PRESENTATION OF FINAL

REPORT INDUSTRIAL TRAINING


TRAINING SCHEDULE
START DATE END DATE DEPARTMENT AND MENTORS
26.02.2018 09.03.2018 LV/SL
(EN ROSLI BIN SHAREF)
09.3.2018 19.03.2018 OPERATION&MAINTENANCE
(EN ABDUL HANIF BIN MOHAMAD)
20.03.2018 31.03.2018 PROJECT
(EN SAHABUDEEN BIN YASSIN)
01.04.2018 11.04.2018 NETWORK PLANNING
(CIK WIRZA AAZWA BINTI MOHD ZAIN
12.04.2018 22.04.2018 METERING
(EN GHAZALI BIN MOHD JAWI)
23.04.2018 03.05.2018 OPERATION&MAINTENANCE
(EN ABDUL HANIF BIN MOHAMAD)

04.05.2018 18.05.2018 SYSTEM PLANNING


(EN LEKMANULHAKIM BIN BERHAN)
INDUSTRIAL TRAINING ACTIVITY
STREET LAMP UNIT AND LOW VOLTAGE
• incharge in installing and maintaining the utility of street
lamps.
• -Installation of standard street lighting is made at poles of
low voltage overhead lines.
• wire connections are made using Piercing Connector to
insulated conductive wires of street lighting in the air.
• Cut the branches at overhead lines (trail).
LOW VOLTAGE/STREET LIGHT(LV/SL)
STREET LIGHT INSPECTION AND MAINTENANCE
LOCATION:Taman Kenari,Kulim
PROBLEM:Fuse in the black box keep blowing up

black box
The team crew are responsible in street lamp and overhead lines
maintenance. Eventually, the maintenance is done by TNB electrical
contractors and are supervised by TNB’s worker

TNB electrical contractors are


replacing IPC.

IPC were being replaced


with cable lug

nsulation Piercing Connectors ( IPC )


RELOCATION OF ELECTRIC POLES

-The existing electric poles cause an obstruction to the


workers
-Relocate existing poles need to be done the side of the
area
BEFORE AFTER

Figure show the team is doing trail work by cutting the branches that overload the cable.
INDUSTRIAL TRAINING ACTIVITY
OPERATION AND MAINTENANCE UNIT

• Responsible in operating and maintaining the equipment in a substation.


• In a basic substation :
• transformer
• switchgear
• low voltage distribution box (LVDB)/feeder pillar.

• The unit is different compare to the project team because mostly, they do the
operations on their own without venture with any electrical contractors.
• Basically electrical substation have incoming / outgoing circuit controlled by
the switchgears in the same busbar system which is then operated to adjust
either raised or lowered the supply voltage to the transmission.
OPERATION AND MAINTENANCE

SUBSTATIONS UNIT
-Doing routine maintenance and inspect the equipment in the substation
-testing newly arrived equipment such as transformer

TESTING NEW TRANSFORMER


-Ratio Test(High Voltage Insulation Testing Meter)

Testing New the connection of the high and low


Equipment Transformer voltage of the transformer
REPLACEMENT OF OLD RMU TO A NEW ONE AT TAMAN
BAYAM

Shutdown at the PE
New switch gear type-TAMCO

new switchgear
EXAMINED THE BATTERY CHARGER
-The charge need to be working in order to convert AC to DC
and energize the battery
-The battery act as a DC supply to provide power in case of
power disconnection in the system
-DC system is required to supply the load for 5 hours if there is
interruption of AC supply

30 V battery
INDUSTRIAL TRAINING ACTIVITY
PROJECT UNIT

• Project unit = this unit is responsible in implementing a


new project to be built or operated.
• The work done is not only limited to new project but it
involves increasing supply of electricity applied by the
user as well as project that involve TNB electricity
supply system itself.
SITE VISIT

• -Upgrading the existing cable from 185 mm to


240mm xlpe
• For a better,efficient and reliable power
supply in the future

digging trace cable crossing the HDPE pipe cable bridge


road
Site Visit

• Inspection of the new pe(shutdown can be proceed


without delay)
• make sure the contractor being able to finish up their
work

new switch new


gear transformer
Joints and terminations

Resin
INDUSTRIAL TRAINING ACTIVITY
PLANNING UNIT
• Planning - division responsible for managing a
project application of new electricity supply or
project that involve increase or upgrade existing
electric supply.
• Generally, things or work involved in this section
is made of letter and calculation relating to the
supply of new projects or improving existing
supply to be provided to the parties involved
(contractor)
The steps:

projects requested by the The planners will process


applicant must follow the project either passed or
established procedures. not

estimate important and must The team planner will visit


be carried out because it
site and conduct the
involves assessment of the evaluation process and do
costs of a project estimate.

For this ongoing


project, the person
Once the costs involved are known, the incharge to do CAD
preparation form of capital work must be would make the
done by technicians involved before proposed plan
approval by the executive planner. schematic of the
supply to consumers
INDUSTRIAL TRAINING ACTIVITY
METERING UNIT
• Installation of meters is made for the premise that wanted to install a
new meter , converts the old meter and also change the meter if it is
damage.
• Type of meter
• Electronic
• Mechanical
• Type of meter supply
• Ordinary Power Consumer(Opc) (<100A)
• - Single phase
• - Three phase
• Large Power Consumer(Lpc) (>100A)
• - Use Current Transformer(CT)
schematic diagram

Schematic diagram of 3 phase meter Schematic diagram of single phase meter


Example of single phase meter installation
Example of LPC meter installation

current transformer
cable wiring

wireless moderm
CONCLUSION

• In conclusion, trained at Tenaga Nasional Berhad Kulim(


Distribution ) allow trainees to contribute and practice all the
theories that have been studied in the university.

• Trainee also gain exposure on a work process and


equipment used in TNB. In addition, the trainee can also
develop technical knowledge and skills.