Você está na página 1de 12

EXERCISE REPORT

Lecturer: Dr. Tran Van Xuan

Group members Contribution


Tran Thanh Khang 25%
Vo Hoang Duy 25%
Tran Ngoc Tu 25%
Ngo Dang Hoang Khang 25%
Exercise 1
• Which facies may get most potential for Oil & Gas collector?
The Overbank facies is the facies with most potential for oil & gas collector
because it features these factors:
 Coarse grain size
 Well-sorted grains due to dynamic flow condition
 Higher homogeneity comparing to the other 2 environments
 Secondary minerals which reduce porosity and permeability (such as mica)
were swept away by the high energy flow
Exercise 1
• Priority location for next exploration or apprisal well
The next location for exploration or apprisal well are South-East Area (cells:
(163-165, 152-154,141-143), (161,162,150,151.139,140) and North-East Area
(cells 38,39,40.41) because the permeability and porosity of these area are
quite high.
Exercise 1
Exercise 1
Dong Duong Project
Which stage is the Dong Duong field life in?
• Up to December 31st 2015, according to data from the
production wells, it is found that the water appeared rapidly
decreasing the oil flow due to the fact that the production well
created a large difference between the reservoir pressure and
the bottom-hole pressure so the water coning phenomenon
occurs.
Dong Duong Project
Which stage is the Dong Duong field life in?
• On the other hand, according to the assessment of current
production profile, the reservoir has a strong support from the
aquifer.
• The main advantage of this support is that there is no need for
water injection to maintain the reservoir pressure and have a
good source of energy to ensure that the reservoir pressure
does not decrease rapidly.
• However, the main disadvantage is that appearance of rapid
water flooding phenomenon and production wells are relatively
adjacent.
Dong Duong Project
Which stage is the Dong Duong field life in?
• Thus, Dong Duong oil field is in production stage, carrying out
EOR methods to resolve the water conning problem and
optimize the production by ESP (Electrical Submersible Pumps)
installing with sand screening system combined with Gaslift.
Dong Duong Project
Is it mature enough to conduct integrated reservoir modeling
by top down approach?
• Dong Duong oil field has been produced from June 2010;
therefore, most of the well behaviors and fluid properties have
been studied thoroughly, as well as data characteristics of the
reservoir.
• Hence, we can conclude that this field is mature enough to
conduct integrated reservoir modeling by top-down approach.
Ca Tam Project
• It starts with building a geological model of the reservoir that is
populated with the best available petrophysical and geophysical
information at the time of development.
• Engineering fluid flow principles are then added and solved
numerically so as to arrive at a dynamic reservoir model.
Ca Tam Project

Process of building geological model and hydrodynamic model


for Ca Tam field
Ca Tam Project
• The input data for process of building the geological model and
hydrodynamic model including seismic datas intepreted in 2016, well
logging datas, geological and petrophysical datas and datas that
related to well testing – producing from quantitative exploration wells
in research area. As the figure and the explaination above, we can
conclude that this field conduct integrated reservoir modeling by
bottom-up approach.

Você também pode gostar