BIM Architecture

Zulhusni

Parcel F

Precinct 1 , Putrajaya

Design and Build Contract

Putrajaya Holdings

34 months September 2015- July 2018

10 blocks of government office building


BIM Architecture
Zulhusni
BIM Architecture
Zulhusni

BIM Department

Manager
Civil and Structural

Trade Package Trade in


BIM
Master Coordinator Architecture

BIM Mechanical, Electrical,


Engineer Plumbing
BIM Architecture
Zulhusni

Building Information Modelling (BIM)

2D Height and
Width

3D - Depth
Automated
Analysis
4D - Time
Early identification
of discrepancies
5D Cost

Save cost & effort


6D Information
BIM Architecture
Zulhusni

Architecture Team

Arc Model F8L1

Modeler Zulhusni
BIM Architecture
Zulhusni

Model Quality Checks (QC Model)


BIM Architecture
Zulhusni

Modeling New Models

Basic concepts for Summary for Modelling


Modelling in Parcel F 1. See all the 2D drawings based for the assigned Architecture firm.
1. We model floor by 2. lay 2D CAD drawing to Ravit software, example lay the plan drawing to know
floor and divided into the brick wall setting out
6 categories. And after 3. Link the CNS model to put all finishes assigned based on the CN LT drawing
all done we combine 4. Check the Toilet detail drawing to medal all generic model and elevation of the
all together floor by pipes, toilet accessories etc
floor and all this type 5. Lay the( RCP) reflected ceiling plan drawing to design the ceiling and to know
of Ravit model to form the exact elevation of the ceiling.
the completed building 6. Lay the staircase detail drawing to know the correct raiser and finishes assigned
in 2D drawing.
7. Lay also the podium detail drawing to check all requirement meet based on 2D
drawing

All of this were model


based on the 2D
Drawing
BIM Architecture
Zulhusni

A360
BIM Architecture
Zulhusni

Modeling New Models

Lay CAD drawing


(Layout Drawing) 3D Model Created
BIM Architecture
Zulhusni

Modeling New Models

13 model I completed in march


and beginning of April
BIM Architecture
Zulhusni

Arc Model F8 L1

Models
Example

Arc Model F2 L5

Arc Model F8 L5

Arc Model F6 L5
BIM Architecture
Zulhusni

Modeling New Models

Interference Raise RFI when


QC
Check necessary

Status
Produce
Clash change to Technical Operation
Shop
Analysis Construction Team Team
Drawing
Drawing
BIM Architecture
Zulhusni

Purpose for using BIM

20+ skilled
manpower

Virtual pre-
construction and
analysis
Integration of
services and
coordination works

Production Line
Design Revision

Model Model Clash


Design C3D Construction
Creation Update Analysis
BIM Engineer
BIM Architecture
Zulhusni

Another Advantages for using BIM

High volumes of
reference materials

Complexity in
Coordination

Extensive Human
Labour

Difficulty in
identifying faults
Late in
identification
BIM Architecture
Zulhusni

Productivity ( Muhammad Zulhusni Bin Che Razali)

The data shows from 20


February to 11 April 2017
BIM Architecture
Zulhusni

Productivity
BIM Architecture
Zulhusni

ESH (Environment safety and Health)

Safety Weeks and


campaign

Signage

Toolbox Gathering
Everyday 7.30 am for
Operation Team
BIM Architecture
Zulhusni

Knowledge Sharing

AAC Brick Wall

Tandom Slab AAC Brick Wall


Advantages
BIM Architecture
Zulhusni

Thank You Mrs Nurul Hani Binti Mardi for your time


Dont forget the
Safety hardness if we
need to go to the
Site

Any questions?