Escolar Documentos
Profissional Documentos
Cultura Documentos
Corporate Overview Solutions and Systems Overview Nu Flow Advantages Customers and Projects Structural Pipe Lining Overview Pipe Lining Process Pull-in-Place Lining Benefits Drain Lining Jobs Completed Epoxy Pipe Lining Overview Pipe Renewal and Coating Process Epoxy Coating Benefits Epoxy Lining Jobs Completed Satisfied Customers Resources
Corporate Overview
Headquarters: Manufacturing: Sales Offices: Employees: Intellectual Property: Solution History: Channels: Markets: Customers: San Diego, California, USA Toronto, Ontario, Canada Atlanta, GA; Orange County, CA; San Diego, CA; Sarasota, FL; Toronto, ON 150+ 26 patents & licenses Epoxy coatings since 1987 Structural pipe liners since 1998 Indirect: 250+ franchisees and licensees Direct: National and regional account managers Commercial, industrial, federal, municipal, residential Owners and property managers of hotels, multi-unit residential buildings, hospitals, schools, office buildings, manufacturing facilities, utilities, municipal buildings, military bases and ships, homes and more.
Mission Statement
Nu Flow will provide its cohesive network of licensees and clients with unique, versatile and affordable pipe lining solutions,
Corporate Offices
Nu Flow, Toronto
Sales, Installations, R&D, Manufacturing and Corporate Support Services
Nu Flow, Sarasota
Sales and Installations
Nu Flow, Atlanta
Sales and Installations
Any PipeAnywhere
Structural Pipe Lining Solutions Pipe Renewal and Coating Solutions
Epoxy Coatings
Galvanized Steel
Copper Pipe
Nu Flow Rehabilitation
Less disruptive and faster than traditional pipe repair or replacement Avoids destruction of buildings, hardscapes and landscapes and associated reconstruction costs Long-term solution to prevent future problems Solves the most challenging pipe situations
Nu Flow Advantages
Roughly 50% of the cost of traditional pipe replacement About 50% of the time vs traditional pipe replacement.
Industrial
ATK Boeing Space Systems Coca-Cola General Motors
Offices
Cushman Wakefield (e.g. 125 Broad Street, NY) Tishman Speyer (e.g. MetLife Building, NY) Irvine Company Office Properties
Education
Clemson University Oregon State University Rancho Bernardo High School Sunset Elementary School Ashland High School
Retail
Westfield Mall Longs Drug Stores
Sewers Gas pipelines Chemical / industrial pipelines Straight pipelines Pipelines with bends Circular pipes Non-circular pipes Pipelines with varying cross-section Pipelines with lateral connections Pipelines with deformation On-line replacement Pressure pipelines Man-entry pipelines
3.
The length of liner needed is cut, a custom two part epoxy is mixed and poured in to permeate the felt liner. The saturated liner is then pulled in place, the bladder is inflated and the curing begins. Once the epoxy lining has cured, the bladder is extracted, leaving a complete structural pipe within a pipe.
4.
Insuring Quality
To insure that the job has been performed perfectly, a camera is done to inspect the work and you receive a copy of this as well.
Molds to host pipe, stops leaks and root intrusion and can span void pipe sections
Can be installed under slab concrete from existing drain connection points and clean outs Laterals accurately reinstated with CCTV camera (no digging)
Schools
Industrial Facilities Churches
Location Louisville, KY
Work Performed Cleaned and lined twenty-one vertical sanitary drain stacks made of 3 cast iron pipe.
Work Performed A 16 foot, 3 in diameter drain, located under an elevator shaft was lined to stop leakage.
Location Manhattan, NY
Work Performed Clean and lined 10 roof drains that were encased in concrete pillars.
Location Washington, DC
Work Performed Two 70 foot roof drains, each containing a double 45 degree bend.
Work Performed Corroded cast iron floor drains were lined using high heat and a custom engineered corrosion resistant epoxy.
Location Gainesville, FL
Work Performed Cleaned and relined approximately 250 feet of 12 mainline pipe with limited access.
Work Performed Lined over 100 feet of 6 cast iron pipe including two 45 degree bends and one Y connection. All pipe was encased in concrete.
Work Performed 100 feet of 8 sanitary pipe was lined along with two lateral connections.
Work Performed The sounding pipe used in manual water measurement was lined to repair a badly corroded access point. Work was performed at Sea.
* Potable water systems require epoxies that are NSF-61 certified by the National Sanitation Foundation.
2.
Using the same compressed air, the pipes are sand blasted to remove corrosion and rust and to prepare the inside of the pipes for epoxy coating.
3.
A patented two-part epoxy is mixed and blown into the pipes using compressed air. Using valves to control the process, the epoxy is spread to an even layer throughout the entire piping system.
4.
The epoxy cures in 24 hours and the fixtures are reconnected and put back in service.
Less time
Permanent solution to corrosion
Environmental Benefits
Reduces landfill waste by not replacing pipe Extends useful life of existing pipe systems
Cost effective and fast Reduces downtime Non-disruptive to occupants Abatement minimized Molds left undisturbed
Schools
Industrial Facilities Churches
Naval Vessels
Residential Homes
Location Sarasota, FL
Work Performed Complete epoxy lining of all hot and cold domestic lines, chilled water cooling lines and all the sanitary drain lines.
Location Manhattan, NY
Work Performed 400 plus feet of 6 and 200 plus feet 8 galvanized pipe was rehabilitated using the Nu Flow in place pipe restoration method.
Location Seattle, WA
Work Performed Restore galvanized domestic water system in this 23-story luxury highrise condominium complex.
Location Manhattan, NY
Work Performed Epoxy lining of HVAC risers for this 40-story high-rise with no disruption to the daily function of the offices or tenants.
Location Houston, TX
Work Performed Restoration of the hot, cold and hot recirculation lines for all units. Pipe is galvanized and all work is being performed without displacing residents.
Location Houston, TX
Work Performed Restoration of the hot, cold and hot recirculation lines for all units. Pipe was galvanized and all work was performed without the need to displace residents.
Work Performed 400 feet of 4 concrete encased pipe was lined, repairing a leak and preventing further structural damage to the building.
Location Fort Drum, North Country New York, 10th Mountain Division Aircraft Hanger Work Performed Lining of the AFF fire suppression deluge system and the 100% AFFF distribution system.
Location Norfolk, VA
Work Performed Restore copper and nickel waste and discharge piping.
Location Escondido, CA
Work Performed Complete cleaning and lining of all domestic water lines in over 268 units. Pipe diameters ranged from to 3
Location Sandpoint, ID
Work Performed A 65 bed hospital with specialty, diagnostic and emergency service departments. All potable lines were coated with epoxy.
Satisfied Clients
Resources
www.nuflowtech.com www.wqa.org www.plumbingandhvac.ca www.no-dig.com www.nastt.org www.trenchlessonline.com