Reciprocating Chillers…
Centrifugal Chillers…
Screw Chillers…
Rotary Chillers…
Scroll Chillers…
Air cooled Chillers…Few facts
High maintenance.
More moving parts….so more wear.
High level of noise and vibrations.
High energy requirements by bigger capacity chillers.
Not suitable for more than 200 T loads because of large space
requirements and higher first cost.
Centrifugal Chiller…….Single
Compressor….
Centrifugal Chiller – Dual
Compressor…
Centrifugal Chillers – Few General
points....
These are variable Volume displacement units…
One or more impellers are used …
Centrifugal force is used to compress the refrigerant vapor…
Cooling capacity is controlled through the use of inlet vanes on
the impeller that restricts refrigerant flow…
From 90 – 1000 Tons capacity…
Both Hermitically sealed and open construction type available…
Again hermitically sealed is more common…
Centrifugal Chillers – Few
Advantages...
Low energy cost per Ton of cooling…
Small size, for the same cooling capacity, compared to
reciprocating chillers…
Not much of vibrations…
VFD`s can be used to reduce the speed and in turn to save the
energy…
Centrifugal Chillers – Few
Disadvantages...
Bad part load efficiency…
Can not go below 20% of its full capacity…
Full load consumption – 0.6 KW/Ton & at 20% load its around
0.9 KW/ton…
Surging at part loads……leads to chiller damage…
Screw Chiller….A Picture
Screw Chillers – Few General
points...
Positive displacement like reciprocating chiller…
Two machined rotors that compresses refrigerant gas between
their Screws as they mesh…
Both Hermitically sealed as well as Open construction
available…
From 20 – 2000 tons…
Approx power consumption 0.7 to 0.8 KW/Ton… Sometimes
better than this…
More efficiency than reciprocating but less than Centrifugal…
Screw Chillers – Few Advantages...
Light weight…
Less space requirement…
Less number of moving part….so less maintenance required…
Quieter….Vibration free…
Screw Chillers – Few
Disadvantages...
High initial cost…
For some capacities more power consuming…
Scroll Chiller…A Picture
Scroll Chiller…Concept
Scroll Chiller…Few General Points
Capacity requirement…
Space requirement…
Electricity or alternate fuel…
Diversity…
Application….Low noise, vibrations….
A/C Systems : General Formulae
Tons = GPM x T
24
GPM = Tons x 24
T
Note : 1 Gpm = 0.0631 l/s.
A/C Systems : General Formulae
Example 1:
If the chiller is sized at 500 tons, T is 10 F, what is the flow
required?
Solution.
Cooling surface
(coil)
Chilled air
Flow pipe
Return pipe
Air filter
Warm air
Control of Fan coil
2 way valve control means 3 way valve control means
variable flow in the main supply net constant flow in the main supply net
Temperature Temperature
Control sensor Control sensor
panel panel
M
AB A
Main Main B
M
supply supply
Can we do anything ??
Rules of Thumb
Rules …
Of Thumb…
Grand Total
Building Area Use Sq Ft Btuh/Sq Ft Total Btuh
Office area 15000 sq.m 161474 50 8073720.8
Restaurant 1200 sq.m 12918 85 1098026
Dept store 7000 sq.m main floor 75355 50 3767736.4
Dept Store 14000 sq.m basement 150709 45 6781925.4
Total 37200 sq.m 400457 19721409
So what ??
Do you have a loading profile ??
25
20
% Time
15
10
0
0-10 30-40 60-70 90-100
% Load
air air
Water back to
the condenser
WhatRules Of Thumb…
is the condenser pump flow rate