1 New Meralco Three-


Phase Service Voltage
(400Y/230-Volt System)
OUTLINE

1. Brief Introduction
2. Applications
3. Meralco Supplied Transformers
4. Vault Requirements for Deadfront DT
5. Vault Requirements for Padmounted DT

Presentation to IIEE Oct. 26, 2006


/RRM
New Service Voltage

Present Standard 3-phase Service


Voltages in Use
ð 230Y/133 Volts, 4-wire

ð 460Y/265 Volts, 4-wire

ð 230 Volts, 3-wire (Open Delta)

New Standard 3-phase Service Voltage

ð 400Y/230 Volts, 4-wire

Presentation to IIEE Oct. 26, 2006


/RRM
New Service Voltage

Reasons for adopting the 400Y/230 V service

• Respond to the needs of the customers and the industry

• Make available 230 V line-to-grounded neutral for connection of 1-


phase loads

• Help reduce the cost of customers’ electric facilities

• Allow use of IEC-approved equipment

Presentation to IIEE Oct. 26, 2006


/RRM
Application

Available only in areas with existing primary


distribution voltage of:
ð 34.5 Y/20 kV

ð 13.8Y/7.9 kV

Available only for 3-phase and for solely-


served applications

Presentation to IIEE Oct. 26, 2006


/RRM
Application

Maximum Transformer Capacity to be


Supplied
ð Residential Buildings
 Multiple banks

ð Commercial Buildings
 2-banks of 1 MVA

ð Industrial
 1 MVA

Presentation to IIEE Oct. 26, 2006


/RRM
Transformers for the New Service Voltage
Meralco-supplied Transformer Capacity for Solely-Served
400Y/230V Service

ð Overhead Distribution Transformers

• 3-25 kVA up to 3-100


kVA pole-type units to be
mounted on a
distribution pole

• A maximum of one (1) bank


or 300 kVA may be provided

Presentation to IIEE Oct. 26, 2006


/RRM
Transformers for the New Service Voltage

Deadfront (Vault-Type) Distribution Transformer

• 1-phase unit

• 2 deadfront primary
bushings

• Spade-type secondary
terminals
• Round tank construction

• Standard DT accessories
Transformers for the New Service Voltage
Meralco-supplied Transformer Capacity
• 3-167 kVA, 3-250 kVA & 3-333 kVA transformer units to
be installed indoors in a PEC-approved transformer vault
• Maximum of one (1) bank or 1000 kVA for solely-served
loads

Presentation to IIEE Oct. 26, 2006


/RRM
Transformers for the New Service Voltage
Padmounted Distribution Transformer
• Available sizes - 750 kVA and 1 MVA
• For application in multi-bank installations inside
buildings
 2-750 kVA for 1500 kVA load
 2-1000 kVA for 2000 kVA load

• May be installed in single-bank application outside


buildings

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirements for
Deadfront (Vault-Type) DT’s

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Deadfront DTs

APPROVED LOCATIONS

ð Ground floor

ð Second floor

ð First basement (provided the building has


multiple basements)

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Deadfront DTs

CONSTRUCTION
ð Reinforced concrete walls (‘buhos’), 150-mm
thick
ð Reinforced concrete floor (‘buhos’), 100-mm thick
when in contact with earth, 150 mm when above
another storey
ð No openings such as doors or vents to any part of
the building interior
ð Provided with 150-mm high door sill for liquid
confinement

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Deadfront DTs
ACCESS
ð Equipment Access Doorway directly accessible
from the outside of the building
ð Hatchway may be used for basement and 2nd
floor installations
ð Dedicated personnel access doorway for
basement and 2nd floor
ð Clear and permanent access road leading to the
vault (at least 3.5 m if no crane is necessary; 6.5
m for installations requiring crane)
ð Where crane will be used, no overhang or canopy
in the immediate vicinity
Presentation to IIEE Oct. 26, 2006
/RRM
Accessibility Problem

2/F
TRANSFORMER
INSTALLATION
NOTE: Signboard obstruction
CO CHIN LENG BLDG.
Q. Paredes St., Binondo, Manila.

