Common quality issue

 Grounding System
 Power System
 Equipment Installation
 Cable routed
 Labeling
 EPMS
 Site cleaning
 Others
1. Grounding System
Issue 001
7th Feb, 2017

1.1 Grounding bar is installed wrong direction. New grounding bar must be install vertically
along tower legs.
1. Grounding System
Issue 001
7th Feb, 2017

1.2 No grounding cable connect from new The size of Grounding cable for new grounding
grounding bar to existing grounding system. bar must be ≥ 35 mm² and. Proper bracket are
required for new grounding bar.
Used cable clamp to fixed grounding bar.
1. Grounding System
Issue 001
7th Feb, 2017

1.3 Bracket for grounding bar hasn’t match Proper bracket are required for new grounding
with tower type bar.
1. Grounding System
Issue 001
7th Feb, 2017

1.4 Grounding cable for RRU are combined one It must be connect by separate bolts.
bolt.
1. Grounding System
Issue 001
7th Feb, 2017

1.5 Grounding cable size for new grounding The size of grounding cable for new
bar is not as requirement. grounding bar must be ≥ 35 mm².
1. Grounding System
Issue 001
7th Feb, 2017

1.6 No grease for all grounding bolts Grease must be apply after all bolts and
nuts are tighten
1. Grounding System
Issue 001
7th Feb, 2017

1.7 Grounding bolts at the grounding bar is too All grounding bolts should be the same type
long
1. Grounding System
Issue 001
Alarming Bell 7th Feb, 2017

1.8 Grounding cable for RRU power cable, IF cable is upward

Wrong: Grounding cable for RRU power cable and IF cable Right: All grounding cable must be downward follow RRU power
is opposite with cable routing before feeder window. cable and IF power cable.

Cáp tiếp đất cho cáp nguồn RRU và cáp IF đi ngược chiều Tất cả các cáp tiếp đất cho cáp nguồn RRU và cáp IF phải có
với đường đi của cáp trước khi vào cửa sổ feeder. chiều hướng xuống và đi theo chiều cáp nguồn RRU và cáp IF.
1. Grounding System
Issue 001
Alarming Bell 7th Feb, 2017

Right: All grounding cable must be downward follow RRU power


1.8 Grounding cable for RRU power cable, cable and IF power cable.
IF cable is upward
Tất cả các cáp tiếp đất cho cáp nguồn RRU và cáp IF phải có
chiều hướng xuống và đi theo chiều cáp nguồn RRU và cáp IF.
1. Grounding System
Issue 001
7th Feb, 2017

1.9 No grounding cable for new cable tray. New cable tray must be grounded and have grounding
And no grounding cable link between jumper link between new cable tray segment.
two cable tray segment.
1. Grounding System
Issue 001
7th Feb, 2017

1.10 Grounding bolts are loose at the All grounding bolts must be tighten properly
grounding bar and IF lighting arrester.
1. Grounding System
Issue 001
7th Feb, 2017

1.11 No heat shrink tube for grounding cable


lug
1. Grounding System
Issue 001
7th Feb, 2017

1.12 No grounding cable for DCDP6, BBU, LPU All grounding bolts must be installed completely
1. Grounding System
Issue 001
7th Feb, 2017

1.13 Used cable clamp to fix new grounding cable All grounding cables must be connected to below grounding
lug to the existing flat steel on the tower bar. Don’t allow connected to tower member .
1. Grounding System
Issue 001
7th Feb, 2017

1.14 Grounding cable should be the same Grounding cable should be the same
direction at the indoor grounding bar direction and binding neatly.
2.Power System
Issue 001
7th Feb, 2017

2.1 “N” pole of AC power cable connected to All power cable must be used cable lugs at
wrong Circuit Breaker the CB.
2.Power System
Issue 001
7th Feb, 2017

2.2 The size of new Circuit Breaker are New CB should be the same size with
different with other. existing CB
2.Power System
Issue 001
7th Feb, 2017

