Você está na página 1de 24

PROBLEM- Design the pavement for construction of a new flexible

pavement with the following data:


DATA (i) Four lane divided carriageway
(ii) Initial traffic in the year of completion of construction = 5000 CV/day
(Sum of both directions)
(iii) Traffic growth rate per annum = 6.0 per cent
(iv) Design life = 20 years
(v) Vehicle damage factor = 5.2 (Based on axle load survey)
(vi) CBR of soil below the 500 mm of the subgrade = 3 per cent
(vii) CBR of the 500 mm of the subgrade from borrow pits = 10 per cent
Using IRC 37
PROBLEM:
Design the pavement for construction of a new bypass with the
following data:
1. Two lane carriage way
2. Initial traffic in the year of completion of construction = 1000CVPD
(sum of both directions)
3. Traffic growth rate = 7.5 %
4. Design life = 15 years
5. Vehicle damage factor based on axle load survey = 2.5 standard axle
per commercial vehicle
6. Design CBR of subgrade soil = 4%.
MoRTH SPECIFICATIONS :

SECTION 100 : GENERAL.

SECTION 400 : SUB-BASES, BASES ( NON BITUMINOUS).

SECTION 500 : BASE & SURFACE COURSE


(BITUMINOUS).

SECTION 600 : CONCRETE PAVEMENT.

SECTION 700 : GEOSYNTHETICS.

SECTION 900 : QUALITY CONTROL FOR ROAD WORKS.

SECTION 112 : ARRANGEMENT OF TRAFFIC DURING


CONSTRUCTION .

SECTION 121 : FIELD LABORATORY.


SECTION 400 SUB-BASES, BASES ( NON BITUMINOUS).

401 : GRANULAR SUB-BASE.

402 : LIME TREATED SOIL FOR IMPROVED SUB-BASE.

403 : CEMENT TREATED SOIL SUB-BASE / BASE.

404 : WATER BOUND MADACAM SUB-BASE / BASE.

405 : CRUSHED CEMENT CONCRETE SUB- BASE / BASE.

406 : WET MIX MACADAM SUB-BASE / BASE.

407 : SHOULDERS, ISLANDS AND MEDIAN.


2
408 : CEMENT CONCRETE KERB AND KERB WITH
CHANNEL.

409 : FOOT PATHS AND SAPERATORS.

410 : CRUSHER-RUN MACADAM BASE.

3
SECTION 500: BASE AND SURFACE COURSES
(BITUMINOUS).
501 : GENERAL REQUIREMENTS FOR BITUMINOUS
PAVEMENT LAYERS.

502 : PRIME COAT OVER GRANULAR BASE.

503 : TACK COAT.

504 : BITUMINOUS MACADAM.

505 : BITUMINOUS PENETRATION MACADAM.

506 : BUILT-UP SPRAY GROUT.

507 : DENSE GRADED BITUMINOUS MACADAM.


4
508 : SEMI-DENSE BITUMINOUS CONCRETE .

509 : BITUMINOUS CONCRETE.

510 : SURFACE DRESSING.

511 : OPEN-GRADED PREMIX SURFACING.

512 : CLOSE GRADED PREMIX SURFACING / MIXED


SEAL SURFACING.

513 : SEAL COAT.

514 : SUPPLY OF STONE AGGREGATES.


5
515 : MASTIC ASPHALT .

516 : SLURRY SEAL.

517 : RECYCLING OF BITUMINOUS PAVEMENT.

518 : FOG SPRAY.

519 : BITUMINOUS COLD MIX

520 : SAND ASPHALT BASE COURSE.

521 : MODIFIED BINDER.

522 : CRACK PREVENTION COURSES .

6
• 112 Arrangement of Traffic during construction.
• 200 mm GSB
• 25 mm WBM, MSS
• 121 Field laboratory
• General equipment
• For Soil & Aggregate
• For Bitumen & Bituminous concrete
• For cement & cement concrete
• 305 Embankment construction
• Density of compacted layer 1.52 to 1.75 gm/cc
• 401 GSB
• Natural sand, Moorum, gravel, crushed stone or
combination.
• Grading – 75- 0.075, Grading I, II & III
• PI < 6%, LL < 25%
• Upto to 100 mm- Smooth wheeled roller of 80- 100 KN
• Upto 225 mm- Vibratory roller.
GRADING FOR CLOSE GRADED GRANULAR SUB-BASE MATERIALS