Presentation to IIEE Oct. 26, 2006


/RRM
Accessibility Problem

2/F TRANSFORMER
INSTALLATION
NOTE: Facade obstruction

P.C.T. BUILDING
311 Muelle de Binondo St., Binondo,
Manila
Presentation to IIEE Oct. 26, 2006
/RRM
Accessibility Problem

2/F TRANSFORMER
INSTALLATION
NOTE: Signboard obstruction

EXCELINE INTERNATIONAL INC.


44 Nueva St., Binondo, Manila

Presentation to IIEE Oct. 26, 2006


/RRM
Accessibility Problem

5/F TRANSFORMER
INSTALLATION

437 Q. Paredes St., Binondo, Manila

Presentation to IIEE Oct. 26, 2006


/RRM
Accessibility Problem

TRANSFORMER VAULT IN EASTWOOD ...available access is only through the


-LAFAYETTE 1 & 2 convenience store shown above.

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Deadfront DTs
VENTILATION
ð Louvered vents with a combined net area of
opening not less than 20 sqcm. per kVA
ð For natural air ventilation, opening shall be on
different sides of the vault (one near the floor and
the other near the ceiling)
ð Where only one side is exposed to outside air,
exhaust fan and duct are required
ð Fan shall be temperature controlled (ON at 40°C,
OFF at 36ºC) with by-pass switch for testing
ð Exhaust and intake fans for basement installation

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Deadfront DTs
HOISTING FACILITY

ð Not compulsory for all installations

ð Shall consist of an I-beam and chain block with


capability of not less than 2 tons

ð Required headroom is only 3 meters

ð Certification signed and sealed by a registered


structural engineer
ð Customer responsible for the maintenance of the
hoisting facility

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Deadfront DTs

MINIMUM VAULT DIMENSION

LOCATION 1-BANK

Ground Floor
(W) 5 m X (D) 4 m
2nd Floor
X (H) 3 m
1st Basement

NOTE: W = Width
D = Depth
H = Height (Headroom)

Presentation to IIEE Oct. 26, 2006


/RRM
GROUND FLOOR
TRANSFORMER VAULT 3000
(PLAN)

ELECTRONIC
4500
POLYPHASE
METER
PRIMARY CABLE EQUIPMENT
CABINET
TRENCH EXHAUST ACCESS
FAN DOORWAY
2000
4000

MAIN
BREAKER
2000

SECONDARY CABLE 1100 1400 1400 1100


TRENCH
5000
Presentation to IIEE Oct. 26, 2006
/RRM
GROUND FLOOR
TRANSFORMER VAULT 5000
(FRONT ELEVATION) 1100 1400 1400 1100

EXHAUST
FAN

EXHAUST
DUCT
MAIN
BREAKER
3000

DEADFRONT
DT

LOW-VOLTAGE
Presentation to IIEE Oct. 26, 2006 SERVICE CABLES
/RRM
GROUND FLOOR 4000
TRANSFORMER VAULT 2000 2000
(SIDE ELEVATION)

EXHAUST
EXHAUST FAN
DUCT

DEADFRONT

1000
800
TO
DT

2000
LOUVERED
STEEL
1000

DOOR

SETBACK
ACCESS ROAD
(VARIES)
600

900
SERVICE
CABLES

GROUND 700 700 PRIMARY CABLES


PresentationROD
to IIEE Oct. 26, 2006
/RRM 25 25
ELECTRONIC
2ND FLOOR 3000 POLYPHASE
TRANSFORMER VAULT METER
(PLAN) 4500 CABINET PERSONNEL
ACCESS
EXHAUST DOOR
PRIMARY CABLE FAN
TRENCH

STAIRCASE
2500

MAIN
4000

BREAKER
1500

ENTRANCE

1100 1400 1400 1100


SECONDARY CABLE
TRENCH
5000
Presentation to IIEE Oct. 26, 2006
/RRM
4000
2ND FLOOR
1500 2500 TRANSFORMER VAULT
(SIDE ELEVATION)

EXHAUST
FAN

EXHAUST
DUCT

1000
800
TO
DEADFRONT
DT TRANSFORMER
ACCESS DOOR
1000

PRIMARY CABLE
300

900
REINFORCED
CONCRETE
600

LEDGE

400
1300
SECONDARY
700 700
CABLES SETBACK ACCESS ROAD
25 25 (VARIES)

