Você está na página 1de 49

DETAILED PROJECT REPORT (DPR) 

FOR CONSTRUCTION OF LANDFILL 
SITE IN BARDAGHAT MUNICIPALITY

Prof. Murali Gopal Ranjitkar
 Team Leader
Badri Maharjan and Maru Yogal
CONTENTS:
 Background
 Objective of the assignment

 Methodology

 Solid Waste Management in Bardaghat 
Municipality
 solid waste Quality and Quantity

 Conceptual Planning on Integrated Solid Waste 
Management System
 Minimum Criteria for Solid Waste Management

 Waste disposal and landfill design

 Cost Estimation
BACKGROUND:
 Merging Makar, Panchanagar 
(2014), Jahada, Jamuniya, 
Daunne Devi and Dhurkot 
(2017)
 Population ­ 67,289  (2018, 
projected from 2011 census and 
New emerging town
 Growing population

Solid Waste Management falls 
under the jurisdiction of local 
body
Solid Waste Management is one 
of the major problem of local body
OBJECTIVES OF THE ASSIGNMENT
 Prepare the detailed project report for the construction of landfill site 
at the Bardaghat Municipality.

SCOPE OF ASSIGNMENT
 Review and verify all available primary and secondary data related to 
solid waste generation and management
 Study the present development activities, urbanization trend, projection 
of population, waste generation, collection and disposal etc.
 Study natural land forms and resources that shall be affected by project 
and identification and selection of land fill site.
 Carry out all the required engineering survey and investigations such as 
topographical surveys, geo­technical investigation, construction 
materials, ground water identification, solid waste sampling and 
analysis, as applicable to the sub­ projects.
SCOPE CONTD.
 Work scheduling, surveys, detailed engineering 
designs, estimation and preparation of complete 
document on time.
 Prepare detailed work plan and implementation 
schedule and submit Bardaghat Municipality, Office of 
the Municipal Executive
 Prepare detailed drawings  

 Prepare tender documents and specification  

 Prepare a collection route and vehicle need assessment

 Prepare institutional arrangement plan
METHODOLOGY:

 Literature Review
 Waste generation and composition survey

 Consultation Meeting with relevant stakeholders

 Field Verification

 Detailed topographical survey

 Detailed geo­technical survey

 Data Analysis 

 Design and Cost estimation of Landfill site and 
Facilities
 Preparation  of report and documents
CURRENT STATUS ­1
EXISTING SOLID WASTE 
MANAGEMENT PRACTICE

 Total HH waste generation:  about1 kg
 Waste composition:

 Waste Collection Coverage:
 Ward No ­4 only except Badhipitdit area 
and only few areas of ward no.9
CURRENT STATUS ­2­EXISTING SWM PRACTICES

Since, Sabik Makar VDC and Panchanagar VDC, Bardaghat have been collecting waste 
through Bardaghat Bazaar Committee and Panchanagar Bazaar Committee from 
respective market areas.
Collection System
Door to door / Road side collection
Collection Equipment:
One tractor, Tipper
Collection Schedule:
Every morning
Open dumped inside nearby community forests namely Parijat Community forest and 
Sansarkot Community forest
PROBLEM IDENTIFICATION
 Proper institution (structure and function) for solid waste 
management is not set­up in the Bardaghat Municipality
 Lack of trained human resources as well as available human 
resources are also inadequate
 Lack of infrastructures and physical facilities required for solid 
waste management,
 Solid waste collection coverage limited to main market area only

 Lack of knowledge and technical skill on 3R activities: limited to 
use of organic kitchen waste as animal feed and manure making in 
rural settings
 Inadequate awareness and co­ordination among potential 
stakeholders such as schools and other institutions
 Open dumping of collected solid waste 

 Lack of monitoring and supervision, and enforcement mechanism.

