Group no: 1
Design and Construction Management Consultancy of a
Multi-Speciality Hospital
15 March 2018
• Introduction
• System approach
• Work definition
• Scheduling
1 System Inputs
Purposeful X(t) Table 2.1: System inputs X(t)
(i)Controllable
(ii)Uncontrollable
2 Environmental Parameters
E(t) Table 2.2:Environmental parameters E(t)
Inputs from Environment
Outputs to Environment
4 System Outputs
Y(t) Table.2.4: System outputs, y(t)
Desired
Undesired
Objective
• To build a 300 bedded multi speciality hospital
• Specialties : Brain, Spine, Joints, with a high level Trauma Centre, supported by Cardiac practice
• Scope of work : Design and Construction management consultancy
• Project cost : INR 175 Crores
• Duration : 24 months – Design (6 months) and Construction management consultancy (18 months)
The work of Multi speciality hospital is broken down to two subsystems - design and
construction management consultancy
HR SPECIALIST
DOCTORS
HOSPITAL MANAGEMENT
SENIOR ARCHITECT
IT
SUB-CONSULTANT
SENIOR ARCHITECT
ASST.
ADMIN
JUNIOR ARCHITECT
EXCAVATION PROTECTION
STRUCTURAL
ELECTRICAL
Project Manager
Subconsultants
Code Description of Work package Architecture
Kitchen
Medical Plumbing &
Architect Draughtsman Quantity surveyor Landscape EIA LEED Structure Electrical HVAC ELV and BIM
Physicist Firefighting
laundry
Project Manager
Subcontractors
Description of Work
Code Client Archemidies
package
Planner & Admin Procurem Commissi
Contract Quality Firefighti Engineer Engineer
Civil Quantity and Electrical HVAC Plumbing ELV ent oning
specialist manager ng (Interior) (Exterior)
surveyor financer manager engineer
C1 Pre construction
A P P P P
C2 During construction
N P P P P P P P P P P P
C3 Post Construction A P P P S S S S S S S P
Administration and
C4
financing P
TL=21 TL=21
Group1- Multi Speciality Hospital 17
Master Schedule for CMC of multi speciality hospital
Total
Code Description of Work package duration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Months
C1 Pre construction 2.25
C2 During construction 12.75
C3 Post Construction 3
C4 Administration and financing 18
TL=11.4
TE=8.4 TL=11.4 TL=12.4 TL=13.4 TL=14.4 TL=15.4
TL=10.4 TE=9.4 TE=10.4 TE=11.4 TE=12.4 TE=13.4
TE=8.4
TL=10.4
TE=7.4
TL=9.4 TL=11.4 TL=12.4 TL=13.4 TL=14.4
TL=9.4 TE=7.4 TL=10.4 TE=9.4 TE=10.4 TE=11.4 TE=12.4 TE=13.4
TE=8.4 TE=14.4
TE=6.4
TL=8.4 TL=15.4
TL=8.4 TE=6.4 TL=9.4 TL=11.4 TL=12.4 TL=13.4 TL=14.4
TE=5.4 TE=7.4 TE=9.4TL=10.4 TE=10.4 TE=11.4 TE=12.4 TE=13.4 TE=14.4
TL=1.9 TL=8.4 TL=9.4
TE=1.9 TE=4.4 TL=7.4 TE=6.4 TE=8.4
TL=4.4 TE=5.4 TE=9.4 TE=10.4 TE=11.4 TE=12.4 TE=13.4 TE=14.4
TL=0 TL=0.25 TL=0.65 TL=0.68 TL=1.18 TL=8.4
TE=0 TE=0.25 TE=0.65 TE=0.68 TE=1.18 TL=1.43 TE=7.4
TE=1.43 TE=5.4 TL=7.4
TE=6.4 TE=8.4 TL=10.4 TL=11.4 TL=12.4 TL=13.4 TL=14.4
TL=5.4 TL=9.4
TL=1.9
TE=1.9 TE=13.4
TL=6.4 TE=6.4 TE=7.4
TE=1.5 TE=6.4 TL=8.4 TL=15.4 TL=15.4
TL=8.4 TL=1.9 TE=13.4
TE=8.4 TL=7.4 TL=7.4
TL=8.4 TL=7.4 TE=6.4 TE=14.4
TE=8.4 TE=7.4 TL=15.4 TL=14.4 TL=15.4
TE=7.4 TL=10.4 T L=13.4 TE=12.4 TE=13.4
TL=8.4 TL=8.4 TE=8.4 TE=11.4
TE=8.4
TL=10.4 TL=11.4 TL=12.4 TL=13.4
TL=9.4 TE=9.4 TE=10.4 TE=11.4 TE=12.4
TL=9.4 TE=8.4
TE=9.4 TE=8.4
TL=9.4 TL=10.4 TL=11.4 TL=12.4 TL=13.4 TTE=L=13.4 TE=15.4
TE=9.4 14.4 TE=14.4 TL=15.4 TL=15.4
TE=10.4 TE=11.4 TE=12.4 TE=14.4 TL=15.4
TL=11.4 TL=12.4 TL=13.4 TE=14.4 TL=15.4
2 Event TL=10.4 TE=11.4 TE=12.4 TE=13.4 TE=14.4 TE=15.4
TE=10.4 TL=14.4
TE=17.0 TE=16.9
D2.a Activity TL=17.0 TE=16.9
TE=14.4 TL=18.0 TL=18.0
4 Duration of the TE=14.4 TE=14.4
TE=14.4 TE=18.0
activity in months TL=18.0
TE Earliest expected time TE=15.4
TE=15.4
TL Latest allowable time TE=14.4 TE=14.4 TTE=13.4
L=13.4
TL=8.4 T L=10.4
Events for which TE = TL TE=18.0
Critical Path 1 TE=15.4 TL=18.0
Critical Path 2 TL=18
Critical Path 3 TL=18 TE=18
TE=15.4
Critical Path 4 TE=18 101a TL=15.4 Group1- Multi Speciality Hospital 20
101b