CUBE TEST TO DETERMINE THE COMPRESSIVE STRENGTH OF

CONCRETE:
The cubes were tested at 7 days. The cubes were removed from the curing tank,
dried and grit removed. Tested using a calibrated compression machine.

Tested on the face perpendicular to the casting face. The compression machine
exerts a constant progressing force on the cubes till they fail, the rate of loading is
0.6 0.2 M/Pas (N/mm/s). The reading at failure is the maximum compressive
strength of the concrete.
STEEL BAR - 8MM DIAMETER
STEEL BAR - 10MM DIAMETER
STEEL BAR - 12MM DIAMETER
STEEL BAR - 16MM DIAMETER
STEEL BAR - 20MM DIAMETER
TIME ANALYSIS FOR VARIOUS ACTIVITIES

01-07-2011 3 months

Excavation, P.C.C. & R.C.C.


footings

2 months

Plinth beams, raft & basement


complete, R.C.C columns upto
1st slab
2 months

3 months 1 month
Ground floor brick/ block work
including fixing of door frames
and windows 1st slab(Including conduit for Basement floor brick/ block
electrical work) work

2 months 1 month
1 month
Basement & Ground floor - Architectural projections &
Cols upto 2nd slab
Internal plaster elevations(R.C.C.) complete

2 months 3 months 2 months

First floor brick/ block work 2nd slab(Including conduit for Basement Floor R.C.C.
including fixing of door frames electrical work) Retaining wall (Including box
and windows waterproofing)
1 month 2 months 1 month

First floor - Internal plaster Second floor brick/ block work Architectural projections &
including fixing of door frames elevations(R.C.C.) complete
and windows

2 months 1 month 1 month

External plaster - Complete Second floor - Internal plaster Concealed Plumbing - Internal

1.5 months 2.2 months 25 days

Basement & ground floor Plumbing complete Waterproofing to toilets


Tiling complete

1.8 months 2.5 months 1.5 months

First and second floor Tiling Electrical complete (Excluding Doors shutter & window glass
including toilets Pipe work) fixing complete including
painting and polishing
28 days

Internal Painting complete

2.6 months 1.3 months 1.5 months

External site work i.e. paving External painting complete Any other balance work
U.G. tank etc complete complete, upto final finish
ANALYSIS:
Time estimated by the project manager- 2 years 8 months
Actual completion time- 3 years 2 months
Hence, 6 months lag after the completion of the first floor slab, in the construction time due to unavailability of
funds.