 Lack of information and database on solid waste 
WASTE GENERATION  SOURCE
 Waste generation: 0.223 kg/capita/day; average 0.248kg/capita/day 
including 1% increment with development of life standard
 Estimated total household waste generation: 15.35 metric tons/day in 2018 

 23.71Metric Tons per day projected for 2037

Waste generation according to wards
 3.50 

 3.00   2.93 

 2.50 

 2.00 

 1.46   1.40 
 1.50   1.37 
 1.22 
 1.15   1.09 
 1.00   0.88   0.87 
 0.69 
 0.59   0.60 
 0.50   0.36   0.29   0.30 
 0.16 

 ­   
4 9 10 1 2 7 13 14 3 5 6 8 11 12 15 16

Total waste Tons/day
COMPOSITION OF SOLID WASTE
 Nearly 70.67 % of the waste generated in Bardaghat 
Municipality is organic

Solid waste composition of Bardaghat Muncipality

9.11% 8.30%

1.69%

1.10%

1.92% 7.21%

70.67%

Plastic Paper  Glass Metal


Textile  Inert Organic Waste
INSTITUTIONAL CONTRIBUTION
Institution/com Waste composition Quantity Total
mercial set-up (kg/day) quantity
(kg/day)
Banks Organic, paper and some 0.9 10.8
inert waste
Schools Organic, paper, plastics and 3.3 194.7
rubber
Restaurants Organic, paper, plastic, 6.1 549
glass and some metal
Hospitals Organic, paper, plastic, 1.9 26.6
glass, metal, rubber, textile,
inert (medical waste taken
care by themselves)
Total 781.1 Kg /day (0.78 tons/day)
SOLID WASTE MANAGEMENT 
GUIDING PRINCIPLES

Solid waste is a mandatory service by SWM 

ACT
Long­term Planning on SWM

Solid waste management is not only a 

technical issue
People’s participation and community 

mobilization
Waste as Resource

Polluters pay principle

INTEGRATED SOLID WASTE MANAGEMENT

Integrated solid waste management refers to the strategic approach to 
sustainable management of solid wastes covering all sources and all 
aspects, covering generation, segregation, transfer, processing/treatment 
focusing on 3R programs and final disposal at sanitary landfill site

Guiding principles following strategies proposed: 
Source segregation and waste minimization,
Effective waste collection and transportation,
Waste processing and treatment,
Waste disposal,
People’s participation and community mobilization,
Institutional Setup.
THE MASTER PLAN ON ISWM
WASTE Minimization: Final Disposal
1. Source Segregation 1. Sanitary Landfill site along with 
facilities
2. Promotion of 3R 
activities 2. Septic Sludge treatment plant

Collection and Transportation Institutional Development
3. door to door collection 3. Establish a SWM Section/Unit 
4. on time collection 4. Policy Development/ Bylaws
5. Route Optimization 5. Financial Management
6. Service area expansion 6. Human Resource Development
Waste Processing and  People’s Participation
Treatment 7. Awareness Program
7. Biodegradable waste –  8. Mobilization of NGOs & CBOs
animal feeding /Compost 9. Communications
8. Recyclable – sorting and 
storage
MINIMUM CRITERIA FOR SOLID 
INTEGRATED WASTE MANAGEMENT (ISWM)
Source segregation and minimization of waste at point of 
generation
 Zoning of the settlements
 Zone A:  densely populated commercial areas (ward number 4, 9 and 
10)
 Zone B:  Adjoining to the densely populated Zone A which is mostly 

residential areas having scattered commercial activities (ward no 1, 2, 
7, 13 and 14)
 Zone C: Settlement is scattered (ward no 3, 5, 6, 8, 12, 15 and 16)
WASTE COLLECTION AND TRANSPORTATION 
ROUTE
 Nearest from the Main Market, TNC Chowk (550 meters) 
 Loaded vehicles need not to climb any hill (avoid steep slope)

