Você está na página 1de 9

Secondary Primary Member

Member H16 H16/H20


Timber @ Defined Timber / Steel
c/c Spacing Beam /Steel
Waler
Four Way Head
is used to support CT12Props
or 19 mm Thk.
The Slab is
the Primary availablePlywood
in 4 as
Sheathing
Sizes 250, Member
Member
ready to be
cast 300, 340, 410
Tripod is !
only for
alignment
purpose
FLEX SYSTEM COMPONENTS

FOUR- WAY HEAD

UNIT WEIGHT H 16 3.48 KG


H20 4.23 KG

TRIPOD

CT PROP (SINGLE NUT)


UNIT WEIGHT 12.33 KG
FLEX SYSTEM COMPONENTS H-16 TIMBER BEAM, H-20 TIMBER BEAM

SUPPORTING HEAD UNIT WEIGHT 5 KG /


RMT

Supporting Components

UNIT WEIGHT H 16 1.14 KG


H20 1.24KG LENGTH 1.2 M, 1.8M, 2.4M,
or can use Plywood
3.0M, 3.6M
FLOOR FORM

300 * 600, 300 * 900, 300 * 1200


BEAM FORMING HEAD
600 * 900, 600 * 1200
Supporting Components
UNIT WEIGHT 6.29 KG
SALIENT FEATURES
Reduction in consumption of timber.
Making work at site minimised.
PLYWOOD
Dimensionally stable and uniform in size.
Consistent in strength.
Economical and long - lasting.

TIMBER

H- BEAMS
CONNECTIONS BETWEEN ELEMENTS

Use tripods only where the


H-beams are lapping or at the
end.
All the legs of the tripods to
rest on firm ground.
Props to rest on the ground
firmly.
Ensure sufficient lap of H-
beam in both primary &
secondary layer.
Ensure the right spacing of
H-beam & Props.

DOS & DONTS - FLEX SYSTEM


DETAILS OF CT-PROPS
Used for supporting and
plumbing of wall formwork
and column formwork

COLLAPSIBLE
TUBE PROPS
FOR
ALIGNMENT
DESIGN CHART
TABLE - F5 ALLOWABLE LOAD ON FLOOR PROPS (IN KN)

DOS & DONTS - FLEX SYSTEM


RE-PROPPING STRIP IN POSITION APPROX.
AT THE CENTRE OF THE SPAN.

PROPS PLACED BELOW


THE RE-PROPPING
STRIP.

RE-PROPPING
STRIP
ALONGWITH
PROPS AT THE
CONSTRUCTION
SITE.