STAGE I STAGE II ------5 X 200 MW 2 X 500 MW
WATER SOURCE --- RIHAND DAM COAL SOURCE --- JAYANT MINES
CW COMPLEX
MAIN PLANT
CHP
TRACK HOPPER
CRUSHER HOUSE
COAL MILL
GT AREA
TG & AUX.
21 / 400 KV
15.75 / 400 KV
Turbine (200 MW ) --HP Turbine ---- 12 Stages IP Turbine ---- 11 Stages LP Turbine ---- 4 x 2 Stages
HP
IP
LP
G E N
Condenser
CONDENSER Condensate Extraction Pump (CEP) Gland Steam Condenser (GSC) LP Heaters (LPH) Drain Cooler (DC) Deaerater (D/A) Boiler Feed Pump (BFP) HP Heaters (HPH) Continued ---
TG & Auxiliaries
DMCW PUMP ARCW PUMP Plate Heat Exchanger (PHE) Vacuum Pump
To be continued ----
TG & AUXILIARIES
MAIN OIL TANK
AOP-1 AOP-2 DC LOP JOP-1 JOP-2 DC JOP
PA FAN FD FAN ID FAN COAL MILLS (XRP 1003 / 803) SEAL AIR FANS ESP BCW PUMPS
COLD REHEAT
Pressure ---- 45 Ksc
Temperature
Pressure
--
170 Ksc
HOT REHEAT
Temperature -537 Deg C
Pressure
-- 40.5 Ksc
IP-LP CROSS-OVER
TEMPERATURE -302 Deg C
PRESSURE
--
7.57 Ksc
HP
IP
LP
G E N
CONDENSER
Pressure
--
130 Ksc
COLD REHEAT
Pressure ---- 25 Ksc
Temperature
HOT REHEAT
Temperature -535 Deg C
Pressure
-- 24.5 Ksc
IP-LP CROSS-OVER
TEMPERATURE -172 Deg C
PRESSURE
--
1.2 Ksc
FD FANS
SAPH
WIND BOX
To MILL PA FANS
PAPH
MILL
Hotwell
CEP
LPH
D/A
DRUM
ECO
HPH
BFP
Chimney
ESP
ID FANS
PASS
ELECTRODES
---
4/4
COLLECTING / EMITTING
FIELDS
--
56 / 24
STEAM
Flue Gas
DRUM
LTSH
DIVISIONAL SH
PLATEN SH
HPT
CONDENSER
LPT
IPT
REHEATER
HOTWELL
HP BYPASS OPERATION`
RAISING OF STEAM PARAMETER DURING TURBINE ROLLING PARALLEL OPERATION WITH TURBINE ON LOAD REJECTION PREVENTING SAFETY VALVES OPENING AT RAISED STEAM PRESSURES.
BP-2
BD
BFP DISCHARGE
CRH LINE
BP
BDE
BD
Injection water Pr. > 25 Ksc Exhaust steam Pr. < 19 Ksc Condenser Wall Temp. < 90 DegC Condenser Vacuum > -0.8 Ksc
HRH LINE
LBP-2
LBPE-4
LBPE-3
HRH LINE
LBP-2
NRV
ACI
ON / OFF AUTO / MANUAL SELECTOR CONTROL OIL
MAX GATE
SLIDING SET POINT FUNCTION GENERATOR 1st Stage Throttle Pr.
LPBP EHC
HRH PR.
SIGNAL OIL
REHEAT PROTECTION
Turbine Trips & HP-LP bypass does not open. It will trip the Boiler after 5 Sec of turbine trip.
GROUPS
ACTION BUTTON
AOP OFF
210
240
540
600
2850
3000
(RPM)
BARRING SPEED
B/G OFF
JOP OFF
( START-UP ) START-
SHUT-DOWN STARTS
BARRING GEAR ON
3000
2850
510
210 ( RPM )
JOP-1 STARTS IF JOP-1 FAILS TO START AFTER 5 Sec. JOP-2 STARTS IF PR. < 110 Ksc.
BOILER DRUM
DP = 1.71 Ksc