Objectives:
and displace out of drill pipe at the rate designed based on hole
size.
STABILIZATION PLUGS
Placement Design
mud.
Under displace plug 200 ft above top of plug.(3.5 BBLS. in 5" DP).
CASES HISTORY
Slurry Composition:
Extender: Prehydrated Gel: 0.5% 0.0%
Fluid Loss: FL- 54B 0.25% 0.45%
Dispersant: CD- 31L 0.0 5.0 ghs
Retarder: R- 3 / R- 21L 0.32% 1.5 ghs
Defoamer: FP- 6L 1.0 ghs 1.0 ghs
Fiber: Tuf Fiber 0.2% 0.2%
Thickening time @ BHCT: 7:25 hrs 7:35 hrs
STABILIZATION PLUGS
Cement Slurry Design:
Rheology @ Tsuperficie: 10 / 15 / 64 / 105 / 142 / 240
BHCT : 15 / 29 / 53 / 76 / 95 / 159
Gels : 23 / 32