IS Sieve Designation Per cent by weight passing the IS sieve


Grading I Grading II Grading III
75.0 mm 100 - -
53.0 mm 80-100 100 -
26.5 mm 55-90 70-100 100
9.50 mm 35-65 50-80 65-95
4.75 mm 25-55 40-65 50-80
2.36 mm 20-40 30-50 40-65
0.425 mm 10-25 15-25 20-35
0.075 mm 3-10 3-10 3-10
CBR value (minimum) 30 25 20
GRADING FOR COARSE GRADED GRANULAR SUB-BASE MATERIALS

IS Sieve Designation Per cent by weight passing the IS sieve


Grading I Grading II Grading III
75.0 mm 100 - -
53.0 mm - 100 -
26.5 mm 55-75 50-80 100
9.50 mm - - -
4.75 mm 10-30 15-35 25-45
2.36 mm - - -
0.425 mm - - -
0.075 mm <10 <10 <10
CBR value (minimum) 30 25 20
STEPS:-
1. Construction Operation-
i)- Preparation of sub base.
ii)- Spreading and compacting
2. Surface finish and quality control of work
3. Arrangement of traffic
4. Measurement of for payment
5. Rates
404 WBM
I.V.- 30% (Max.), Combined FI & EI 30% (Max.)
Thickness of each layer 100 mm G1 (90mm–45mm)
G2(63-45mm) G3(53-22.4mm) Screening A&B
GRADING REQUIERMENTS OF COARSE AGGREGATES
(FOR WBM)
Grading No. Size range IS Sieve Designation Per cent by weight passing

1. 90 mm to 45 mm 125 mm 100
90 mm 90-100
63 mm 25-60
45 mm 0-15
24.4 mm 0-5
2. 63 mm to 45 mm 90 mm 100
63 mm 90-100
53 mm 25-75
45 mm 0-15
22.4 mm 0-5
3. 53 mm to 22.4 mm 63 mm 100
53 mm 95-100
45 mm 65-90
22.4 mm 0-10
11.2 mm 0-5
GRADING FOR SCREENINGS for WBM

Grading Size of screenings IS sieve designation Per cent by weight


classification passing the IS sieve

A 13.2 mm 13.2 mm 100


11.2 mm 95-100
5.6 mm 15-35
180 micron 0-10
B 11.2 mm 11.2 mm 100
5.6 mm 90-100
180micron 15-35
STEPS:
1. Preparation of base
2. sub-surface drainage layer
3. Lateral confinement of aggregates
4. Spreading coarse aggregates
5. Rolling
6. Application of screenings
7. Sprinkling of water and grouting
8. Setting and drying
WMM:
GRADING REQUIREMENT OF A AGGREGATES FOR WMM

IS SIEVE DESIGNATION PER CENT BY WEIGHT PASSING


THE IS SIEVE

53.00 mm 100
45.00 mm 95-100
26.50 mm -
22.40 mm 60-80
11.20 mm 40-60
4.75 mm 25-40
2.36 mm 15-30
600.00 micron 8-22
75.00 micron 0-8
PRIME COAT
•work consist of application of single coat of low viscosity
liquid bituminous material.
• the primer shall be cationic bitumen emulsion SS1 grade
conforming to IS:8887 or medium curing cutback bitumen
conforming to IS;217 or as specified in contract.
VISCOSITY REQIUREMENT AND QUANTITY OF LIQUID BITUMINOUS PRIMER

Type of surface Kinematics viscosity of Quality of liquid


Primer at 60 C Bituminous Material per
(Centistokes) 10 Sq.m.
(kg)

Low porosity 30-60 6 to 9


Medium porosity 70-140 9 to 12
High porosity 250-500 12 to 15
• 503 Tack coat
• To ensure bond between new & old construction.
• Emulsion as per IS 8887.
CONSTRUCTION-
1. Equipment
2. Preparation of base
3. Application of tack coat
4. Curing of tack coat
TYPE OF SURFACE RATE OF SPRAY OF BINDER IN kg/sq.m

Bituminous surface 0.20-0.30

Granular surface treated with primer 0.25-0.30

Cement concrete pavement 0.30-0.35


504 BM
G1 80-100 mm thickness 45 – 0.075 mm,
Bituminous percentage 3.1 – 3.4 %
G2 50-75 mm thickness 26.5 – 0.075 mm,
Bituminous percentage 3.3 – 3.5 %
Bitumen grade 35 to 90.
Contains 20 – 25 % voids.
Manufacturing & Rolling Temperature.

Você também pode gostar