2.3 No cable lugs for AC/DC power cable at the All power cable must be used cable lugs at
CB. the CB.

Please noted that all the power/grounding connection must be tighten


before power on.
2.Power System
Issue 001
7th Feb, 2017

Customer requested to use cable conduit for AC


2.4 AC power cable was routed on the power cable and install on the floor/beam/wall. Don’t
cable tray. allow to install on the cable tray.
And cable conduit must be grounded.
2.Power System
Issue 001
7th Feb, 2017

2.5 No heat shrink tube for power cable End of cable peeling must be cover by heat
shrink tube properly.

10-15 cm

Heat shrink
tube

Cable
shoes
2.Power System
Issue 001
7th Feb, 2017

2.6 No cable terminal for IDU power cable All IDU power cable lugs must be installed by
at DCDP6 proper crimping tools.
2.Power System
Issue 001
7th Feb, 2017

2.7 No grease for batteries bolts and nuts After all batteries connection are tighten grease
are request to apply for the bolts and nuts.
2.Power System
Issue 001
7th Feb, 2017

2.8 No short circuit bar for AC Circuit


Breaker in W201 rack
2.Power System
Issue 001
7th Feb, 2017

2.9 Wrong polarization of RRU power cable,


wrong clamping position of optic cable.

1. The color of RRU


power cable must
be correctly.

2. The clamp
position must be
on cover point.
2.Power System
Issue 001
7th Feb, 2017

2.10 Used cable lug is not match with cable size Cable lugs must be follow cable size.
and no heat shrink tube.
3. Equipment Installation
Issue 001
7th Feb, 2017

3.1 The cabinet position hasn’t installed as per TSSR. If at the site have any change it
must be get the confirmation from VNM
3. Equipment Installation
Issue 001
7th Feb, 2017

3.2 The cabinet is not vertical. The cabinet/rack must be install vertically
3. Equipment Installation
Issue 001
7th Feb, 2017

3.3 Expansion bolts haven’t installed All expansion bolts must be installed firmly and
firmly properly
3. Equipment Installation
Issue 001
7th Feb, 2017

3.4 Surface of cabinet is scratched, Be sure that all equipments and material are
distorted safe during uploading, transportation,
unpacking.
3. Equipment Installation
Issue 001
7th Feb, 2017

3.5 One bolts are missing for fixing DDF All indoor unit must be installed accordingly
on the rack the TSSR and firmly on the rack with four
bolts.
3. Equipment Installation
Issue 001
7th Feb, 2017

3.6 The cable binding bracket are not installed/ not installed firmly
3. Equipment Installation
Issue 001
7th Feb, 2017

3.7 Only one feed of power cable for IDU Supply power cable for IDU must be 2
power sources
3. Equipment Installation
Issue 001
7th Feb, 2017

3.8 Two source of IDU power have connected Grounding cable for IDU must be
to only one DCDP6 installed as the connection diagram
3. Equipment Installation
Issue 001
7th Feb, 2017

3.9 No cable tie at the both ends of waterproof Grounding cable for IDU must be
tape for power cable and IF cable installed as the connection diagram
3. Equipment Installation
Issue 001
7th Feb, 2017

3.10 Used lighter for heat shrink tube Must be use electric heat gun for heat
installation shrink tube installation.
4. Cable routed
Issue 001
7th Feb, 2017

4.1 RRU power cable, fiber optical, IF cable are not The cable routed must be installed on the
installed on the vertical cable ladder side of tower. vertical cable ladder as the same with existing
cable.
4. Cable routed
Issue 001
7th Feb, 2017

4.2 Wrong: RRU power cables are twisting Right: All RRU power cable and fiber
cable must be separated by cable clamp.
Các cáp nguồn cho RRU xoắn vào nhau And it must be routed neatly.
Tất cả các sợi cáp nguồn RRU, cáp quang
phải được đi riêng rẽ bằng kẹp cáp. Và
chúng phải được đi gọn gàng.
4. Cable routed
Issue 001
7th Feb, 2017

4.3 The spare of IF cable and Fiber must be


bound neatly under horizontal cable tray.
4. Cable routed
Issue 001
7th Feb, 2017

4.4 No waterproof curved for cable before entering Must be make the waterproof curved for cable
the cabinet/feeder window. The curve of cable is before entering cabinet/feeder window. Don’t
too sharp. make the curve too sharp.

