TPM Club India


TPM Club India Jishu Hozen Pillar

THEME - COMPRESSED AIR LOSSES


IDEA - NO COMPRESSED AIR LOSSES
LEAKEGES LEVEL ON 2ND. MARCH.2004 - 174 CFM
DESIRED LEVEL BY 2ND.MARCH 2005 - 30 CFM
LEVEL ACHIEVED IN MARCH.2005 - 29.0 CFM
LEVEL ACHIEVED IN MARCH 2006 - 22.2 CFM
TARGET LEVEL BY NOV’06 - 15.0 CFM

COMPRESSOR CAPACITY - 250 CFM


VALIDATED CAPACITY - 239 CFM

TPM Club India


TPM Club India Jishu Hozen Pillar

200
174 174 Target- Industry best air losses - 30 cfm by march`05
180 Leading target - 10 cfm by mar`07

160

140 115

120

100 75

70
80 64
5353 51 25.2
60 51
43
24.7
24.5 24.5 23.5 23.2 22.3
29 29 24.5
40 29

20
24.5 23.2
0 apr`0 may`0 jun`0 sep`0 oct`0 nov`0 dec`0 jan`0 feb`0 M ar.0 M ay.0 June. Aug.0 Sep.0 Oct`0 Nov` Jan.0 Feb.0 M ar.0
jul`04 Jul.05
4 4 4 4 4 4 4 5 5 5 5 05 5 5 5 05 6 6 6
CFM 174 174 115 75 64 53 53 51 51 43 29 29 25.2 24.7 24.5 24.5 24.5 24.5 23.2 23.2 22.3
TPM Club India Jishu Hozen Pillar

ROOT CAUSE OF AIR LOSSES .

(1) LONG LENGTH FLEXIBLE PIPE USED FOR PIPE CONNECTIONS

( 2 ) THREADED PIPE JOINTS USED IN AIR LINE

( 3 ) PIN TYPE QUICK RELEASE COUPLING USED

( 4 ) AIR BLOW GUN OF 6 MM ORIFICE SIZE USED

( 5 ) IN AUDIBLE LEAKAGES IN OVER HEAD LINE

( 6 ) USE OF AIR FOR CHIPS REMOVAL

( 7 ) MULTIPLE JOINTS / BEND IN AIR LINE


(8) NO SYSTEM OF AIR CONSUMPTION MEASUREMENT

(9) longer air circuits


TPM Club India Jishu Hozen Pillar

EQUIPMENT PERFORMANCE VALIDATION ( COMPRESSOR GA-30)

COMPRESSOR CAPACITY -160 CFM

METHOD ADOPTED - PUMP UP TEST


TEST CARRIED OUT JOINTLY BY M/S.DEVKI-ENERGY CONSULTANTS & EICHER

COMPRESSOR MODEL - GA30 C

VOLUME OF RECEIVER / OIL SEPERATOR /MOISTURE SEPERATOR/PIPINGS - 64.54 CFT

INITIAL PRESSURE - 5KG/CM2

FINAL PRESSURE - 6 KG/CM2 Capacity ( cfm ) =(Pinitial - Pfinal ) * volume cft *


time ( seconds )
VOLUME-- 64.54 CFT

TIME TAKEN IN PRESSURE BUILDING - .42 MINUTES

CAPACITY ARRIVED - 153 CFM

SITE TESTING ERRORS +/- 5% ( AS PER DEVKI CONSULTANTS )

VALIDATED CAPACITY 160 CFM


TPM Club India Jishu Hozen Pillar

COMPRESSOR CAPACITY -250 CFM

METHOD ADOPTED - PUMP UP TEST


TEST CARRIED OUT JOINTLY BY M/S.DEVKI-ENERGY CONSULTANTS & EICHER

COMPRESSOR MODEL - GA45W

VOLUME OF RECEIVER / OIL SEPERATOR /MOISTURE SEPERATOR/PIPINGS - 64.54 CFT

INITIAL PRESSURE - 5KG/CM2

FINAL PRESSURE - 6 KG/CM2 Capacity ( cfm ) =(Pinitial - Pfinal ) * volume cft *


time ( seconds )
VOLUME-- 64.54 CFT

TIME TAKEN IN PRESSURE BUILDING - .27 MINUTES

CAPACITY ARRIVED - 239 CFM

SITE TESTING ERRORS +/- 5% ( AS PER DEVKI CONSULTANTS )

