Escolar Documentos
Profissional Documentos
Cultura Documentos
Presentation
on
“TG Trip Interlocks 2X15 MW”
INSTRUMENTATION DEPARTMENT
NATIONAL FERTIIZERS LIMITED,
PANIPAT
PREPARED BY :
NIKHIL KUMAR
TOPICS COVERED
OVERVIEW TG MAIN FOCUS
• The Turbine is fed with steam from the main steam header.
The main steam flows through the start up valve (main
steam emergency stop valve), the main steam control valves,
the nozzle groups and parallel to the turbine rotor through
the main steam casing.
Continued...
DESCRIPTION OF TURBINE
Continued...
FLOW DIAGRAM
FEED WATER TANK
BOILER FEED PUMP
LP HEATER
HP-1 Heater
HP-2 Heater
DESCRIPTION OF TURBINE
Continued...
TURBINE BLEEDS
TRIPPING VALUES
1) Lube Oil Pressure Low < 1.4 KG/CM²
2) Turbine Control Oil Pressure < 4.0 KG/CM²
3) HP1 Heater Level High >380 MM<LVL SW>/>380 MM(ANALOG)
4) HP2 Heater Level High >380 MM<LVL SW>/>380 MM(ANALOG)
5) LP Heater Level High >380 MM<LVL SW>/>380 MM(ANALOG)
6) Condenser level high > + 120 MM
7) Rotor Axial Position + 0.5 MM & -0.7 MM
8) Turbine Relative Expansion - 1.75 MM & + 2.0 MM
9) Exhaust Steam Pressure High > - 0.5 KG/CM²
10) Live Steam Temperature Low <425 ˚C
11) Turbine Relative Vibration > 80 µ
TG TRIP SOFT LOGIC
2V3-TSA-OVRSPD
110% OVRSPD
S TG TRIP
EHC TRIP REQ
SSC>40% TRIP
RESET COMMAND S R
SSC IH PWR FAIL BY CONSOL
STATION
SIC IH PWR FAIL R
INST AIR PR LOW
TTL CHANNEL-1
+24 VDC
TRIP1
LLX LL1X HH HH ZLL ZLL HHX DD1 HHX DD1 HH1 HHX LL HH1X LL1X TTL-1
ZLL
PR108 PI109 YZ100 YZ102 PR108 PI109 LI161 YI105 LI166 YI107 LZ106 LI151 PZ311 PZ311 PR105 TR100 EZ120-1
H/L BP LOCAL BOX E-PANEL
TTL1
H/L
TTL1-1
COM-R
LLX LL2X HH HH ZLL ZLL2 HH DD2 HH1 DD2 HH2 HH LL ZLL HH2X LL2X H/L H/L TRIP2
PA116 PI109 YZ100 YZ102 PA116 PI109 LZ163 YI105 LZ168 YI107 LZ106 LZ153 PZ312 PZ312 PR105 TR100 EZ120-2 TTL2 TTL2-1 TTL-2
COM-R