>= 18cm
4. Cable routed
Issue 001
7th Feb, 2017

4.5 No protection tube for the cable under Must be make the waterproof curved for cable
the cabinet. before entering cabinet/feeder window. Don’t
make the curve too sharp.

>= 18cm
4. Cable routed
Issue 001
7th Feb, 2017

4.6 Power cable, Fiber, IF cable, Grounding All the cable must be routed and binding
cable are not binding, fly in the air on properly even temporary installation at
the top of tower. the swap site.
4. Cable routed
Issue 001
7th Feb, 2017

4.7 Cable tie for IF cable is not fixing as “X” For IF cable fixing on cable ladder, cable
word style tie should fix as “X” word style.
4. Cable routed
Issue 001
7th Feb, 2017

4.8 Cables in the cabinet/rack are not binding All the cable must be binding neatly in the
nearly cabinet
4. Cable routed
Issue 001
7th Feb, 2017

4.9 Cables in the cabinet/rack are not binding All the cable must be binding neatly in the
nearly cabinet even temporary installation at the
swap site.
4. Cable routed
Issue 001
7th Feb, 2017

4.10 IF lighting arrester are not binding neatly IF cable should be binding neatly link by
link to avoid
4. Cable routed
Issue 001
7th Feb, 2017

4.11 No protection for grounding cable. And Grounding cable hasn’t fixed
properly on the beam/equipment pad.
4. Cable routed
Issue 001
7th Feb, 2017

4.12 No cable clamp for power cable and Must be use cable clamp for RRU power
fiber on the cable ladder near the cabinet cable and fiber on the cable ladder near the
cabinet.
5. Labeling
Issue 001
7th Feb, 2017

5.1 No printed label for all cable and equipment in Only printed label are acceptable
the cabinet. Hand writing label only acceptable
for temporary labeling
5. Labeling
Issue 001
7th Feb, 2017

5.2 Label for ODU is not match with ODU Labeling must be attached correct
function. equipments and cables
5. Labeling
Issue 001
7th Feb, 2017

5.3 Plastic label is wrong ANT1-TX/RX-1 color ring, ANT2 (for RRU 8861) /ANT4 (for
RRU 8862A)-2 color rings/ ANT1-TX/RX-1 vòng màu, ANT2
direction. “S” word must be
(đối với RRU 8861) /ANT4 (đối với RRU 8862A)-2 vòng màu
near the connector Plastic label will be near the connector, then color rings/
Nhãn nhựa sẽ nằm gần connector hơn vòng màu.
6. EPMS
Issue 001
7th Feb, 2017

6.1 Subcon’s engineers don’t upload 6.2 Subcon’s engineers don’t


photo to EPMS as per actual site sign in/out as per requirement.
progress

Please noted that


team leader is
kindly
requested to
sign in when he
comes to site
and sign out
when he leaves.
When sign in/
sign out, site
info must be
attached.
6. EPMS
Issue 001
7th Feb, 2017

6.3 Subcon take photo from phone to laptop Must be take real photo onsite as
screen. Strictly forbid faking photo. Any per site situation
partner who submits fake photo will receive
penalty letter immediately .
7. Site cleaning
Issue 001
7th Feb, 2017

7.1 Site is not cleaning. A lot of rubbish Site must be clean, all of rubbish must be
and cotton boxes are present at site. take far away from the site.
8. Other
Issue 001
7th Feb, 2017

8.1 No maintenance ladder for Maintenance ladder must be provided and


cabinet installed properly.
8. Other
Issue 001
7th Feb, 2017

8.2 Lack of bolts and flat washer, spring Maintenance ladder must be provided and
washer for bolts at cabinet support installed properly.
base.
8. Other
Issue 001
7th Feb, 2017

8.3 Bolt is not tighten. No U bolt and V All bolts and nuts must be tighten
steel bar for new cable tray for fixing
to the tower body.
8. Other
Issue 001
7th Feb, 2017

8.4 Cable hole and cable inlet/outlet of All hole must be sealed after cable
cabinet are not sealed. installation finished
8. Other
Issue 001
7th Feb, 2017

8.9 Smoke at Site is STRICTLY prohibited.


Do it right at the first time

Thank you!