Escolar Documentos
Profissional Documentos
Cultura Documentos
PRACTICE
Map made as a result of a cadastral survey
drawn to appropriate scale and showing all
land parcels and important natural and
man-made features within municipality for
purposes of describing and recording
ownership.
Ans. cadastre
Establishment of the permanent forestland
and protected area boundaries by
conducting actual ground survey.
Delimitation survey
The standard generic term for satellite
navigation systems that provide
autonomous geo-spatial positioning with
global coverage.
Ans. monument
Deeds or other documentary evidence of
title ownership to land
Ans. 1/20000
Relative error for secondary control for
project control.
Ans. 1/10000
Relative error for tertiary control of project
control.
Ans. 1/5000
Linear error for primary control of project
control.
Ans. 5cm/km
Linear error for secondary control of
project control.
Ans. 10cm/km
Linear error for tertiary control of project
control.
Ans. 20cm/km
Vertical accuracy for project control,
primary control.
Ans. 12 d^1/2
Area for primary control of project control.
Ans. strike
A portion of the surface of the undisturbed
rock formation w/c is included between
the walls or sides of mineral deposits.
Ans. apex
Small nail or hook in the roof
Ans. spad
Distance between two parts of the same
vein, measured along a strike.
Ans. heave
Angle which beds on strata are inclined
from the horizontal.
Ans. dip
An approximately horizontal underground
passage.
Ans. adit
Preliminary passageway driven for
exploration.
Ans. heading
Portion of the vein exposed at the surface.
Ans. outcrop
A horizontal opening in or near a mineral
deposit and parallel to the course of the
vein.
Ans. drift
A principal opening through which mineral
is exploited.
Ans. shaft
Spacing of stations not to exceed, primary
control, triangulation.
Ans. 1-3km
Spacing of stations not to exceed,
secondary control, triangulation.
Ans. 1km
Spacing of stations not to exceed, tertiary
control, triangulation.
Ans. 2
Angular observations w/ 1 second
theodolite, secondary control,
triangulation.
Ans. 2
Angular observations w/ 1 second
theodolite, tertiary control, triangulation.
Ans. As required
Triangle closure not to exceed, base
measurement, primary control,
triangulation.
Ans. 5’’
Triangle closure not to exceed, base
measurement, secondary control,
triangulation.
Ans. 10’’
Spacing of stations not to exceed, tertiary
control, triangulation.
Ans. 30’’
Spacing of stations not to exceed,
secondary control, triangulation.
Ans. 1km
Spacing of stations not to exceed,
secondary control, triangulation.
Ans. 1km
The reversion of the property to the
government when the owner dies without
having a will or heirs.
Ans. Escheat
The reversion of the property to the
government when the owner dies without
having a will or heirs.
Ans. Escheat
The reversion of the property to the
government when the owner dies without
having a will or heirs.
Ans. Escheat
The reversion of the property to the
government when the owner dies without
having a will or heirs.
Ans. Escheat
The reversion of the property to the
government when the owner dies without
having a will or heirs.
Ans. Escheat