88

2 Apr-04 19691 Apr-05 16726 2965 15.06

3 May-04 24379 May-05 20770 3609 14.80

4 Jun-04 21280 Jun-05 16221 5059 23.77


BOT Pilot Projects of PWD
Bldgs
MLA Hostel, Nagpur
Ravi Bhavan, Nagpur
Golf Club, Nashik (Circuit House)
Inspection Bunglow, Pune
Subhedari Rest House, Aurangabad
BOT Pilot Projects of PWD
Bldgs : Abstract (Rs. In Lacs) LPD E+ CFL Expected
Sr. No. of Capital Payback
Name of the Building Capacity Fittings Fittings Net IRR
No. Suits Cost Period
(Ltrs) (Nos.) (Nos.) Saving

1 M.L.A. Hostel, Nagpur 386 39000 1158 1644 70.71 17.23 7 YRS 15.46%

2 Ravi Bhavan, Nagpur 128 6600 340 130 14.4 3.47 7 YRS 15.08%

3 Golf Club, Nashik 51 4700 58 139 9.66 2.37 7 YRS 15.69%

Subhedari Rest House,


4 45 4500 177 256 12.43 2.62 8 YRS 14.01%
Aurangabad

5 Inspection Bunglow, Pune 56 8400 200 0 15.31 4.56 5 YRS 14.93%

Total 666 58700 1933 2169 122.51 30.25


Similar Proposals for BOT
can be implemented for other
departments after their
assurance to share the saving
with the BOT operator.
One Unit of Energy saved is
equivalent to Two Units of Energy
Generated.

Thank You