Escolar Documentos
Profissional Documentos
Cultura Documentos
and
National Federation of Group Water Schemes
STEDS (Update)
Jim McGuire
Senior Engineer
North Tipperary County Council
Background
Project description
Current status
Literature search
Pilot Project
PROJECT TEAM
Treatment System: Orenco, USA
• Pump vault
• Filter cartridge
• Float assembly
• Discharge assembly
Collection System
No minimum velocities
No oversized designs
Complete, premanufactured
package
Operates in an unsaturated
condition (not submerged)
Low-impact construction
Minimal disruption to community
Advantages
Cost-effectiveness
No manholes
No pumping stations
• No bleaches