 The route ends up at higher and flat ground appropriate for 
waste segregation 
 The actual landfill lies below the flat area 
ASSESSMENT OF VEHICLES 
REQUIREMENT
•Tractor is of 2.5m3 capacity
•Taking the typical bulk density of mix solid waste is taken 350 kg/m 3 and 
300 kg/m3 for inorganic waste. 
•Ward 4 alone generates about 3 Metric Tons of solid waste daily, 
necessitating 4 tractor trips/day. 
•Since, the landfill is inside the municipality and just few kilometers 
(about 5 km) from the market areas, taking 2 trips by each tractor, 2 
tractors trailers are needed for collection of solid waste from wards with 
market and commercial areas only
ASSESSMENT OF VEHICLES 
REQUIREMENT No. of No of
Quantity of Waste Density of waste Capacity of one Assumed Tractor
Scenario Type of Waste Volume of waste (m3) trips Vehicle
(tons) ton/m3 tractor per trip (m3) Efficiency Capacity (m3)
require require
Total Waste from all
Scenario 1
wards all zones
15.35 0.35 43.86 2.5 100% 2.5 17.55 8.8
20% and 10% of
organic and
Scenario 2
recyclables are
11.10 0.35 31.71 2.5 100% 2.5 12.69 6.3
recovered at source
Zone A-Total Waste
from wards having 4.39 0.35 12.55 2.5 100% 2.5 5.02 2.5
commercial area
Zone B-Total
Inorganic waste
from wards with
1.52 0.3 5.07 2.5 100% 2.5 2.03 1.0
residential and
scattered
scenario 3 commercial area
Zone C-Total
Inorganic waste
from wards having 1.69 0.3 5.63 2.5 100% 2.5 2.25 1.1
scattered residential
area
Total waste
collection for 7.60 23.25 9.30 4.7
disposal
WASTE PROCESSING AND TREATMENT
Waste Characteristics

Organic In-organic
70.67% 29.33%

Plastic Paper Glass Metal Textile Inert


9.11% 8.30% 1.69% 1.10% 1.92% 7.21%

With successful implementation of source segregation and 3R programs the 
recycling rate would be maximized and minimize the time and cost required 
for separating the recyclables from mixed waste

Processing of Biodegradable waste
Livestock feeding
Composting
Processing of Non­Biodegradable waste
PEOPLE’S PARTICIPATION AND 
COMMUNITY MOBILIZATION
 Active participation of all concerned stakeholders 
including government institutions, local NGOs/CBOs, 
business enterprises, waste management service 
provider and local inhabitants
 To encourage people’s participation­capacity building, 
awareness raising programs and cleaning campaigns; 
School awareness program should be launched
 Intensive training package­Segregation of solid waste, 
composting, vermi­composting
INSTITUTIONAL DEVELOPMENT
 Establishment of separate Solid Waste Management Section/Unit 
with defined responsibilities to implement and supervise solid 
waste management activities.
 HRD programs would be designed to different target groups in 
various sectors of solid waste management
 Implementable Solid Waste Management Guidelines to be 
prepared based on the provision of the Solid Waste Management 
Act, 2011 for delivering effective services
 Proper database management system on waste management needs 
to be developed
 Polluter’s Pay Principle would be adopted to ensure financial 
sustainability of the entire solid waste management system
 Public private partnership (PPP) Public private partnership (PPP)  
concept­Favorable atmosphere for privatization to be developed by 
encouraging local NGOs, CBOs and private sectors to participate in 
solid waste management activities by introducing private sector 
investment friendly policies i.e. incentives, subsidies, tax 
exemption, soft loans etc.
WASTE DISPOSAL AND LANDFILL DESIGN

 Isolating the waste from the surrounding environment until it becomes harmless 
through biological, chemical and physical processes of nature to minimize exposure of 
the detrimental effects of solid waste to humans and environment
 Designed to manage non­biodegradable, inert waste and other wastes that are not 
suitable either for recycling or for biological process. 
For operation point of view following facilities would be developed:
 Waste Bordering Dam,

 Liner facility (Compacted Clay Liner),

 Leachate collection and treatment facility,

 Landfill gas control facility,

 Storm water drainage facilities in and around the site,

For management point of view following facilities would be developed:
 A 2 roomed building with verandah and rest room facility to serve as guard house.

