OPERATION

1.Preparation for start


2.Start auxiliary equipment
3.Turbine start
4.Synchronizing
5.Load up
6.Normal stop
7.Stop auxiliary equipment
8.Emergency stop
Starting condition

Condition Steam press. & Casing temp. Idling time


temp
Cold start T≦150℃ 30min

Warm start 150℃<T≦200℃ 10min


8MPaG/390℃

Hot start 200℃<T 2min

This temperature value will be decided at commissioning period.


Sealing press.
control

TCP

Middle
No load
loadand
Internal
low load
steam
leaking is increased.
TURBINE CONTROL

• Speed control
• Auto power control
• Inlet pressure control
• Max. load limit control

Auto power control and Inlet pressure control


can not use same time.
Speed control by 505 Governor

Speed range : Min. 5239rpm / Max. 6011rpm


PID setting
Off-line : Tie breaker ⇒ Open
On-line : Tie breaker ⇒Close
Speed rate : 3rpm/s
Critical band speed rate : 25rpm/s (1700~3000rpm)
Auto power control by PLC and GT1030

Differential value = Actual power – Auto power setpoint

Differential value

Control output
(Fast rate)
Slow rate upper setting : 150kW
Control output
(Slow rate)
Dead band upper setting :50kW
Dead band
0kW
(No output)
Dead band lower setting : -50kW
Control output
(Slow rate)
Slow rate lower setting : -150kW
Control output
(Fast rate)

time
Inching timer setpoint
Fast rate : ON 0.5s / OFF 5S (app. 40kW/s)
Slow rate : ON 0.5s / OFF 10s (app. 20kW/s)
(225kW/pulse)
Inlet pressure control by 505 Governor

Actuator demand
Inlet press.
Actuator demand

Inlet press.

Inlet setting press. Dead band


Initial setting : 1.0MPaG ±0.1kPa

time
Max. load limit control by 505 Governor

• STG can not take load more than


this setting value.
• Priority is higher than Inlet press.
Control or Auto power control.
• Initial setting : 33.05MW
TRIP AND ALARM
OVERSPEED TRIP
Overspeed trip detector Setting value
Mechanical 6342±63rpm
505 Governor 6342±63rpm
PROTECH G2 6287±63rpm

PROTECH G2 : 2 out of 3 trip system