Você está na página 1de 17

Schlumberger WELL

ACTIVITIES

Schlumberger Private
Schlumberger Activities slide 1
Schlumberger WELL
ACTIVITIES

The little man pictured here will

Schlumberger Private
help you understand where the
business begins and ends

Schlumberger Activities slide 2


Schlumberger WELL
ACTIVITIES
1 SEISM
IC

Schlumberger Private
Schlumberger Activities slide 3
Schlumberger WELL
ACTIVITIES
1 SEISM
IC
The generation of acoustic waves that
travel into the earth and reflect back to

Schlumberger Private
the surface to be recorded by sensors
and interpreted by computers.
This provides a subterranean picture of
a possible resource.

Schlumberger Activities slide 4


Schlumberger WELL
ACTIVITIES
2 CONSTRUCTION
DRILLING & WELL

Schlumberger Private
Schlumberger Activities slide 5
Schlumberger WELL
ACTIVITIES
2 CONSTRUCTION
DRILLING & WELL
The use of a rig and crew for the
drilling, suspension, completion,

Schlumberger Private
production testing, capping,
deepending, plugging back,
sidetracking, redrilling or reconditioning
of a well.

Schlumberger Activities slide 6


Schlumberger WELL
ACTIVITIES
3 LOGGING
WELL

Schlumberger Private
Schlumberger Activities slide 7
Schlumberger WELL
ACTIVITIES
3 LOGGING
WELL
The measurement of one or more
physical quantities in or around a well.

Schlumberger Private
The term comes from the word log used
in the sense of a record or a note.
Wireline logs are taken downhole,
transmitted through a wireline to surface
and recorded there.

Schlumberger Activities slide 8


Schlumberger WELL
ACTIVITIES
4 TESTING
WELL

Schlumberger Private
Schlumberger Activities slide 9
Schlumberger WELL
ACTIVITIES
4 TESTING
WELL
Well Testing involves providing access to
and measurement of dynamic reservoir

Schlumberger Private
data
-including pressure, temperature, flow rate
and fluid properties
-while the well is either flowing or shut in.

Schlumberger Activities slide 10


Schlumberger WELL
ACTIVITIES
5 COMPLETION
WELL

Schlumberger Private
Schlumberger Activities slide 11
Schlumberger WELL
ACTIVITIES
5 COMPLETION
WELL
The work done on a wellbore to establish
safe production of the resource or

Schlumberger Private
injection of fluids after the production
casing string has been set, cemented and
pressure tested.
This work includes running the pipe and
jewelry, perforating, setting packers,
tubing hangers and Christmas trees in
place.
Schlumberger Activities slide 12
Schlumberger WELL
ACTIVITIES
6 LIFT
ARTIFICIAL

Schlumberger Private
Schlumberger Activities slide 13
Schlumberger WELL
ACTIVITIES
6 LIFT
ARTIFICIAL
Systems that are placed in the wellbore
to lift fluids because the reservoir lacks

Schlumberger Private
the energy to cause the natural flow of
fluid to surface, such as gas lift or
electrical submersible pumps.

Schlumberger Activities slide 14


Schlumberger WELL
ACTIVITIES
7 PRODUCTIVITY
PRODUCTION &

Schlumberger Private
Schlumberger Activities slide 15
Schlumberger WELL
ACTIVITIES
7 PRODUCTIVITY
PRODUCTION &
Production is the stage in the reservoir
life during which hydrocarbons are

Schlumberger Private
brought from the reservoir through the
completion and surface facilities to be
sold.
Productivity is the measure of a well
completions ability to produce, expressed
in volume of gross liquid produced per day
per unit of differential pressure between
the static reservoir pressure & the wells
flowing bottomhole pressure (drawdown).
Schlumberger Activities slide 16
Schlumberger WELL
ACTIVITIES

Schlumberger Private
The END