Agenda
HSE Vision
PERTAMINA 1
NOI = 0
HSE Vision:
Proper = Biru
To achieve no harm TRIR = 0.95
to people, asset or environment
Initiative HSE
Kehandalan Improvement
Performance
Leadership
Reliability PSM (CSMS,
Initiative Organization capability Safe Work
Mgmt. Practice :
HSE culture Release
Equipment
Procedure,MOC,
Pengawasan & Training, Pelaksanaan Emergency
Intervensi Upskilling & Drill Program SIIP Response,
langsung melalui pada pekerja Industrial
SWAT/Sweeping, (Compliance APD, Hygiene)
HSE, Operasi,
SIKA, SWAT,
Safety TBKD dan Mitra SML
Committee Frontline Motivation & (Rekomendasi
Kerja / Kontraktor
Meeting secara Management Proper Mgmt.)
terprogram Consequences, JSI,
Near miss report)) Rekomendasi
Risk Survey
Audit Mgmt.
SUMBER: HSE RU VI PERTAMINA
Agenda
HSE Vision
PERTAMINA 3
PROGRAM MKP
TEKNOLOGI
1. Informasi Keselamatan Proses (Process Safety Information)
2. Analisa Bahaya Proses (Process Hazard Analysis)
3. Keterpaduan Mekanik (Mechanical Integrity)
4. Review Keselamatan Pra Start-Up (Pre Start Up Safety Review)
KESELAMATAN KERJA
5. Keselamatan Kerja Kontraktor (Contractor Safety)
6. Izin Kerja Aman (Safe Work Practices / Hot Work Permit)
7. Prosedur Operasi (Operating Procedures)
8. Pelatihan Pekerja (Training)
9. Partisipasi Pekerja (Employee Participation)
MANAJEMEN
10. Manajemen Perubahan (Management of Change)
11. Penanggulangan Keadaan Darurat (Emergency Response)
12. Kesehatan Lingkungan Kerja (Industrial Hygiene)
13. Penyelidikan Kejadian (Incident Investigation)
14. Audit Manajemen Keselamatan Proses (Auditing)
4
PIE CHART
Analisa bahaya
Proses Izin Kerja Aman
Prosedur Operasi
Keterpaduan Mekanik
Pelatihan Pekerja
RKPSU
Partisipasi Pekerja
Manajemen Perubahan
Penanggulangan Keadaan Darurat
Penyelidikan Kejadian
Audit
5
CSMS Implementation
Tahap Tahap
Bank
Administrasi Implementasi
Data
Feedback
Pra Qualification Work in Progress
PERTAMINA
Agenda
HSE Vision
PERTAMINA 7
HSE Monitoring & Readiness
Plant Patrol HSE Man - Shift 2 kali per Shift Minimize unsafe act
& unsafe condition
Inspeksi HSE
SWAT Mgmt. & Sec. Head 1 kali per Minggu/Mg APD & SIKA
Join Superv. Insp. Safety Insp,HSE 2 kali per Bulan/Area Process Safety
CO,GSI & ME Area
Nearmiss reporting Individu 7 laporan per Process Safety
orang/tahun
HSE Committee
Mgmt. 1 kali Per Bulan HSSE High Issue
PERTAMINA
8
SAFETY WORK PLAN 2011
Safety Improvement Implementation Program
Compliance & Melaksanakan observasi & Intervensi SIKA LEAD & HSE CO
serta porsentase SIKA close
Audit SIKA
Bulan K3 Nasional
Agenda RU VI dan Surat dari Depnaker TEAM & PANITIA
HSE Vision
10
Lesson Learnt From HSE TA Management
For Each Job, Hazards and Mitigating Actions Were Identified
Prior to TA execution During TA execution
JSA Safety
Risk ass- PPE reqt Contractor Routine Pre-startup
Critical Contractor inspector Equipment
essment identific- safety safety Safety
equipment selection outsourc- Release
on job list ation training activities Review
review ing
Job list compiled in Apr Re-screen job list using Criteria Filter Equipment base on Consequence and
2009 by TA Team* Identify Hazard, Assess Risk, Increasing likelihood
Control and Recovery
Environment
company at location location in
Reputation
in company
People
Assets
company
Identify Hazard Assess Risk
No Injury or No damage No Effect No Impact
0 health effect 0 0 0 0 0
Number of equipment being hazard identified : 166 Number of Critical Equipment based on HEMP : 5
HEMP is a structured and systematic analysis methodology involving the Identification, Assessment and Control of hazards and the Recovery
from effects caused by a release of the hazards. All four components are essential for proper hazard management
Select criticality Select Criticality Equipment analyze by HEMP method ( Hazard Effect Management Process )
equipment
Break the job down a sequence of task and record each task no more than ten sequence of task
Deploy step of
work Identification Hazard Consequence resulting from :
Incident, accident and potential emergency situation
Identification Past, current and planned activities
hazard Situation in production process or in the provision af a service
consequences Planned and reactive work
Specific tasks
Preventive Preventive Action by elimination of hazard, engineering and Administrative control and PPE
action
Approval and Approval and communicate the Job Safety Analysis to employees who will be performing the job
Communicate
Item to be assess
Risk
assessment
NO MAIN ITEM DESCRIPTION
Final
evaluation
Recommen
2 General & Specific PPE Pertamina hanya Hanya perusahaan List Contractor TA dari
provided by Contractor mengontrol spesifikasi tertentu yang masuk Unit lain
APD kualifikasi
3 General & Specific PPE PPE yang digunakan Biaya pengadaan PPE Penyiapan Budget
provided by Pertamina RU sesuai spesifikasi menjadi besar dan Prosedur peminjaman
VI Balongan Setelah TA dan perawatan
memerlukan Tempat penyimpanan
perawatan dan tempat
penyimpanan PPE.
Toolbox checks
MPS Reliability Eng & Dev confined space attendance
Printed
Printed
ME Production Workshop Catalyst handling Proof of
Elmizar
HSE Procurement Others workshop MA3
attendance
Role in TA :
completed
Security audit
here
2 TA Brick Proof of workshop attendance Togar M
Area :
on site
Overview TA Mgr
Passport checks to be
Printed 3/12/2010 3:30:02 PM
8-step TA Mgr
HSE Procurement Others Process
Passed assessment with score
SWAT audits
Wor ki ng Draft - Last Modified 3/28/2010 3:15:35 PM
ME Production Workshop
HSE Procurement Others
Role in TA :
Coordinator
Supervisor
Foremen/Operator
Contractor Supervisor
Contractor Worker part of SWAT audit
McKinsey & Company | 2
McKinsey & Company | 1
Departments Procedure
involved available Dari lesson learn equipment release sebelumnya masih ada
celah yang menyebabkan terjadinya kecelakaan karena belum
adanya kejelasan proses serah terima equipment. Oleh
Equipment Production karena itu perlu dibuat prosedur equipment release yang
cool down terdiri dari item-item sebagai berikut :
Production,
Blind System 2. Mitigasi Tindakan yang telah Prod/PE
ME, HSE dilakukan untuk
mengeliminir risk
Production, Blm
Equipment ME, HSE, 3. Blind system Isolasi Prod/HSE/MA
ada
Release PE equipment/system
PERTAMINA
SUMBER: HSE RU VI TA Team
Routine safety activities during TA execution will focus on continuous inspection and supervision of
work
23
PERTAMINA
LATIHAN PERENCANAAN SESUAI POAC ( Plan Organisasi Action
Control )
Contoh :
1. Persiapan administrasi
1. Pengosongan isi tanki ke tanki slop dilihat dari aspek SIKA.