Improve productivity
System implementation
IV. Ensure that new style in-house for back to back feeding.
Out Come:
As SMV will help to do an in-depth of the total
operation include in the product it will help work out
best C&M price to offer customer
SMV will help maximize the usage of man & machine witch
ultimate help reduce cost & increase profit.
Current Situation:
Started but still no standardization.
Out Come:
Can identify each & every processes.
Can identify skill requirements.
Identify machine & attachments requirements.
Identify critical & Special process.
Current Situation:
Functioning have to do 100% regularly.
Why need:
Identify company capacity.
Identify company required capacity.
To submit information to Top Management.
Out Come:
Achieve delivery every time in ONTIME without
violation compliance, using existing manpower & resources
Current Situation:
Have to implement.
Out come:
Able to introduce out put achievement plan from
starting date.
Current Situation:
Have to implement.
Aruna Perera 2/28/2018
Discuss Operation Breakdown &
Layout with Production Staff
Why need:
Take Production Staff better ideas about lay out.
Take approval for Process wise target & Manpower Allocation.
Pre decision Manpower allocation & Utilization.
Out Come:
In-order to avoid Delays doing experiments in the style
feeding time.
Current Situation:
Have to implement.
Why need:
To identify machine & attachment shortage according to
availability
Out Come:
Minimize to machinery & attachment shortage
Current Situation:
Functioning not regularly practice.
Production Stage.
Capacity Studies.
Out Come:
Optimum man, machine, material, money & machine will be practice
Systematic production process will be in practice to meet prod. goal
Current Situation:
Have to implement.
Why need:
Identify workers skill.
Identify workers capability.
Identify bottle neck operations.
Out Come:
For Re-Balancing the line.
For Re-adjust the individual target & give solution for
bottle neck operations.
Current Situation:
Have to implement.
Aruna Perera 2/28/2018
12
Work Place Arrangement
Why need:
To achieve expected target comfortably.
Reduce unnecessary motion.
Reduce through put time.
Maximum utilization of workers available minutes.
Out Come:
Improve Efficiency and Productivity
Workers Satisfaction
Current Situation:
Have to implement.
Why need:
have to educate of worker regarding SMV, Line Expected
Qty(target) & Expected Quality Stranded
Out Come:
Bottom line should be feel what are the expectation &
contribution of them.
Current Situation:
Have to implement.
Out Come:
To eliminate unnecessary time (such as Idle, no work,
Machine breakdown etc..)
can be improve operator motions.
Current Situation:
Functioning.
Out Come:
To avoid loading plan issues.
To minimize the unnecessary pressure of workers.
Can find right Efficiency of team & Individually.
Current Situation:
Have to implement.
Out Come:
Proper line balance
Eliminate bottle neck
Reduce WIP
Reduce Through Put Time
Current Situation:
Have to implement.
Out Come:
Hit the daily plan target.
Current Situation:
Have to implement.
V. Report maintaining.
Out Come:
Optimum system for finding right SMV
Can use for garment Analysis
Can identify workers motion study
Current Situation:
Have to function properly.
Out Come:
Should be use for worker Grading.
Accuracy of salary increment.
Manpower allocation for layout.
Current Situation:
Have to implement.
Why need:
To find out their actual skill
Out Come:
Can decide initial grad for recruitment time
Can decide salary base on grade
Can use for man power allocation
Current Situation:
Have to implement.