VALIDATED CAPACITY 250 CFM


TPM Club India Jishu Hozen Pillar

PLANT AIR LEAKAGE TESTING


DROP DOWN TEST
COMPRESSOR --GA45 DATE
Feb.2004
28 .11.04

CONDITION TIME LOAD/UNLOAD TIME

LOADING 03.43.03
134
UNLOADING 03.45.17
45
LOADING 03.46.02
136
UNLOADING 03.48.18
45
LOADING 03.49.03
136
UNLOADING 03.51.19
45
LOADING 03.52.04

TOTAL -LOADING 407


TOTAL-UNLOADING 135
TOTAL TIME 542

LOADING TIME x 239


LEAKAGE IN CFM =
TOTAL TIME

= 407 * 239 / 542 = 179 cfm


TPM Club India Jishu Hozen Pillar

PLANT AIR LEAKAGE TESTING


DROP DOWN TEST
COMPRESSOR --GA45 DATE 15.01.2006

CONDITION TIME LOAD/UNLOAD TIME


(IN SECONDS)
UNLOADING 16.18.43
302
LOADING 16.23.45
31
UNLOADING 16.24.16
304
LOADING 16.29.20
32
UNLOADING 16.29.52
307
LOADING 16.35.59
30
UNLOADING 16.36.29
306
LOADING 16.42.35
31
UNLOADING 16.43.06
303
LOADING 16.49.09
32
UNLOADING 16.49.41
LOADING TIME x 239
LEAKAGE IN CFM =
TOTAL TIME
= 2.60X250 / 27.97
= 22.2 cfm
TPM Club India Jishu Hozen Pillar

AIR BLOW GUN


BEFORE AFTER

LEGRIS make air blow gun PILOT make air blow gun used
used - high consumption of - low consumption of air
air
TPM Club India Jishu Hozen Pillar

BEFORE
AIR BLOW GUN
AFTER

Air blow gun connected with Air blow gun connected with
jublee clamp - air leakages point leakproof quick fittings to .
TPM Club India Jishu Hozen Pillar

AIR BLOW GUN Date-21.09.04


BEFORE
AFTER

Air pipe connected with jublee Air pipe connected with leakproof
clamp - air loss point quick fittings to prevent air loss.
TPM Club India Jishu Hozen Pillar

Date-
QUICK RELEASE COUPLING 21.10.2004
BEFORE AFTER

QRC - Roller type sealing QRC - ball type sealing


TPM Club India Jishu Hozen Pillar

ULTRASONIC AIR LEAKAGE


Date-17.08.04
DETECTOR

ULTRASONIC AIR LEAKAGE DETECTOR


USED TO DETECT INAUDIBLE LEAKAGES
TPM Club India Jishu Hozen Pillar

ULTRASONIC AIR LEAKAGE


Date-17.08.04
DETECTOR

ULTRASONIC AIR LEAKAGE DETECTOR USED TO


DETECT INAUDIBLE LEAKAGES
TPM Club India Jishu Hozen Pillar

AIR FLOW METER WITH TOTALIZER

AIR FLOW METER WITH TOTALIZER INSTALLED IN COMPRESSED


AIR CIRCUIT - REGULAR MONITORING OF AIR CONSUMPTION
TPM Club India Jishu Hozen Pillar

Date-21.09.04
COMPRESSED AIR LINE

Air pipe connected with jublee clamp - Air pipe connected with thread joints -
air leakages point air leakages point
TPM Club India Jishu Hozen Pillar

COMPRESSED AIR LINE


Date-21.09.04

Air pipe with welded leakproof quick fittings.


