Você está na página 1de 10

NETKOM Technologies (Pvt) Ltd.

House # 582 St# 28 G 10/2 Islamabad


VISION
Netkom aims to become a premier construction
company in Pakistan & a prime driving force
behind the civil technology revolution in
Pakistan, Acting as the key catalyst for change
in business processes and delivery of quality
solutions
Health, Safety and Environment
Quality of life is governed by concerns for health, safety and environment of our
employees, our clients and our society. Netkom considers these to be of utmost
importance in its entire works.

The company ensures that all employees adhere to safety measures and
practices. Appropriate gear and tools are used to ensure the safety of employees
working in all areas.

All engineering design particularly of towers caters to the safety aspect of all
future users. These include proper railings, rest platforms, ladder supports,
lightning protection, earthing / grounding, aircraft warning lights, etc.

All debris from construction sites is disposed off in a proper manner so as not to
damage the environment in any way.

Any metal parts that are unused or made unusable are then recycled through
proper scrap dealers.

We hope that our small efforts will have some impact in educating the masses for
a cleaner and healthier environment
NETKOM Services
Tower Construction, Installation, maintenance & Monitoring.
Institutional, Commercial, Education and other building construction.

CONSTRUCTION:
Netkom is geared to provide services right from the project conception through investigation, data
processing, project preparation, economic and financial analysis for feasibility studies, details design,
contract and tender documentation, bid evaluation, construction management, assistant to client in
the selection and procurement of services, monitoring and evaluation.

PROJECT OPERATIONS:

Netkom normally operates its construction projects from head office. Netkom is operating in all major
cities of North central and south regions of the country this is the expertise of the company to
operate in various cities by using diversified and scientific tools of management and construction.
SCOPE OF WORK OF CONSTRUCTION
TOWER CONSTRUCTION
Tower Foundation
Tower Erection
BTS Pads and Rooms
Gen set Pads
Tower Painting
Rooftop steel fabrication,
Tower Earthing (Grounding)
Erection, Edge
Tower wiring
All civil works related to Tower
Boundary wall with main gate
Shelter Installation & ODU Shed
Electrification
Site Acquisition
Power (WAPDA) Connections
Project details
Project Year
CMPAK 2014 Project 2014/2015
CMPak BSS 844 sites SWAP Project 2012
CMPak BSS 844 sites SWAP Project 2011
CMPak KHI Swap project 2013
CMPAK Phase 4 project 2012/2013
CMPak underground battery project 2011/2012
Mobilink BCD Hybrid MSTP Project 2012
Mobilink Managed Services Project 2013/2015
Mobilink MEGA SWAP Project 2013/2014
Mobilink MOTO BSS Swap Phase-V Project 2011/2012
PAF IP PABX Project 2014
Pakistan PTCL Maintenance Project 2013
PTCL 3.5G TDD 2015 Project 2016
PTCL CDMA 100 BTS Sites Project( Phase-
III) 2014
PTCL EVDO EXPANSION PROJECT 2010
PTCL LTE project 2013
PTML Ufone Project Phase 11A 2012/2013
Ufone 2G Modernization 2015 Project 2016
Ufone 3G 402 Sites 2015 Project 2015/2016
Ufone 3G 523 Sites 2015 Project 2016
Ufone 3G Rollout Project 2014/2015
Ufone Phase 10A Project 2012
Ufone Phase 10B,11A Project 2012
AREA OF EXPERTISE

Pakistan
Dubai
Oman
STAFF & FIELD TEAM
Construction Manager
Sub Engineer (Civil Work)
Sub Engineer (Mechanical Work)
Sub Engineer (Electrical Work)
Surveyor
Generator Operator
Watch Man
Supervisors
Forman
Carpenters
Steel Fixers
Masons
Labors
Fabricators
Erection Teams
Electricians
EQUIPMENT LIST
S. # Items Qty
1 Concrete Mix Machine (singe load) 01
2 Concrete Mix Machine (half load) 01
3 Material Hosting Lift 100 feet height 01
4 Steel Shuttering Plates (different sizes) 1000Sf
5 Wooden batten & props Sufficient
6 Telescopic leveling instruments 02
Concrete emulsion vibrator petrol engine 04 set
7 driven
8 Wooden planks for working plate form 100 nos.
9 Lightening Generator 2 Set
Centrifugal pump different size 2 nos.
10 (dewatering set)
11 Earth compactor 02 Set
12 Hydraulic jack 5 Ton capacity 01
13 Small tools and plants for field Sufficient
FABRICATION AND ERICTION WORKS

Sr. Items Qty


No.
1 Generator set for field work 02
2 Welding transformer 01 Sets
3 Electrical Hand Grinder (different sizes) 03 Sets
4 Vibrator heavy duty 06 Sets
5 General electric drill machine upto 02 Set
7 Electric bench drill machine 01 Set
8 Hilti machine 02 No

Você também pode gostar