GROUND
ROD
Presentation to IIEE Oct. 26, 2006
/RRM
2ND FLOOR
5000
TRANSFORMER VAULT
(FRONT ELEVATION) 1100 1400 1400 1100

EXHAUST
DUCT
MAIN
BREAKER
3000

DEADFRONT
DT

LOW-VOLTAGE
SERVICE CABLES

Presentation to IIEE Oct. 26, 2006


/RRM
1ST BASEMENT TRANSFORMER VAULT
(GROUND FLOOR PLAN)
200 1500
200

BASEMENT VAULT WALL


HATCHWAY
WITH STEEL COVER
1500

EXHAUST FAN INTAKE FAN


& VENT & VENT

GROUND FLOOR
BUILDING WALL ELECTRONIC
POLYPHASE
METER
CABINET

STAIRCASE

PERSONNEL
ACCESS DOOR
1ST BASEMENT TRANSFORMER VAULT
(PLAN)
4500
HATCHWAY OPENING

2500

PRIMARY
CABLE
TRENCH
4000

MAIN
CIRCUIT
BREAKER
1500

STAIRCASE SECONDARY
CABLE
PERSONNEL TRENCH
ACCESS DOOR

Presentation to IIEE Oct. 26, 2006


/RRM
5000
1ST BASEMENT
TRANSFORMER VAULT
(SIDE ELEVATION)

ELECTRONIC
POLYPHASE ELEVATED
METER HATCHWAY WITH
CABINET STEEL COVER

SETBACK
(VARIES) ACCESS ROAD
EXHAUST
VENT

500

740
1000

400
600

700 700

25

Presentation to IIEE Oct. 26, 2006


/RRM
1ST BASEMENT TRANSFORMER VAULT
(FRONT ELEVATION)

EXHAUST FAN INTAKE FAN


HATCHWAY & VENT & VENT

MAIN
CIRCUIT
BREAKER

3000
SECONDARY
CABLES

1100 1400 1400 1100

LOWEST BASEMENT
GROUND
ROD
Presentation to IIEE Oct. 26, 2006
/RRM
Dead-front Padmounted
Distribution Transformer

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Padmounted DTs

APPROVED LOCATIONS

ð Ground floor

ð Second floor

ð First basement (provided the building has


multiple basements)

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Padmounted DTs
CONSTRUCTION
ð Reinforced concrete walls (‘buhos’), 150-mm
thick
ð Reinforced concrete floor (‘buhos’), 100-mm thick
when in contact with earth, 150 mm when above
another storey
ð No openings such as doors or vents to any part of
the building interior
ð Provided with 150-mm high door sill for liquid
confinement

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Padmounted DTs
ACCESS
ð Doorway directly accessible from the outside of
the building
ð Hatchway for basement installations

ð Dedicated personnel access doorway for


basement and 2nd floor

ð Clear and permanent access road leading to the


vault (at least 6.5 m wide)

ð No overhang or canopy in the immediate vicinity

Presentation to IIEE Oct. 26, 2006


/RRM
Accessibility Problem

WORLD NEWS PUBLICATION, T. PINPIN ST., BINONDO, MANILA

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Padmounted DTs
VENTILATION
ð Louvered vents with a combined net area of
opening not less than 20 sqcm. Per kVA
ð For natural air ventilation, opening shall be on
different sides of the vault (one near the floor and
the other near the ceiling)
ð Where only one side is exposed to outside air,
exhaust fan and duct are required (one exhaust
per bank)
ð Fan shall be temperature controlled (ON at 40°C,
OFF at 36ºC) with by-pass switch for testing
ð Exhaust and intake fan for basement installations

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Padmounted DTs
HOISTING FACILITY

ð Compulsory for 2nd floor installations

ð Shall consist of an I-beam and chain block with


capability of not less than 10 tons

ð Required headroom is 4.0 meters

ð Certification signed and sealed by a registered


structural engineer
ð Customer responsible for the maintenance of the
hoisting facility

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Requirement for Padmounted DTs

