Escolar Documentos
Profissional Documentos
Cultura Documentos
0. Revision History
1. Scope
Product in Charge
Common 2. Purpose
RAC Only 3. Terminology
SAC Only
4. Authority and Responsibility
5. Inspection Item
6. Detailed Inspection Manual
H&A Company / QM FD
LG Electronics Internal Use Only Issue : 12 Dec 2014
Part Inspection lnstruction - EEV Revise : 26 Dec 2014 2 / 10
LG(67)-G3-1028 Revision # : 1
0. Revision History
Rev. # Rev. Date Pages Revised Contents Charge Department
1 26 Dec 2014 All Change of standard name/control number Iksoo Jang Production
- Part inspection manual Part inspection quality audit
instruction team
1 - AE-IQC-001 LG(67)-G3-1001
3 Description of Product in
Charge(Common)
5~10 Addition of Standard items
- Scope, Purpose, Terminology,
Authority and Responsibility
Addition of detailed inspection
method
LG Electronics Internal Use Only Issue : 12 Dec 2014
Part Inspection lnstruction - EEV Revise : 26 Dec 2014 3 / 10
LG(67)-G3-1028 Revision # : 1
1. Scope
This instruction is applied to the incoming inspection and assurance test for the parts of Air-conditioner, H&A company.
2. Purpose
The purpose of this instruction is to standardize inspection items and conditions, judgment criteria of incoming part, and
acquire the identical quality level through the documentization of detailed inspection method.
3. Terminology
1) Incoming inspection
The inspection which is done for every part incoming lot
2) Assurance test
Considering to the actual using condition and accelerated life, the test for assuring detail performance of parts by the
specific period
5. Inspection Item
No. Category Inspection Item Inspection Method Judgment Criteria Etc.
Structure/
1 Incoming Check rust/dent No rust/dent
Appearance
1) Structure/Appearance Inspection
Inspection Method
- Check the crack, breakage of visual area.
Judgment Criteria
- No rust and dent.
Test Facility
- Naked eye
Specification Check
2) Specification Check
Inspection Method
- Check the specification compare with drawing.
Judgment Criteria
- The used parts should be same with drawing/approval sheet.
- No misusing or missing of parts.
Test Facility
- Naked eye
LG Electronics Internal Use Only Issue : 12 Dec 2014
Part Inspection lnstruction - EEV Revise : 26 Dec 2014 6 / 10
LG(67)-G3-1028 Revision # : 1
3) Dimension Check
Checking points
Inspection Method
- Measure the dimension of pre-defined points with vernier
calipers.
- Major checking points : height(a), length(b), Pipe Flow In
diameter(c)
Judgment Criteria c
- The result should satisfy the spec of drawing. b
a
Test Facility
- Vernier calipers, etc.
Flow Out
c
LG Electronics Internal Use Only Issue : 12 Dec 2014
Part Inspection lnstruction - EEV Revise : 26 Dec 2014 7 / 10
LG(67)-G3-1028 Revision # : 1
4) Fuction check
Inspection Method
- Put the air pressure which is defined in approval sheet(Ex. 1.5MPa) to the input side of the specimen, and sound
absorber to the outside.
- Connect EEV wire to the controller and supply open/close signal to check if it works correctly.
Judgment Criteria
- Should operate corresponding to the open/close signal
Test Facility
- controller
Controller
Flow Input
Flow Output
Sound
absorber
LG Electronics Internal Use Only Issue : 12 Dec 2014
Part Inspection lnstruction - EEV Revise : 26 Dec 2014 8 / 10
LG(67)-G3-1028 Revision # : 1
Inspection Method
- Put the air pressure which is defined in approval sheet(Ex. 1.5MPa) to the input side of the specimen, and sound
absorber to the outside.
- Connect EEV Wire to the controller, and set up test condition defined on approval sheet.
Ex) With rated voltage DC 12V and velocity of 83pps, iterate 100,000times from 0 to 500pulse
- After test, check sealing/inner leakage/flow rate.
a) Checking sealing characteristic : Supply the pre-defined pressure of the approval sheet(Ex. 4.2MPa ) to the
input section, and dip into the water for 1 minute to check air leakage.
b) Checking inner leakage : Supply the pre-defined pressure of the approval sheet to the input section, and to the
another side, connect hose and dip it into water to gather the leaked air.
c) Flow rate : Connect flowmeter to the end, then give the defined pressure to the opposite side.
Judgment Criteria
Flow rate Graph (Example)
- No damage or break
- Should satisfy below condition; Flow rate(L/min)
a) No outer leakage when sealing check 120
b) Should meet spec when inner leakage (Ex. 600ml/min)
8316.6
c) Flow rate should satisfy spec.(Ex. refer to the graph)
- Open/close
Test
Controller
Input Pressure
Flow Output
Sound
absorber
- Sealing Test
(Outer leakage) Input pressure
LG Electronics Internal Use Only Issue : 12 Dec 2014
Part Inspection lnstruction - EEV Revise : 26 Dec 2014 10 / 10
LG(67)-G3-1028 Revision # : 1
- Sealing Test
(Inner leakage)
Input Pressure
Input Pressure
Flowmeter