 Service road(120m),

 Environmental monitoring facilities,

 Leachate pond and pumping house,

 Waste reception, sorting and recyclable storage facility propose for future 

 Composting facility proposed for future.
WASTE DISPOSAL AND LANDFILL DESIGN

Apart from this, common facilities necessary for supporting the above­
mentioned facilities would be as follows:
 Main entrance gate

 Fencing around the sanitary landfill site,

 Plantation around the sanitary landfill site,

Landfill Type:
Sanitary landfill site was designed for final disposal of
municipal solid waste and nonhazardous waste on the
Semi­aerobic Landfill System.
 engineering techniques was adopted

 Solid waste is disposed of with controlled tipping and compacting layer by 

layer with regular covering of waste surface,
 Compacted Clay Liner would be laid at the bottom of the landfill for 
controlling leachate,
 Adequately sized perforated leachate collection pipes would be installed at 
the bottom of the landfill mass for quick draining of leachate,
 Appropriate landfill gas control system would be installed at appropriate 
locations.
POPULATION PROJECTION AND WASTE 
GENERATION FORECASTING
Population Projection of Bardaghat Muncipality 
100000
90000
80000
70000
Population 

60000
50000
40000
30000
20000
10000
0
2005 2010 2015 2020 2025 2030 2035 2040

Year
ANNUAL WASTE GENERATION QUANTITY
PROJECTION OF LANDFILL WASTE 
QUANTITY
CALCULATION OF MATERIAL RECOVERY FACILITY
Waste to landfill Volume of Waste in 20% cover Total volume Cumulative
(MT) landfill (m3) material (m3) need (m3) volume (m3)
Total Waste
Quantity Cumulative
Year Popn (MT/day) 70.48% waste /year 0.6MT/m3 20%
2017 67,289 0 - - - - - -
2018 68,164 15.35 10.82 3,949.29 6,582.15 1,316.43 7,898.58 7,898.58
2019 69,050 15.71 11.07 4,040.64 6,734.40 1,346.88 8,081.28 15,979.86
2020 69,947 16.07 11.33 4,134.10 6,890.16 1,378.03 8,268.20 24,248.06
2021 70,857 16.44 11.59 4,229.72 7,049.53 1,409.91 8,459.44 32,707.50
2022 71,778 16.82 11.86 4,327.55 7,212.59 1,442.52 8,655.11 41,362.61
2023 72,711 17.21 12.13 4,427.65 7,379.42 1,475.88 8,855.30 50,217.91
2024 73,656 17.61 12.41 4,530.06 7,550.10 1,510.02 9,060.12 59,278.03
2025 74,614 18.02 12.7 4,634.84 7,724.74 1,544.95 9,269.68 68,547.71
2026 75,584 18.43 12.99 4,742.05 7,903.41 1,580.68 9,484.09 78,031.80
2027 76,566 18.86 13.29 4,851.73 8,086.22 1,617.24 9,703.46 87,735.26
2028 77,562 19.3 13.6 4,963.95 8,273.25 1,654.65 9,927.90 97,663.16
2029 78,570 19.74 13.91 5,078.77 8,464.61 1,692.92 10,157.53 107,820.70
2030 79,591 20.2 14.24 5,196.24 8,660.40 1,732.08 10,392.48 118,213.17
2031 80,626 20.67 14.57 5,316.43 8,860.71 1,772.14 10,632.85 128,846.02
2032 81,674 21.15 14.9 5,439.40 9,065.66 1,813.13 10,878.79 139,724.82
2033 82,736 21.63 15.25 5,565.21 9,275.35 1,855.07 11,130.42 150,855.23
2034 83,812 22.13 15.6 5,693.93 9,489.89 1,897.98 11,387.86 162,243.10
2035 84,901 22.65 15.96 5,825.63 9,709.39 1,941.88 11,651.27 173,894.37
2036 86,005 23.17 16.33 5,960.38 9,933.97 1,986.79 11,920.76 185,815.13
2037 87,123 23.71 16.71 6,098.24 10,163.74 2,032.75 12,196.49 198,011.61
Average 16.04 11.3 4125.24 6875.4 1375.08 8250.48
GENERAL DESCRIPTION ON 
NATURAL CONDITIONS OF THE SITE