MINIMUM VAULT DIMENSION

LOCATION 2-BANKS

(W) 8 m X (D) 4 m
Ground Floor
X (H) 3 m
(W) 8 m X (D) 6 m
2nd Floor
X (H) 4 m
(W) 8 m X (D) 6 m
1st Basement
X (H) 3 m
NOTE: W = Width
D = Depth
H = Height (Headroom)

Presentation to IIEE Oct. 26, 2006


/RRM
Vault Layouts for
Padmounted Transformers

Presentation to IIEE Oct. 26, 2006


/RRM
G/F Transformer Vault
(Double Bank)
CUSTOMER’S MAIN
SECONDARY CIRCUIT
BREAKERS METER #2
METER #1

TRANSFORMER TRANSFORMER
BANK #1 BANK #2

EXHAUST FANS
AND DUCTS

PRIMARY TRANSFORMER
CABLE DUCTS ACCESS DOORS
PLAN

Presentation to IIEE Oct. 26, 2006


/RRM
G/F Transformer Vault

EXHAUST FAN
AND DUCT
CUSTOMER’S
MAIN
SECONDARY
CIRCUIT
BREAKER
TRANSFORMER
ACCESS DOOR

TRANSFORMER

SIDE VIEW

PRIMARY SECONDARY
CABLE DUCTS CABLE
Presentation to IIEE Oct. 26, 2006 DUCTS
/RRM
2/F
Transformer CUSTOMER’S MAIN
Vault SECONDARY CIRCUIT
BREAKERS METER #1 METER #2

(Double Bank)

PRIMARY CABLE TRANSFORMER TRANSFORMER


DUCTS BANK #1 BANK #2

PERSONNEL
ACCESS DOOR
STAIRCASE

EXHAUST HOISTING HOISTING EXHAUST


FAN AND I-BEAM I-BEAM FAN AND
DUCT DUCT

TRANSFORMER
ACCESS DOORS

PLAN
Presentation to IIEE Oct. 26, 2006
/RRM
2/F Transformer Vault

HOISTING I-BEAM
EXHAUST FAN
AND DUCT

TRANSFORMER
ACCESS DOOR

HOISTING
FACILITY
PERSONNEL
ACCESS

TRANSFORMER
DOOR
CUSTOMER’S
MAIN
SECONDARY
CIRCUIT
BREAKER

GROUND GRID

SECONDARY CABLE DUCTS

SIDE VIEW
Presentation to IIEE Oct. 26, 2006
/RRM
1/B Transformer
Vault with Hatchway
PERSONNEL
ACCESS
DOOR

AIR INTAKE
FAN & VENT

HATCHWAY
STAIRCASE

AIR EXHAUST
METER
FAN & VENT

PLAN
Presentation to IIEE Oct. 26, 2006
/RRM (Ground Floor)
1/B Transformer
Vault with Hatchway

PERSONNEL
ACCESS ELEVATED
DOOR HATCHWAY
WITH STEEL
COVER

AIR AIR
INTAKE EXHAUST
FAN FAN
STAIRCASE

TRANSFORMER

GROUND GRID SECONDARY


CABLE DUCTS
LOWEST BASEMENT

SIDE VIEW
Presentation to IIEE Oct. 26, 2006
/RRM
Presentation to IIEE Oct. 26, 2006
/RRM
2/F Transformer
Vault with CUSTOMER’S MAIN
SECONDARY CIRCUIT
METER #1 METER #2
Hatchway BREAKERS

(Double Bank)

PRIMARY CABLE TRANSFORMER TRANSFORMER


DUCTS
BANK #1 BANK #2

PERSONNEL
ACCESS DOOR
STAIRCASE

EXHAUST FAN AND DUCT


EXHAUST FAN AND DUCT

HOISTING I-BEAM

HOISTING I-BEAM
HATCHWAYS

PLAN
Presentation to IIEE Oct. 26, 2006
/RRM
2/F Transformer
Vault with Hatchway

HOISTING I-BEAM
EXHAUST FAN
AND DUCT

CUSTOMER’S
MAIN HOISTING
SECONDARY FACILITY
CIRCUIT PERSONNEL
BREAKER
TRANSFORMER
ACCESS
DOOR

HATCHWAY

GROUND GRID

SECONDARY CABLE DUCTS

SIDE VIEW
Presentation to IIEE Oct. 26, 2006
/RRM