This document is a proposal for constructing a 3 story educational building with 30 classrooms and 4 staff rooms.
The key details are:
1. The total project cost is approximately 34 crore rupees.
2. The building will have a ground floor plus 3 additional floors.
3. Foundations will be constructed using strip footings due to the low bearing capacity of the soil.
This document is a proposal for constructing a 3 story educational building with 30 classrooms and 4 staff rooms.
The key details are:
1. The total project cost is approximately 34 crore rupees.
2. The building will have a ground floor plus 3 additional floors.
3. Foundations will be constructed using strip footings due to the low bearing capacity of the soil.
This document is a proposal for constructing a 3 story educational building with 30 classrooms and 4 staff rooms.
The key details are:
1. The total project cost is approximately 34 crore rupees.
2. The building will have a ground floor plus 3 additional floors.
3. Foundations will be constructed using strip footings due to the low bearing capacity of the soil.
MR NISHANT RANA MOHD SALMAN H.O.D. CIVIL DEPARTMENT ROLL NO.: 1628200026 INTRODUCTION Purpose
This paper purposes to construct a three
story educational building which includes 30 classes and 4 staff room. This educational building is design to create a soothing environment bringing the comfort of school life in the urban area. 1. Project cost is near about 34 crore 2. The Building G+3 Floor 3. Educational Building Help of JCB machine at the required depth(1300mm from ground surface) Levelling of excavated soil surface • 100mm thickness • Grade M10(1:4:8) • Use of machine mixing • Placing as well as leveling • Concrete (M25, grade) • Steel (Fe 415 grade) • Water ( used for curing , mixing , soil compaction, grouting) Column layout on pcc by the help of total station According to drawing Reinforcement Placements of Column
Reinforcement Placements of Column according
to design SHUTTERING & CASTING
Column casting Column shuttering This foundation are used in following cases-
1.When the bearing strength of soil is very low
2.Characteristics of soil changeable 3.Soil strata should be loose like as marchland 4.Avoiding the differential settlement of building It is more economical and simple as compare to pile foundation. • THE MAIN BAR & DISTRIBUTION BAR HAVE 30MM DIA AT BOTTOM NET. • AS THE PROCESS FOR TOP NET & FOR SEPRATION THESE NET CHAIRS ARE USED • CHAIR IS THE STEEL BAR THAT USED TO SEPRATED THE TOP AND BOTTOM NET. • FIXED THE COLUMN REINFORCEMENT AT THE POSITION OF COLUMNS AND BOUNDED BY THE 24GAUGE WIRE. • COLUMN HAVE 16 NOS. @ 30MM DIA. • LAP LENGTH OF COLUMN 50D OF BAR. • (IN CASE OF USED DIFFERENT DIA OF BAR LAP LENGTH IS PROVIDED ACCORDING TO GREATER DIA OF BAR.) • VERTICAL TIESE PROVIDED 10MMØ @150MM C/C. • AFTER MIXING THE CONCRETE FROM CONCRETE PLANT , IT SOULD PLACED ON SITE WITH HELP OF PIPE LINE. • FOR COMPACTING USED NEEDLE VIBRATOR 1MIN. AT A PLACE . • GENERALLY VIBRATOR HAVE 4000CYCLE/MIN. • DIA OF VIBRATOR NEEDLE HAVE 60MM. • Layout of column • Reinforcement (according to drawing) • Shuttering • Checking of shuttering in inclination with help of plumb-bob • Testing of material at site(cube test, slump test) • Concreting • Needle vibrator used max 1 min. in a place • CUBE USED TO CHECK THE COMPRESSIVE STRENGTH OF CONCRETE • SIZE OF CUBE 15CM ×15CM ×15CM • AFTER 28 DAYS CURING OF CUBE, FIXED IN THE COMPRESSION MACHINE AND CHECK THE COMPRESSIVE STRENGTH. • SUTERING OF SLAB AND BEAM DONE AT SAME LEVAL. • GENERALLY SUTTERING HAVE USED OF – PLYWOOD , STEEL PLATE, MATELIC PROP. PROVIDED 8MMØ @65MM C/C IN SLAB. PROVIDED 3NOS.20MMØ IN TENSION ZONE & 2NOS. IN COMPRESSION ZONE IN BEAM. PROVIDED EXTRA REINFORCEMENT AT EACH END OF SPAN TO RESIST THE SHEAR FORCE.(3NOS. 16MMØ @ LENGTH L/7) PROVIDED VERTICAL STRRIPS AT 150MM C/C IN BEAM. AFTER REINFORCEMENT USED THE CONCRETING PROCESS. • Lap length 47 time of main bar dia. • Column cover 40mm • 1/3 bars to be overlapped at one location • Tie bars dia.- 12mm • Spacing at beam column connection joint- 100m c/c • Column will not be cast much than 2m height.