 Landfill site is located at Ward No. 5 of the Bardaghat 
Municipality, Nawalparasi District and is about 550 meters from 
the main TCN Chock (Bardaghat Bus Park)
 Between Sayapatri Community Forest and Parijat Community 
Forest, Bardaghat, roughly 27.550176 N latitude, and 83.802764 E 
longitudes 
 Average temperature : 30° C & 42° C during summer; 6° C to 17° 
C during  winter
 Average annual rainfall estimated ranges from 2326 to 2375mm
 Water table has been delineated at the depth of 3.00­3.5m
 Groundwater flow: towards south direction from the proposed 
landfill site
GENERAL DESCRIPTION ON NATURAL CONDITIONS OF THE SITE

 Coefficient of permeability:  3.8410­07cm/sec  (very low 
permeable)
 Bearing capacity: the soil strata at the depth of 1.5m and 
more below is safe for foundation design. The foundation 
design can be done taking at least 10 tons/m2 for the 
depth below 1.5m from the existing ground surface.
 Sub­surface geology at proposed Dam: 
SANITARY LANDFILL LAYOUT PLAN
 Total land acquired: 5.33 
hectors 
 Necessary facilities: 
 Liner, drainage layer
 Leachate collection system,
 Landfill gas management system 
and evaporation pond
 Guard house, 
 Service road
 Sorting and storage facility,
 Cover material stocking area,
 Storm water drainage facility
 Entrance gate
 Fencing and monitoring facilities 

Landfill area is of 200,000 m3 
capacity enough to 
accommodate 20 years 
WASTE BORDERING DAM
 Functions of Waste Bordering Dam
 Stores the designated landfill volume.
 Prevents collapse of working face and 
overflow of landfilled wastes.
 Prevents discharge of leachate and 
seepage from the landfill site.
 Retains rainwater in the landfill site, 
temporarily but safely. 
 Retains wastes safely during the landfill 
operation as well as after completion.
 7.3 m height, 1.5 m depth foundation. 
The base of the dam is 4.0 m thick, 
while the top is 1.6m.The waste 
bordering dam is constructed at the 
downstream of depression along the 
edge of the plain land from East to 
West of length about 49.23 m.  
  
BASEMENT SEALING – LINER SYSTEM
 High quality clay could be used as liner materials at the basement of the 
landfill­red clay is found 25 km away from along the Arun Khola. 
 Preparation of basement after excavating the top humus soil and compacting 
the sub­soil in proper line & slope (2%) to form a stable foundation as liner 
basement with Dpr82%­96%
 Laying of 2 layers of compacted clay liner250 mm each over the prepared 
basement,
 Laying of a protective layer of geo­textile over the geo­membrane, and

 Laying of a 300­500 mm thick leachate drainage layer (river bed 
shingle/pebble).
LEACHATE COLLECTION SYSTEM
 Drainage layer, networking of leachate collection pipes, inspection manholes, leachate 
collection pond and removal system
 Perforated Hume Pipe of diameter 300 mm and of medium gradeNP3 was selected for 
this purpose. The pipes would be perforated in upper 2/3 part with circular holes of 
10mm diameter and laid embedded in graded gravels/ boulders (as filter material) 
centrally at the bottom of each landfill sloped both ways laterally at 4% slope towards it
LEACHATE TREATMENT AND 
DISPOSAL
LANDFILL GAS CONTROL AND 
MANAGEMENT
LANDFILL GAS CONTROL AND 
MANAGEMENT
SURFACE WATER MANAGEMENT
SERVICE ROAD

 TCN Chowk, parallel to the East­  Width of 7 m will be of 120 m 
Waste Highway is about 500  length. The inward side of the 
meters to the landfill site, with  landfill is with 45­degree 
additional 120 meters around the  slope,
landfill area
SITE INFRASTRUCTURES AND FACILITIES
PHOTO GALLARY
 vv

Você também pode gostar