QUICK RELEASE COUPLING
TPM Club India Jishu Hozen Pillar

Date-21.09.04

BEFORE AFTER

QRC - ROLLER TYPE GRIPP QRC -BALL TYPE GRIPP


TPM Club India Jishu Hozen Pillar

QUICK RELEASE COUPLING Date-


21.05.05

QRC WITH MULTIPLE JOINTS QRC WITH SINGLE JOINT


SOURCE OF AIR LEAKAGES NO AIR LEAKAGE
TPM Club India Jishu Hozen Pillar

COMP.AIR POWER CONS./Eq.ENGINE

9
8 38818
7
6 40111 37791
34744
5
4
3
2
1
0
June'0
023 034 045 Apr.05 May.05 July05 Aug'05 Sep.05 Oct.05 Nov.05 Dec.05 Jan.06 Feb.06
5

Series1 7.72 4.8 3.72 3.38 3.57 4.12 3.73 3.49 3.17 2.67 2.98 3.3 2.65 3
TPM Club India Jishu Hozen Pillar

COMP.AIR COST/ Eq. ENGINE


45
40
35
30
25
20
15
10
5
0
APR.0 MAY.0 JUNE.0 JULY0 AUG'0 OCT`0 NOV`0
023 034 045 SEP`05 DEC.05 JAN'06 FEB.06
5 5 5 5 5 5 5

Series1 38.5 24 21.7 18.59 19.63 22.66 20.5 19.18 17.46 13.6 17.88 18.15 16.43 18.5
TPM Club India Jishu Hozen Pillar

AIR CONS.IN Ft.3/Eq.ENGINE

600

500

400

300

200

100

0
APR.0 MAY0 JULY0 AUG'0 OCT`0 NOV.0
023 034 045 JUN.05 SEP`05 DEC.05 JAN.06 FEB.06
5 5 5 5 5 5

Series1 478 297 236 158 174 180 177 167 155 142 164 174 137 153
TPM Club India Jishu Hozen Pillar

FOCUSSED IMPROVEMENT ( KOBETSU -KAIZEN )

COMPRESSED AIR LEAKEGES ELIMINATION

METHODOLOGY ADOPTED - GAMBA APPROACH

TARGET : TO BECOME INDIAN INDUSTRY BEST BY MAR.' 05 ( > 90% utilisation)


. TO BECOME WORLD CLASS IN COMPRESSOR UTILISATION ( > 92% utilisation) BY-Mar.'06
PLANT TO OPERATE WITH 160 CFM COMPRESSOR ( 250 CFM TO DISCONTINUE BY MAR.06 )
ACTIVITY INDEX ACTIVITY RESULT INDEX MANAGEMENT INDEX

Identification of air leakeges areas Reduction in mfg.var.cost(power) Saving of 182953 units (Kwh)

Esteblishment of real cause 2.92 Units /eq.eng in - 034 Saving of Rs. 10 - Lac

Real solution to leakeges 1.08 units/eq.eng in - 045

Elimination of compressed air leakeges 0.72 Units/eq.eng in - 056

Sustainance thru ultrasonic scanning


TPM Club India Jishu Hozen Pillar

OPTIMUM UTILISATION OF AIR COMPRESSOR


487 CFM- 90 kW
250 CFM- 50 kW

160 CFM - 30 kW

Before

Before

After
TPM Club India Jishu Hozen Pillar

STEPS FOR SUSTAINANCE

REPLACEMENT OF THREADED JOINTS WITH


WELDABLE JOINTS. ( PERMANENT MEASURE)
ULTRASONIC TEST OF AIR CIRCUITS.
STANDRADIZATION OF SPARES ( PU-PIPES /QRC/AIR
GUNS )
OPERATOR’S AUTONOMOUS CHECK POINT