POWER PLANT

ELECTRICAL SYSTEM
POWER PLANT ELECTRICAL SYSTEM
TABLE OF CONTENTS
Module 1. GENERATOR SYSTEM

Module 2. EXCITATION SYSTEM

Module 3. HV SYSTEM

Module 4. LV SYSTEM

Module 5. UPS SYSTEM

Module 6. DC SYSTEM

Module 7. DIESEL GENERATOR SYSTEM


Overview
The customized training of the Plant Performance Optimization for SMCPC Limay
Greenfield 4 x 150MW CFB Power Plant

 EISSS will provide on site training and actual testing and plant equipment.
 EISSSS will supply test apparatus (Fan Pilot Scale and Skid Pump systems)
during the
period of the training.
 No. of attendees: up to 20 persons.

Expected Output
 To gain knowledge in the plant heat rate, its importance in the safe and
economic operation of the power plant.
 To gain knowledge in the determination of boiler efficiency, combustion,
turbine cycle and unit heat rate.
 To be able conduct the testing and evaluation.
 To be able to develop the monitoring program in optimizing the unit
performance
POWER PLANT ELECTRICAL SYSTEM
Module 1. Generator System
1. Generator 3. Protection
1.1 Principles 3.1 ANSI/IEEE Symbols
1.2 What is Generator? 3.2 NEC/PEC Codes
1.3 Basic Operation of Generator 3.3 GMCB
1.4 Generator used in Power 3.4 GCB
Generation 3.5 Protection Instruments
1.5 Generator Nameplate 4. AVR
1.6 Generator Capability Curves 4.1 Operation Overview
2. Transformer 4.2 AVR Devices
2.1 Transformer Working Principle 5. Synchronization
2.2 Transformer Construction 5.1 What is synchronization?
2.3 Generator Transformer (GSU) 5.2 Operation in synchronizing
2.4 Unit Auxiliary Transformer (UAT) 5.3 Synchronizing Devices
2.5 Excitation Transformer 6. Metering
2.6 Neutral Ground Transformer 6.1 CT & PT
(NGT) 6.2 Metering Devices
2.7 Measurement/Instrumentation 7. Switchyard
Transformer 7.1 Components in switchyard
2.8 Protection Transformer
2.9 Transformer Nameplate
POWER PLANT ELECTRICAL SYSTEM
Module 2. Excitation System
1. Excitation Control
2. Different Excitation System
3. Operating Modes
4. Limiters and Protection
5. Hardware Components

Module 3. HV System
1. Transformer (6.6kV/460-266V)
2. HBT
3. Control Components
4. HV MCC
4.1 Coal Yard MCC
4.2 WWT MCC
5. Motors
5.1 Starting Methods
5.1 Motor’s Protection
5.3 Motor’s Nameplate
6. Per Unit Analysis
POWER PLANT ELECTRICAL SYSTEM
Module 4. LV System
1. Transformer (460V/230V) 4.5 Soft-Com2
2. HBT 4.6 Common MCC
3. Control Components 4.7 Boiler MCC
4. LV MCC 4.8 Turbine MCC
4.1 460 MCC 4.9 Fly Ash MCC
4.2 230 MCC 4.10 Maintenance 460V MCC
4.3 Sootblower Control Panel 4.11 Maintenance 230V MCC
4.4 Motor Valve Control Panel

Module 5. UPS System


1. What is UPS? 4.5 Alternate AC Manual Backup
2. Types of UPS 4.6 AC Output
3. Protection of UPS 4.7 120V AC Distribution Panel
4. Components 5. Operation
4.1 Inverter Battery 5.1 Start-up
4.2 Inverter Battery Charger 5.2 Normal Operation
4.3 Inverter 5.3 Abnormal Operation
4.4 Static Switch 5.3 Shutdown
POWER PLANT ELECTRICAL SYSTEM
6. DC System
1. What is DC System in Power Plant?
2. Protection of DC System
3. Components
3.1 Station Battery
3.2 Battery Charger
4. Operation
4.1 Start-up
4.2 Normal Operation
4.3 Shut-down

7. Diesel Generator System


1. What is Diesel Generator? 5.4 Cooling System
2. Why Diesel Generator? 5.5 AVR System
3. Protection of Diesel Generator 5.6 Excitation System
4. Components of Diesel Generator 5.7 Emergency System
5. System 6. Operation
5.1 Fuel Oil Delivery System 6.1 Start-up
5.2 Exhaust System 6.2 Normal Operation
5.3 Lubrication System 6.3 Shutdown
3. References

5.1 ASME Performance Test Codes


5.1.1 PTCPM
5.1.2 PTC 4, 4.3, 11, 19.10 (Boiler, Air Heater, Fans and Gas Sampling)
5.1.3 PTC 6-S, 8.2, 12.1 and 12.2 (Steam Turbine, Pump, Heaters and Condenser)

5.2 Plant Performance Application Software


5.2.1 GP Strategies Corp (GPCalcs and EtaRPO)
5.2.2 Emerson Global Performance Advisor
5.2.3 Steam Table IFC-67and IF-97
5.2.4 Pipe Flow Expert